ProjectDataSet.TaskRow.TASK_OUTLINE_NUM Property

The task outline number represents a task's position (such as 1, 1.1, or 1.2.1) in the hierarchical outline structure.

Namespace:  WebSvcStatusing
Assembly:  ProjectServerWebServices (in ProjectServerWebServices.dll)

Syntax

'Declaration
Public Property TASK_OUTLINE_NUM As String
    Get
    Set
'Usage
Dim instance As ProjectDataSet.TaskRow
Dim value As String

value = instance.TASK_OUTLINE_NUM

instance.TASK_OUTLINE_NUM = value
public string TASK_OUTLINE_NUM { get; set; }

Property Value

Type: System.String

Remarks

Read-only.The outline number is similar to a work breakdown structure (WBS) number, except that Project Server automatically sets the outline number. For example, the following table shows some fields of the TaskDataTable in a ProjectDataSet for four TaskRow items in a project named TaskTest. The task with TASK_ID=0 is the project summary task. Task t1 is a summary task for t1sub1 and t1sub2.

TASK_NAME

TASK_ID

TASK_OUTLINE_LEVEL

TASK_OUTLINE_NUM

TaskTest

0

0

0

t1

1

1

1

t1sub1

2

2

1.1

t1sub2

3

2

1.2

t2

4

1

2

See Also

Reference

ProjectDataSet.TaskRow Class

ProjectDataSet.TaskRow Members

WebSvcStatusing Namespace