Compartir a través de


Set up advanced ledger entries (Public sector)

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

If your organization is in the public sector, you can use advanced ledger entries to create, adjust, and reverse ledger entries. For example, you could use advanced ledger entries to reclassify expenditures if invoices had been mistakenly posted to the wrong account or project.

When you use advanced ledger entries, you must use General ledger posting definitions. Posting definitions can be set up to reclassify expenditures from one fund to another. On the Advanced ledger entry form, you can identify project information, use workflow approvals, perform budget checks, and preview the ledger entries before they are posted to the ledger.

Set up advanced ledger entries

  1. Required: Verify that the Advanced ledger entry License configuration key is enabled. (System administration > Setup > Licensing > License configuration > General ledger > Advanced ledger entry.)

  2. Required: In the Number sequences area of the General ledger parameters form, set up the Advanced ledger entry and Advanced ledger entry voucher number sequences. For more information, see Información general de secuencias numéricas.

  3. Required: Set up posting definitions for the General ledger module on the Posting definitions form. For more information, see Acerca de las definiciones de contabilización and Configuración de definiciones de contabilización.

  4. Optional: Set up projects. For information, see Gestión de proyectos y contabilidad and Crear un proyecto.

  5. Optional: Set up advanced ledger entry workflows. For more information, see About advanced ledger entry workflows (Public sector), Configuración de flujos de trabajo de Contabilidad general, and Flujo de trabajo para Microsoft Dynamics AX.

  6. Optional: Set up budget control following the procedures outlined in Configurar el control presupuestario.

    In the Select source documents area of the Budget control configuration form, select the Advanced ledger entries check box to enable budget control for advanced ledger entries. You can also select the Enable budget control for line item on entry check box to enable budget checks when an advanced ledger entry line is saved.

  7. Optional: In the Ledger area of the General ledger parameters form, under Project, you can select the Allow the financial dimensions to be edited on the advanced ledger entry form check box.

    Nota

    With this check box selected, you can change the financial dimensions for a project in the Ledger account field in an advanced ledger entry line. If this check box is not selected, you can change the financial dimensions in the Ledger account field as long as the financial dimensions are not the default financial dimensions for a project.

  8. Optional: In the Batch transfer rules area of General ledger parameters form, you can set up a batch transfer rule for advanced ledger entries.

See also

Create and post advanced ledger entries (Public sector)

Advanced ledger entry (form) (Public sector)