Alphabetical List of Elements and Types
本文內容
This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.
This topic includes the alphabetical list of elements and data types in the Microsoft Office Project 2007 XML Data Interchange Schema (mspdi_pj12.xsd).
A
B
C
D
E
F
G - H
I
L
M
N
O
P
R
S
T
U - V
W
The standard schema data types defined at http://www.w3.org/2001/XMLSchema (integer, string, Boolean, and so on) are not included in this list. The only additional data type defined in Project is TimephasedDataType.
New elements in Project 2007 are marked (new) . For more information, see New XML Elements . Attributes are not included in the list, because the schema includes only standard attributes (name, minOccurs, maxOccurs, type, base, and default).
Many elements in the Project Data Interchange Schema represent data fields in Project 2007. For more information about fields in Microsoft Office Project Professional 2007 and Project Standard 2007, see Fields Reference .
A
AccrueAt Element
ActiveDirectoryGUID Element
ActualCost Element
ActualDuration Element
ActualFinish Element
ActualOvertimeCost Element
ActualOvertimeWork Element
ActualOvertimeWorkProtected Element
ActualsInSync Element
ActualStart Element
ActualWork Element
ActualWorkProtected Element
ACWP Element
AdminProject Element
Alias Element
AllLevelsRequired Element
AppendNewValues Element
Assignment Element
Assignments Element
AssnOwner Element (new)
AssnOwnerGuid Element (new)
Author Element
AutoAddNewResourcesAndTasks Element
Autolink Element
AutoRollDown Element (new)
AvailabilityPeriod Element
AvailabilityPeriods Element
AvailableFrom Element
AvailableTo Element
AvailableUnits Element
B
b408000 - b417fff Elements (new)
b608000 - b617fff Elements (new)
BaseCalendarUID Element
Baseline Element
BaselineForEarnedValue Element
BCWP Element
BCWS Element
BookingType Element
BookingType Element
BudgetCost Element (new)
BudgetWork Element (new)
C
c408000 - c417fff Elements (new)
CalculationType Element
Calendar Element
Calendars Element
CalendarUID Element
CanLevel Element
Category Element
CFType Element (new)
Code Element
CommitmentFinish Element (new)
CommitmentStart Element (new)
CommitmentType Element (new)
Company Element
Confirmed Element
ConstraintDate Element
ConstraintType Element
Contact Element
Cost Element
CostPerUse Element
CostRateTable Element
CostVariance Element
CreateDate Element
CreationDate Element
Critical Element
CriticalSlackLimit Element
CrossProject Element
CrossProjectName Element
CurrencyDigits Element
CurrencyCode Element (new)
CurrencySymbol Element
CurrencySymbolPosition Element
CurrentDate Element
CV Element
D
DaysOfWeek Element (new)
DaysPerMonth Element
DayType Element
DayWorking Element
Deadline Element
Default Element
DefaultFinishTime Element
DefaultFixedCostAccrual Element
DefaultGuid Element (new)
DefaultOvertimeRate Element
DefaultStandardRate Element
DefaultStartTime Element
DefaultTaskEVMethod Element
DefaultTaskType Element
Delay Element
Description Element
Duration Element
DurationFormat Element
E
EarlyFinish Element
EarlyStart Element
EarnedValueMethod Element
EditableActualCosts Element
EffortDriven Element
ElemType Element (new)
EmailAddress Element
EnteredByOccurrences Element (new)
Enterprise Element
EnterpriseOutlineCodeAlias Element
Estimated Element
EstimatedDuration Element
Exception Element (new)
Exceptions Element (new)
ExtendedAttribute Element
ExtendedAttributes Element
ExtendedCreationDate Element
ExternalTask Element
ExternalTaskProject Element
F
f404000 - f4040c8 Elements (new)
f408000 - f417fff Elements (new)
FieldGUID Element (new)
FieldID Element
FieldName Element
Finish Element
FinishDate Element
FinishVariance Element
FiscalYearStart Element
FixedCost Element (new in Baseline)
FixedCostAccrual Element
FixedMaterial Element
Formula Element
FreeSlack Element
FromDate Element
FromTime Element
FYStartDate Element
G - H
GenerateCodes Element
Group Element
Guid Element (new)
