編輯

共用方式為


PjAssignmentField Enum

Definition

public enum class PjAssignmentField
[System.Runtime.InteropServices.Guid("6CC0AB34-3931-11D2-AE4C-00C04FB6F701")]
public enum PjAssignmentField
type PjAssignmentField = 
Public Enum PjAssignmentField
Inheritance
PjAssignmentField
Attributes

Fields

Name Value Description
pjAssignmentUniqueID 255852544
pjAssignmentTaskUniqueID 255852545
pjAssignmentResourceUniqueID 255852546
pjAssignmentTaskID 255852547
pjAssignmentResourceID 255852548
pjAssignmentTaskName 255852549
pjAssignmentResourceName 255852550
pjAssignmentAssignmentUnits 255852551
pjAssignmentWork 255852552
pjAssignmentOvertimeWork 255852553
pjAssignmentActualWork 255852554
pjAssignmentRegularWork 255852555
pjAssignmentRemainingWork 255852556
pjAssignmentActualOvertimeWork 255852557
pjAssignmentRemainingOvertimeWork 255852558
pjAssignmentBaselineWork 255852560
pjAssignmentPeak 255852563
pjAssignmentStart 255852564
pjAssignmentFinish 255852565
pjAssignmentActualStart 255852566
pjAssignmentActualFinish 255852567
pjAssignmentDelay 255852569
pjAssignmentCost 255852570
pjAssignmentOvertimeCost 255852571
pjAssignmentActualCost 255852572
pjAssignmentRemainingCost 255852573
pjAssignmentActualOvertimeCost 255852574
pjAssignmentRemainingOvertimeCost 255852575
pjAssignmentBaselineCost 255852576
pjAssignmentBCWS 255852578
pjAssignmentBCWP 255852579
pjAssignmentACWP 255852580
pjAssignmentSV 255852581
pjAssignmentCostVariance 255852582
pjAssignmentWorkContour 255852583
pjAssignmentPercentWorkComplete 255852587
pjAssignmentProject 255852588
pjAssignmentNotes 255852615
pjAssignmentConfirmed 255852616
pjAssignmentResponsePending 255852617
pjAssignmentUpdateNeeded 255852618
pjAssignmentTeamStatusPending 255852619
pjAssignmentCostRateTable 255852624
pjAssignmentText1 255852632
pjAssignmentText2 255852633
pjAssignmentText3 255852634
pjAssignmentText4 255852635
pjAssignmentText5 255852636
pjAssignmentText6 255852637
pjAssignmentText7 255852638
pjAssignmentText8 255852639
pjAssignmentText9 255852640
pjAssignmentText10 255852641
pjAssignmentStart1 255852642
pjAssignmentStart2 255852643
pjAssignmentStart3 255852644
pjAssignmentStart4 255852645
pjAssignmentStart5 255852646
pjAssignmentFinish1 255852647
pjAssignmentFinish2 255852648
pjAssignmentFinish3 255852649
pjAssignmentFinish4 255852650
pjAssignmentFinish5 255852651
pjAssignmentNumber1 255852652
pjAssignmentNumber2 255852653
pjAssignmentNumber3 255852654
pjAssignmentNumber4 255852655
pjAssignmentNumber5 255852656
pjAssignmentDuration1 255852657
pjAssignmentDuration2 255852658
pjAssignmentDuration3 255852659
pjAssignmentCost1 255852663
pjAssignmentCost2 255852664
pjAssignmentCost3 255852665
pjAssignmentFlag10 255852666
pjAssignmentFlag1 255852667
pjAssignmentFlag2 255852668
pjAssignmentFlag3 255852669
pjAssignmentFlag4 255852670
pjAssignmentFlag5 255852671
pjAssignmentFlag6 255852672
pjAssignmentFlag7 255852673
pjAssignmentFlag8 255852674
pjAssignmentFlag9 255852675
pjAssignmentLinkedFields 255852676
pjAssignmentOverallocated 255852679
pjAssignmentTaskSummaryName 255852686
pjAssignmentLevelingDelay 255852689
pjAssignmentBaselineStart 255852690
pjAssignmentBaselineFinish 255852691
255852696
pjAssignmentHyperlinkAddress 255852697
pjAssignmentHyperlinkSubAddress 255852698
pjAssignmentHyperlinkHREF 255852699
pjAssignmentCost4 255852703
pjAssignmentCost5 255852704
pjAssignmentCost6 255852705
