ProjectDataSet.TaskRow.TASK_OUTLINE_NUM Property
The task outline number represents a task's position (such as 1, 1.1, or 1.2.1) in the hierarchical outline structure.
Namespace: WebSvcStatusing
Assembly: ProjectServerWebServices (in ProjectServerWebServices.dll)
Syntax
'Declaration
Public Property TASK_OUTLINE_NUM As String
Get
Set
'Usage
Dim instance As ProjectDataSet.TaskRow
Dim value As String
value = instance.TASK_OUTLINE_NUM
instance.TASK_OUTLINE_NUM = value
public string TASK_OUTLINE_NUM { get; set; }
Property Value
Type: System.String
Remarks
Read-only.The outline number is similar to a work breakdown structure (WBS) number, except that Project Server automatically sets the outline number. For example, the following table shows some fields of the TaskDataTable in a ProjectDataSet for four TaskRow items in a project named TaskTest. The task with TASK_ID=0 is the project summary task. Task t1 is a summary task for t1sub1 and t1sub2.
TASK_NAME |
TASK_ID |
TASK_OUTLINE_LEVEL |
TASK_OUTLINE_NUM |
---|---|---|---|
TaskTest |
0 |
0 |
0 |
t1 |
1 |
1 |
1 |
t1sub1 |
2 |
2 |
1.1 |
t1sub2 |
3 |
2 |
1.2 |
t2 |
4 |
1 |
2 |