BudgetWork Element
The budgeted work amount for work or material resources on an assignment.
<BudgetWork>
DurationValue
</BudgetWork>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
Text Value
A text value of type duration is required.
The budgeted work amount for work or material resources on an assignment.
<BudgetWork>
DurationValue
</BudgetWork>
Minimum: 0 Maximum: 1 |
A text value of type duration is required.