HasFixedRateUnits Element
HideBar Element
HonorConstraints Element
Hyperlink Element
HyperlinkAddress Element
HyperlinkSubAddress Element
I
ID Element
IgnoreResourceCalendar Element
Initials Element
InsertedProjectsLikeSummary Element
Interim Element
IsBaseCalendar Element
IsBudget Element (new)
IsCostResource Element (new)
IsEnterprise Element
IsGeneric Element
IsInactive Element
IsNull Element
IsPublished Element (new)
IsSubproject Element
IsSubprojectReadOnly Element
L
LagFormat Element
LastSaved Element
LateFinish Element
LateStart Element
LeafOnly Element
Length Element
Level Element
LevelAssignments Element
LevelingCanSplit Element
LevelingDelay Element
LevelingDelayFormat Element
LinkedFields Element
LinkLag Element
Ltuid Element (new)
M
Manager Element
Mask Element
Masks Element
MaterialLabel Element
MaxMultiValues Element (new)
MaxUnits Element
MicrosoftProjectServerURL Element
Milestone Element
MinutesPerDay Element
MinutesPerWeek Element
Month Element (new)
MonthDay Element (new)
MonthItem Element (new)
MonthPosition Element (new)
MoveCompletedEndsBack Element
MoveCompletedEndsForward Element
MoveRemainingStartsBack Element
MoveRemainingStartsForward Element
MultipleCriticalPaths Element
N
Name Element (new in Exception and WorkWeek)
NewTasksEffortDriven Element
NewTasksEstimated Element
NewTaskStartDate Element
Notes Element
NTAccount Element
Number Element
O
Occurrences Element (new)
OnlyTableValuesAllowed Element
OutlineCode Element
OutlineCodes Element
OutlineLevel Element
OutlineNumber Element
OverAllocated Element
OvertimeCost Element
OvertimeRate Element
OvertimeRateFormat Element
OvertimeWork Element
P
ParentValueID Element
PeakUnits Element (new in Assignment)
PercentComplete Element
PercentWorkComplete Element
Period Element (new)
Phonetic Element (new)
PhoneticAlias Element
Phonetics Element
PhysicalPercentComplete Element
PredecessorLink Element
PredecessorUID Element
Prefix Element
PreLeveledFinish Element
PreLeveledStart Element
Priority Element
Project Element
ProjectExternallyEdited Element
R
Rate Element
Rates Element
RatesFrom Element
RatesTo Element
RateTable Element
Recurring Element
RegularWork Element
RegularWork Element
RemainingCost Element
RemainingDuration Element
RemainingOvertimeCost Element
RemainingOvertimeWork Element
RemainingWork Element
RemoveFileProperties Element
Resource Element
Resources Element
ResourceSubstitutionEnabled Element
ResourceUID Element
ResponsePending Element
RestrictValues Element
Resume Element
ResumeValid Element
Revision Element
Rollup Element
RollupType Element
S
SaveVersion Element (new)
ScheduleFromStart Element
SecondaryPID Element (new)
Separator Element
SplitsInProgressTasks Element
SpreadActualCost Element
SpreadPercentComplete Element
StandardRate Element
StandardRateFormat Element
Start Element
StartDate Element
StartVariance Element
StatusDate Element
StatusManager Element (new)
Stop Element
Subject Element
SubprojectName Element
Summary Element (new in Assignment)
SV Element
T
Task Element
Tasks Element
TaskUID Element
TaskUpdatesResource Element
TimePeriod Element
TimephasedData Element
TimephasedDataType Structure and Schema
Title Element
ToDate Element
TotalSlack Element
ToTime Element
Type Element (new in Exception)
U - V
UID Element
Unit Element
Units Element
UpdateNeeded Element
UserDef Element (new)
VAC Element
Value Element
ValueGUID Element
ValueID Element
ValueList Element
ValuelistSortOrder Element
Values Element
VerifyUniqueCodes Element
W
WBS Element
WBSLevel Element
WBSMask Element
WBSMasks Element
WeekDay Element
WeekDays Element
WeekStartDay Element
Work Element
WorkContour Element
WorkFormat Element
WorkGroup Element
WorkingTime Element
WorkingTimes Element
WorkVariance Element
WorkWeek Element (new)
WorkWeeks Element (new)
See Also
Concepts
Introduction to Project XML Data
Project Data Interchange Elements
Other Resources
Changes in the Project 2007 XML Data Interchange Schema
Fields Reference