pjAssignmentCost7 255852706
pjAssignmentCost8 255852707
pjAssignmentCost9 255852708
pjAssignmentCost10 255852709
pjAssignmentDate1 255852710
pjAssignmentDate2 255852711
pjAssignmentDate3 255852712
pjAssignmentDate4 255852713
pjAssignmentDate5 255852714
pjAssignmentDate6 255852715
pjAssignmentDate7 255852716
pjAssignmentDate8 255852717
pjAssignmentDate9 255852718
pjAssignmentDate10 255852719
pjAssignmentDuration4 255852720
pjAssignmentDuration5 255852721
pjAssignmentDuration6 255852722
pjAssignmentDuration7 255852723
pjAssignmentDuration8 255852724
pjAssignmentDuration9 255852725
pjAssignmentDuration10 255852726
pjAssignmentFinish6 255852727
pjAssignmentFinish7 255852728
pjAssignmentFinish8 255852729
pjAssignmentFinish9 255852730
pjAssignmentFinish10 255852731
pjAssignmentFlag11 255852732
pjAssignmentFlag12 255852733
pjAssignmentFlag13 255852734
pjAssignmentFlag14 255852735
pjAssignmentFlag15 255852736
pjAssignmentFlag16 255852737
pjAssignmentFlag17 255852738
pjAssignmentFlag18 255852739
pjAssignmentFlag19 255852740
pjAssignmentFlag20 255852741
pjAssignmentNumber6 255852742
pjAssignmentNumber7 255852743
pjAssignmentNumber8 255852744
pjAssignmentNumber9 255852745
pjAssignmentNumber10 255852746
pjAssignmentNumber11 255852747
pjAssignmentNumber12 255852748
pjAssignmentNumber13 255852749
pjAssignmentNumber14 255852750
pjAssignmentNumber15 255852751
pjAssignmentNumber16 255852752
pjAssignmentNumber17 255852753
pjAssignmentNumber18 255852754
pjAssignmentNumber19 255852755
pjAssignmentNumber20 255852756
pjAssignmentStart6 255852757
pjAssignmentStart7 255852758
pjAssignmentStart8 255852759
pjAssignmentStart9 255852760
pjAssignmentStart10 255852761
pjAssignmentText11 255852762
pjAssignmentText12 255852763
pjAssignmentText13 255852764
pjAssignmentText14 255852765
pjAssignmentText15 255852766
pjAssignmentText16 255852767
pjAssignmentText17 255852768
pjAssignmentText18 255852769
pjAssignmentText19 255852770
pjAssignmentText20 255852771
pjAssignmentText21 255852772
pjAssignmentText22 255852773
pjAssignmentText23 255852774
pjAssignmentText24 255852775
pjAssignmentText25 255852776
pjAssignmentText26 255852777
pjAssignmentText27 255852778
pjAssignmentText28 255852779
pjAssignmentText29 255852780
pjAssignmentText30 255852781
pjAssignmentIndex 255852790
pjAssignmentCV 255852791
pjAssignmentWorkVariance 255852792
pjAssignmentStartVariance 255852806
pjAssignmentFinishVariance 255852807
pjAssignmentVAC 255852815
pjAssignmentFixedMaterialAssignment 255852819
pjAssignmentResourceType 255852820
pjAssignmentHyperlinkScreenTip 255852823
pjAssignmentWBS 255852830
pjAssignmentBaseline1Work 255852833
pjAssignmentBaseline1Cost 255852834
pjAssignmentBaseline1Start 255852839
pjAssignmentBaseline1Finish 255852840
pjAssignmentBaseline2Work 255852842
pjAssignmentBaseline2Cost 255852843
pjAssignmentBaseline2Start 255852848
pjAssignmentBaseline2Finish 255852849
pjAssignmentBaseline3Work 255852851
pjAssignmentBaseline3Cost 255852852
pjAssignmentBaseline3Start 255852857
pjAssignmentBaseline3Finish 255852858
pjAssignmentBaseline4Work 255852860
pjAssignmentBaseline4Cost 255852861
pjAssignmentBaseline4Start 255852866
pjAssignmentBaseline4Finish 255852867
pjAssignmentBaseline5Work 255852869
pjAssignmentBaseline5Cost 255852870
pjAssignmentBaseline5Start 255852875
pjAssignmentBaseline5Finish 255852876
pjAssignmentBaseline6Work 255852878
