<Resume> Element

For a <Task>, <Resume> is the date the remaining portion of a task is scheduled to resume.

For an <Assignment>, it is the date that the assignment resumed.

Element Properties

Property Value
Data Type DateTime
Minimum Occurrences 0
Maximum Occurrences 1
Default Value N/A
Abstract False
Nillable False
Element Constraints N/A

Parent Elements

Task
Assignment

See Also

XML Schema for the <Task> Element
XML Structure for the <Task> Element

XML Schema for the <Assignment> Element
XML Structure for the <Assignment> Element