<Assignment> Element

There must be at least one assignment in each <Assignments> collection.

Element Properties

Property Value
Data Type ComplexType
Minimum Occurrences 0
Maximum Occurrences Unbounded
Default Value N/A
Abstract False
Nillable False
Element Constraints Sequence

Parent Elements

Assignments

Child Elements

List of Child Elements

Element Required/Optional Description
<UID> Required The unique ID for the assignment.
<TaskUID> Optional The unique ID for the task.
<ResourceUID> Optional The unique ID for the resource.
<PercentWorkComplete> Optional The current status of an assignment, expressed as the percentage of the assignment's work that has been completed.
<ActualCost> Optional The cost incurred for work already performed by a resource on a task.
<ActualFinish> Optional The date and time when an assignment was actually completed.
<ActualOvertimeCost> Optional The cost incurred for overtime work already performed by a resource on a task.
<ActualOvertimeWork> Optional The actual amount of overtime work already performed by a resource on an assigned task.
<ActualStart> Optional The date and time that an assignment actually began.
<ActualWork> Optional The amount of work that has already been done by a resource on a task.
<ACWP> Optional The costs incurred for work already performed by a resource on a task up to the project status date or today's date; also called actual cost of work performed.
<Confirmed> Optional Indicates whether a resource assigned to a task has accepted or rejected the task assignment.
<Cost> Optional The total scheduled (or projected) cost for an assignment.
<CostRateTable> Optional Indicates which cost rate table to use for a resource on an assignment.
<CostVariance> Optional The difference between the baseline cost and total cost for an assignment.
<CV> Optional The difference between how much it should have cost to achieve the current level of completion on the assignment and how much it has actually cost.
<Delay> Optional The amount of time a resource is to wait after the task start date before starting work on an assignment.
<Finish> Optional The date and time that an assigned resource is scheduled to complete work on a task.
<FinishVariance> Optional The difference between an assignment's baseline finish date and its scheduled finish date.
<Hyperlink> Optional The title or explanatory text for a hyperlink associated with an assignment.
<HyperlinkAddress> Optional The address for a hyperlink associated with an assignment.
<HyperlinkSubAddress> Optional The specific location in a document within a hyperlink associated with an assignment.
<WorkVariance> Optional The difference between an assignment's baseline work and the currently scheduled work.
<HasFixedRateUnits> Optional Indicates whether an assignment has fixed rate units.
<FixedMaterial> Optional Indicates whether the consumption of the assigned material resource occurs in a single, fixed amount.
<LevelingDelay> Optional The amount of time that an assignment is to be delayed from the scheduled start date as a result of resource leveling.
<LevelingDelayFormat> Optional The format for expressing the duration of the delay.
<LinkedFields> Optional Indicates whether there are OLE links to the assignment.
<Milestone> Optional Indicates whether the assignment task is a milestone.
<Notes> Optional Notes about an assignment.
<Overallocated> Optional Indicates whether a resource is assigned to more work on a specific task than can be done within the resource's normal working capacity.
<OvertimeCost> Optional The total overtime cost for a resource assignment.
<OvertimeWork> Optional The amount of overtime to be performed by a resource on a task; charged at the resource's overtime rate.
<RegularWork> Optional The total amount of non-overtime work scheduled to be performed by a resource assigned to a task.
<RemainingCost> Optional The costs associated with completing all remaining scheduled work by any resources on a specific task.
<RemainingOvertimeCost> Optional The remaining scheduled overtime expense for an assignment.
<RemainingOvertimeWork> Optional The amount of overtime work that remains on an assignment.
<RemainingWork> Optional The amount of time required by a resource assigned to a task to complete an assignment.
<ResponsePending> Optional Indicates whether an answer has been received from a message sent to a resource assigned to a task notifying the resource of the assignment.
<Start> Optional The date and time that an assigned resource is scheduled to begin working on a task.
<Stop> Optional The date the assignment was stopped.
<Resume> Optional The date the assignment was resumed.
<StartVariance> Optional The difference between an assignment's baseline start date and its currently scheduled start date.
<Units> Optional The number of units for which a resource is assigned to a task, expressed as a percentage.
<UpdateNeeded> Optional Indicates whether a TeamUpdate message should be sent to the resource assigned to a task because of changes to the start date, finish date, or resource reassignments.
<VAC> Optional The variance at completion (VAC) between the baseline cost and the total cost for an assignment on a task.
<Work> Optional The total amount of work scheduled to be performed by a resource on a task.
<WorkContour> Optional Indicates how work for an assignment is to be distributed across the duration of the assignment.
<BCWS> Optional The budgeted cost of work scheduled on the assignment.
<BCWP> Optional The budgeted cost of the work performed on the assignment to-date.
<BookingType> Optional Specifies the booking type of the assignment (committed or proposed).
<ActualWorkProtected> Optional Specifies the duration through which actual work is protected.
<ActualOvertimeWorkProtected> Optional Specifies the duration through which actual overtime work is protected.
<CreationDate> Optional The date that the assignment was created.
<ExtendedAttribute> Optional The value of an extended attribute (custom field).
<Baseline> Optional The collection of baseline values associated with the assignment.
<TimephasedData> Optional The time phased data associated with the assignment.

See Also

XML Schema for the <Assignment> Element
XML Structure for the <Assignment> Element