<OvertimeCost> Element

For a <Task>, <OvertimeCost> is the sum of the actual overtime cost for the task.

For a <Resource>, it is the total overtime cost for a resource on all assigned tasks.

For an <Assignment>, it is the total overtime cost for a resource assignment.

Element Properties

Property Value
Data Type Decimal
Minimum Occurrences 0
Maximum Occurrences 1
Default Value N/A
Abstract False
Nillable False
Element Constraints N/A

Parent Elements

Task
Resource
Assignment

See Also

XML Schema for the <Task> Element
XML Structure for the <Task> Element

XML Schema for the <Resource> Element
XML Structure for the <Resource> Element

XML Schema for the <Assignment> Element
XML Structure for the <Assignment> Element