OvertimeCost Element
For a Task, OvertimeCost is the sum of the actual overtime cost for the task.
For a Resource, it is the total overtime cost for a resource on all assigned tasks.
For an Assignment, it is the total overtime cost for a resource assignment.
<OvertimeCost>
DecimalValue
</OvertimeCost>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
See Also
Concepts
Task Elements and XML Structure
XML Schema for the Tasks Element
Resource Elements and XML Structure
XML Schema for the Resources Element