WBSLevel Element

This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.

The right-most level of the task work breakdown structure.

<WBSLevel>
  StringValue
</WBSLevel>

Parent Elements

Task

Occurrences

Minimum: 0

Maximum: 1

Remarks

For example, if the task WBS is A.01.03, the WBSLevel is 03.

See Also

Reference

WBS Element

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element