WorkContour Element
Indicates how work is to be distributed across the duration of the assignment.
<WorkContour>
IntegerValue
</WorkContour>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
Indicates how work is to be distributed across the duration of the assignment.
<WorkContour>
IntegerValue
</WorkContour>
Minimum: 0 Maximum: 1 |