Unit Cost per Field, Routing Line Table
Specifies the task-related production costs.
This value is used in the unit cost calculation.
There are two ways to enter calculation rates. If you want to calculate with a uniform calculation rate per capacity, this is saved in the Unit Cost field on the work center card. However, if you want work with different cost rates that depend on the operation, you can control this with the Specific Unit Cost field on the work center card.
Tip
For more information on how to work with fields and columns, see Work with Data. For assistance in finding specific pages, see Search.
Parent Tables
Table | Location |
---|---|
Routing Line Table | Manufacturing |
Routing Line Table | Manufacturing |