Assignment Element
There must be at least one assignment in each Assignments collection.
<Assignment>
ComplexTypeValue
</Assignment>
Parent Elements
Child Elements
Element |
Required / Optional |
Description |
---|---|---|
Required |
The unique ID for the assignment. |
|
Optional |
The GUID for the assignment. |
|
Optional |
The unique ID for the task. |
|
Optional |
The unique ID for the resource. |
|
Optional |
The current status of an assignment, expressed as the percentage of the assignment's work that has been completed. |
|
Optional |
The cost incurred for work already performed by a resource on a task. |
|
Optional |
The date and time when an assignment was actually completed. |
|
Optional |
The cost incurred for overtime work already performed by a resource on a task. |
|
Optional |
The actual amount of overtime work already performed by a resource on an assigned task. |
|
Optional |
The date and time that an assignment actually began. |
|
Optional |
The amount of work that has already been done by a resource on a task. |
|
Optional |
The costs incurred for work already performed by a resource on a task up to the project status date or today's date; also called actual cost of work performed. |
|
Optional |
Indicates whether a resource assigned to a task has accepted or rejected the task assignment. |
|
Optional |
The total scheduled (or projected) cost for an assignment. |
|
Optional |
Indicates which cost rate table to use for a resource on an assignment. |
|
Optional |
The difference between the baseline cost and total cost for an assignment. |
|
Optional |
The difference between how much it should have cost to achieve the current level of completion on the assignment and how much it has actually cost. |
|
Optional |
The amount of time a resource is to wait after the task start date before starting work on an assignment. |
|
Optional |
The date and time that an assigned resource is scheduled to complete work on a task. |
|
Optional |
The difference between an assignment's baseline finish date and its scheduled finish date. |
|
Optional |
The title or explanatory text for a hyperlink associated with an assignment. |
|
Optional |
The address for a hyperlink associated with an assignment. |
|
Optional |
The specific location in a document within a hyperlink associated with an assignment. |
|
Optional |
The difference between an assignment's baseline work and the currently scheduled work. |
|
Optional |
Indicates whether an assignment has fixed rate units. |
|
Optional |
Indicates whether the consumption of the assigned material resource occurs in a single, fixed amount. |
|
Optional |
The amount of time that an assignment is to be delayed from the scheduled start date as a result of resource leveling. |
|
Optional |
The format for expressing the duration of the delay. |
|
Optional |
Indicates whether there are OLE links to the assignment. |
|
Optional |
Indicates whether the assignment task is a milestone. |
|
Optional |
Notes about an assignment. |
|
Optional |
Indicates whether a resource is assigned to more work on a specific task than can be done within the resource's normal working capacity. |
|
Optional |
The total overtime cost for a resource assignment. |
|
Optional |
The amount of overtime to be performed by a resource on a task; charged at the resource's overtime rate. |
|
Optional |
The total amount of non-overtime work scheduled to be performed by a resource assigned to a task. |
|
Optional |
The costs associated with completing all remaining scheduled work by any resources on a specific task. |
|
Optional |
The remaining scheduled overtime expense for an assignment. |
|
Optional |
The amount of overtime work that remains on an assignment. |
|
Optional |
The amount of time required by a resource assigned to a task to complete an assignment. |
|
Optional |
Indicates whether an answer has been received from a message sent to a resource assigned to a task notifying the resource of the assignment. |
|
Optional |
The date and time that an assigned resource is scheduled to begin working on a task. |
|
Optional |
The date the assignment was stopped. |
|
Optional |
The date the assignment was resumed. |
|
Optional |
The difference between an assignment's baseline start date and its currently scheduled start date. |
|
Optional |
New for Project 2007. Indicates whether an assignment is for a summary task. |
|
Optional |
The earned value schedule variance, through the project status date |
|
Optional |
The number of units for which a resource is assigned to a task, expressed as a percentage. |
|
Optional |
Indicates whether a TeamUpdate message should be sent to the resource assigned to a task because of changes to the start date, finish date, or resource reassignments. |
|
Optional |
The variance at completion (VAC) between the baseline cost and the total cost for an assignment on a task. |
|
Optional |
The total amount of work scheduled to be performed by a resource on a task. |
|
Optional |
Indicates how work for an assignment is to be distributed across the duration of the assignment. |
|
Optional |
The budgeted cost of work scheduled on the assignment. |
|
Optional |
The budgeted cost of the work performed on the assignment to-date. |
|
Optional |
Specifies the booking type of the assignment (committed or proposed). |
|
Optional |
Specifies the duration through which actual work is protected. |
|
Optional |
Specifies the duration through which actual overtime work is protected. |
|
Optional |
The date that the assignment was created. |
|
Optional |
New for Project 2007. The name of the assignment owner. |
|
Optional |
New for Project 2007. The GUID of the assignment owner. |
|
Optional |
New for Project 2007. The budgeted amount for cost resources on this assignment. |
|
Optional |
New for Project 2007. The budgeted work amount for work or material resources on this assignment. |
|
Optional |
The value of an extended attribute (custom field). |
|
Optional |
The collection of baseline values associated with the assignment. |
|
Optional |
New for Project 2007. An assignment-level local custom field value. |
|
Optional |
New for Project 2007. An assignment-level enterprise custom field value. |
|
Optional |
Information about the assignment that is distributed over time. |
|
Optional |
This value is true if the note for an assignment contains an object. |
|
Optional |
Collection of Enterprise Custom Fields with lookup table values. |
Occurrences
Minimum: 0 Maximum: Unbounded |
See Also
Concepts
Assignment Elements and XML Structure