pjAssignmentBaseline6Cost 255852879
pjAssignmentBaseline6Start 255852884
pjAssignmentBaseline6Finish 255852885
pjAssignmentBaseline7Work 255852887
pjAssignmentBaseline7Cost 255852888
pjAssignmentBaseline7Start 255852893
pjAssignmentBaseline7Finish 255852894
pjAssignmentBaseline8Work 255852896
pjAssignmentBaseline8Cost 255852897
pjAssignmentBaseline8Start 255852902
pjAssignmentBaseline8Finish 255852903
pjAssignmentBaseline9Work 255852905
pjAssignmentBaseline9Cost 255852906
pjAssignmentBaseline9Start 255852911
pjAssignmentBaseline9Finish 255852912
pjAssignmentBaseline10Work 255852914
pjAssignmentBaseline10Cost 255852915
pjAssignmentBaseline10Start 255852920
pjAssignmentBaseline10Finish 255852921
pjAssignmentTaskOutlineNumber 255852923
pjAssignmentEnterpriseCost1 255852925
pjAssignmentEnterpriseCost2 255852926
pjAssignmentEnterpriseCost3 255852927
pjAssignmentEnterpriseCost4 255852928
pjAssignmentEnterpriseCost5 255852929
pjAssignmentEnterpriseCost6 255852930
pjAssignmentEnterpriseCost7 255852931
pjAssignmentEnterpriseCost8 255852932
pjAssignmentEnterpriseCost9 255852933
pjAssignmentEnterpriseCost10 255852934
pjAssignmentEnterpriseDate1 255852935
pjAssignmentEnterpriseDate2 255852936
pjAssignmentEnterpriseDate3 255852937
pjAssignmentEnterpriseDate4 255852938
pjAssignmentEnterpriseDate5 255852939
pjAssignmentEnterpriseDate6 255852940
pjAssignmentEnterpriseDate7 255852941
pjAssignmentEnterpriseDate8 255852942
pjAssignmentEnterpriseDate9 255852943
pjAssignmentEnterpriseDate10 255852944
pjAssignmentEnterpriseDate11 255852945
pjAssignmentEnterpriseDate12 255852946
pjAssignmentEnterpriseDate13 255852947
pjAssignmentEnterpriseDate14 255852948
pjAssignmentEnterpriseDate15 255852949
pjAssignmentEnterpriseDate16 255852950
pjAssignmentEnterpriseDate17 255852951
pjAssignmentEnterpriseDate18 255852952
pjAssignmentEnterpriseDate19 255852953
pjAssignmentEnterpriseDate20 255852954
pjAssignmentEnterpriseDate21 255852955
pjAssignmentEnterpriseDate22 255852956
pjAssignmentEnterpriseDate23 255852957
pjAssignmentEnterpriseDate24 255852958
pjAssignmentEnterpriseDate25 255852959
pjAssignmentEnterpriseDate26 255852960
pjAssignmentEnterpriseDate27 255852961
pjAssignmentEnterpriseDate28 255852962
pjAssignmentEnterpriseDate29 255852963
pjAssignmentEnterpriseDate30 255852964
pjAssignmentEnterpriseDuration1 255852965
pjAssignmentEnterpriseDuration2 255852966
pjAssignmentEnterpriseDuration3 255852967
pjAssignmentEnterpriseDuration4 255852968
pjAssignmentEnterpriseDuration5 255852969
pjAssignmentEnterpriseDuration6 255852970
pjAssignmentEnterpriseDuration7 255852971
pjAssignmentEnterpriseDuration8 255852972
pjAssignmentEnterpriseDuration9 255852973
pjAssignmentEnterpriseDuration10 255852974
pjAssignmentEnterpriseFlag1 255852985
pjAssignmentEnterpriseFlag2 255852986
pjAssignmentEnterpriseFlag3 255852987
pjAssignmentEnterpriseFlag4 255852988
pjAssignmentEnterpriseFlag5 255852989
pjAssignmentEnterpriseFlag6 255852990
pjAssignmentEnterpriseFlag7 255852991
pjAssignmentEnterpriseFlag8 255852992
pjAssignmentEnterpriseFlag9 255852993
pjAssignmentEnterpriseFlag10 255852994
pjAssignmentEnterpriseFlag11 255852995
pjAssignmentEnterpriseFlag12 255852996
pjAssignmentEnterpriseFlag13 255852997
pjAssignmentEnterpriseFlag14 255852998
pjAssignmentEnterpriseFlag15 255852999
pjAssignmentEnterpriseFlag16 255853000
pjAssignmentEnterpriseFlag17 255853001
pjAssignmentEnterpriseFlag18 255853002
