Cost Element

This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.

For a Task, Cost is the total scheduled (or projected) cost for a task, based on costs already incurred for work performed by all resources assigned to the task, in addition to the costs planned for the remaining work for the assignment.

For a Resource, it is the total scheduled cost for a resource for all assigned tasks, based on costs already incurred for work performed by the resource on all assigned tasks in addition to the costs planned for all remaining work.

For an Assignment, it is the total projected cost of the assignment when the baseline was saved.

For a Baseline, it is the total scheduled (or projected) cost for an assignment based on costs already incurred for work performed by the resource on a task, in addition to the costs planned for the remaining work for the assignment.

<Cost>
  DecimalValue
</Cost>

Parent Elements

TaskResourceAssignmentBaseline

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element

Resource Elements and XML Structure

XML Schema for the Resources Element

Assignment Elements and XML Structure

XML Schema for the Assignments Element