VAC Element

This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.

The variance at completion between the baseline cost and the total cost for an assignment on a task.

<VAC>
  FloatValue
</VAC>

Parent Elements

Assignment

Occurrences

Minimum: 0

Maximum: 1