pjAssignmentEnterpriseFlag19 255853003
pjAssignmentEnterpriseFlag20 255853004
pjAssignmentEnterpriseNumber1 255853005
pjAssignmentEnterpriseNumber2 255853006
pjAssignmentEnterpriseNumber3 255853007
pjAssignmentEnterpriseNumber4 255853008
pjAssignmentEnterpriseNumber5 255853009
pjAssignmentEnterpriseNumber6 255853010
pjAssignmentEnterpriseNumber7 255853011
pjAssignmentEnterpriseNumber8 255853012
pjAssignmentEnterpriseNumber9 255853013
pjAssignmentEnterpriseNumber10 255853014
pjAssignmentEnterpriseNumber11 255853015
pjAssignmentEnterpriseNumber12 255853016
pjAssignmentEnterpriseNumber13 255853017
pjAssignmentEnterpriseNumber14 255853018
pjAssignmentEnterpriseNumber15 255853019
pjAssignmentEnterpriseNumber16 255853020
pjAssignmentEnterpriseNumber17 255853021
pjAssignmentEnterpriseNumber18 255853022
pjAssignmentEnterpriseNumber19 255853023
pjAssignmentEnterpriseNumber20 255853024
pjAssignmentEnterpriseNumber21 255853025
pjAssignmentEnterpriseNumber22 255853026
pjAssignmentEnterpriseNumber23 255853027
pjAssignmentEnterpriseNumber24 255853028
pjAssignmentEnterpriseNumber25 255853029
pjAssignmentEnterpriseNumber26 255853030
pjAssignmentEnterpriseNumber27 255853031
pjAssignmentEnterpriseNumber28 255853032
pjAssignmentEnterpriseNumber29 255853033
pjAssignmentEnterpriseNumber30 255853034
pjAssignmentEnterpriseNumber31 255853035
pjAssignmentEnterpriseNumber32 255853036
pjAssignmentEnterpriseNumber33 255853037
pjAssignmentEnterpriseNumber34 255853038
pjAssignmentEnterpriseNumber35 255853039
pjAssignmentEnterpriseNumber36 255853040
pjAssignmentEnterpriseNumber37 255853041
pjAssignmentEnterpriseNumber38 255853042
pjAssignmentEnterpriseNumber39 255853043
pjAssignmentEnterpriseNumber40 255853044
pjAssignmentEnterpriseText1 255853045
pjAssignmentEnterpriseText2 255853046
pjAssignmentEnterpriseText3 255853047
pjAssignmentEnterpriseText4 255853048
pjAssignmentEnterpriseText5 255853049
pjAssignmentEnterpriseText6 255853050
pjAssignmentEnterpriseText7 255853051
pjAssignmentEnterpriseText8 255853052
pjAssignmentEnterpriseText9 255853053
pjAssignmentEnterpriseText10 255853054
pjAssignmentEnterpriseText11 255853055
pjAssignmentEnterpriseText12 255853056
pjAssignmentEnterpriseText13 255853057
pjAssignmentEnterpriseText14 255853058
pjAssignmentEnterpriseText15 255853059
pjAssignmentEnterpriseText16 255853060
pjAssignmentEnterpriseText17 255853061
pjAssignmentEnterpriseText18 255853062
pjAssignmentEnterpriseText19 255853063
pjAssignmentEnterpriseText20 255853064
pjAssignmentEnterpriseText21 255853065
pjAssignmentEnterpriseText22 255853066
pjAssignmentEnterpriseText23 255853067
pjAssignmentEnterpriseText24 255853068
pjAssignmentEnterpriseText25 255853069
pjAssignmentEnterpriseText26 255853070
pjAssignmentEnterpriseText27 255853071
pjAssignmentEnterpriseText28 255853072
pjAssignmentEnterpriseText29 255853073
pjAssignmentEnterpriseText30 255853074
pjAssignmentEnterpriseText31 255853075
pjAssignmentEnterpriseText32 255853076
pjAssignmentEnterpriseText33 255853077
pjAssignmentEnterpriseText34 255853078
pjAssignmentEnterpriseText35 255853079
pjAssignmentEnterpriseText36 255853080
pjAssignmentEnterpriseText37 255853081
pjAssignmentEnterpriseText38 255853082
pjAssignmentEnterpriseText39 255853083
pjAssignmentEnterpriseText40 255853084
pjAssignmentEnterpriseResourceOutlineCode1 255853089
pjAssignmentEnterpriseResourceOutlineCode2 255853090
