共用方式為


Roll Up Standard Cost Batch Job

Rolls up the standard costs of assembled and manufactured items. These will be influenced by the change in standard costs of components suggested by the Suggest Item Standard Cost batch job. In addition, they will be influenced by the change in standard cost of production capacity and assembly resources suggested by the Suggest Work/Mach Ctr Std Cost batch job.

Once you have run either or both of these batch jobs and you do the roll-up, then all changes to the standard costs in the worksheet are introduced in the associated production or assembly BOMs, and the costs are applied at each BOM level.

Note

This function only rolls up the standard cost on the item cards, not on the SKU cards.

This batch job only creates suggestions. It does not implement the suggested changes. If you are satisfied with the suggestions and want to implement them, that is update them on the item cards and insert them in the Revaluation Journal window, then you can use the Implement Standard Cost Change batch job. You access this batch job from the Standard Cost Worksheet window.

Options

Calculation Date: Enter the date that applies to the production BOM version you want to do the roll-up for.

Tip

For more information on how to work with batch jobs, see How to: Run Batch Jobs and How to: Set Filters. For assistance in finding specific pages, see Search.

See Also

Other Resources

Standard Cost Worksheet
About Calculating Standard Cost
How to: Update Standard Costs
Assembly BOMs or Production BOMs
Design Details: Assembly Order Posting
Manage Costs