pjAssignmentEnterpriseResourceOutlineCode3 255853091
pjAssignmentEnterpriseResourceOutlineCode4 255853092
pjAssignmentEnterpriseResourceOutlineCode5 255853093
pjAssignmentEnterpriseResourceOutlineCode6 255853094
pjAssignmentEnterpriseResourceOutlineCode7 255853095
pjAssignmentEnterpriseResourceOutlineCode8 255853096
pjAssignmentEnterpriseResourceOutlineCode9 255853097
pjAssignmentEnterpriseResourceOutlineCode10 255853098
pjAssignmentEnterpriseResourceOutlineCode11 255853099
pjAssignmentEnterpriseResourceOutlineCode12 255853100
pjAssignmentEnterpriseResourceOutlineCode13 255853101
pjAssignmentEnterpriseResourceOutlineCode14 255853102
pjAssignmentEnterpriseResourceOutlineCode15 255853103
pjAssignmentEnterpriseResourceOutlineCode16 255853104
pjAssignmentEnterpriseResourceOutlineCode17 255853105
pjAssignmentEnterpriseResourceOutlineCode18 255853106
pjAssignmentEnterpriseResourceOutlineCode19 255853107
pjAssignmentEnterpriseResourceOutlineCode20 255853108
pjAssignmentEnterpriseResourceOutlineCode21 255853109
pjAssignmentEnterpriseResourceOutlineCode22 255853110
pjAssignmentEnterpriseResourceOutlineCode23 255853111
pjAssignmentEnterpriseResourceOutlineCode24 255853112
pjAssignmentEnterpriseResourceOutlineCode25 255853113
pjAssignmentEnterpriseResourceOutlineCode26 255853114
pjAssignmentEnterpriseResourceOutlineCode27 255853115
pjAssignmentEnterpriseResourceOutlineCode28 255853116
pjAssignmentEnterpriseResourceOutlineCode29 255853117
pjAssignmentEnterpriseResourceRBS 255853118
pjAssignmentResourceRequestType 255853149
pjAssignmentEnterpriseTeamMember 255853151
pjAssignmentEnterpriseResourceMultiValue20 255853154
pjAssignmentEnterpriseResourceMultiValue21 255853156
pjAssignmentEnterpriseResourceMultiValue22 255853158
pjAssignmentEnterpriseResourceMultiValue23 255853160
pjAssignmentEnterpriseResourceMultiValue24 255853162
pjAssignmentEnterpriseResourceMultiValue25 255853164
pjAssignmentEnterpriseResourceMultiValue26 255853166
pjAssignmentEnterpriseResourceMultiValue27 255853168
pjAssignmentEnterpriseResourceMultiValue28 255853170
pjAssignmentEnterpriseResourceMultiValue29 255853172
pjAssignmentActualWorkProtected 255853174
pjAssignmentActualOvtWorkProtected 255853175
pjAssignmentCreated 255853178
pjAssignmentGuid 255853180
pjAssignmentTaskGuid 255853181
pjAssignmentResourceGuid 255853182
pjAssignmentSummary 255853190
pjAssignmentOwner 255853212
pjAssignmentBudgetWork 255853213
pjAssignmentBudgetCost 255853214
pjAssignmentBaselineBudgetWork 255853217
pjAssignmentBaselineBudgetCost 255853218
pjAssignmentBaseline1BudgetWork 255853221
pjAssignmentBaseline1BudgetCost 255853222
pjAssignmentBaseline2BudgetWork 255853225
pjAssignmentBaseline2BudgetCost 255853226
pjAssignmentBaseline3BudgetWork 255853229
pjAssignmentBaseline3BudgetCost 255853230
pjAssignmentBaseline4BudgetWork 255853233
pjAssignmentBaseline4BudgetCost 255853234
pjAssignmentBaseline5BudgetWork 255853237
pjAssignmentBaseline5BudgetCost 255853238
pjAssignmentBaseline6BudgetWork 255853241
pjAssignmentBaseline6BudgetCost 255853242
pjAssignmentBaseline7BudgetWork 255853245
pjAssignmentBaseline7BudgetCost 255853246
pjAssignmentBaseline8BudgetWork 255853249
pjAssignmentBaseline8BudgetCost 255853250
pjAssignmentBaseline9BudgetWork 255853253
pjAssignmentBaseline9BudgetCost 255853254
pjAssignmentBaseline10BudgetWork 255853257
pjAssignmentBaseline10BudgetCost 255853258

Applies to