Application.BoxSet Method
Project Developer Reference |
Creates, selects, or moves a task on the Network Diagram.
Syntax
expression.BoxSet(Action, TaskID, XPosition, YPosition, ProjectName)
expression A variable that represents an Application object.
Parameters
Name | Required/Optional | Data Type | Description |
---|---|---|---|
Action | Optional | Long | The operation to perform on the specified task(s). The default value is pjBoxSelect. Can be one of the PjBoxSet constants. |
TaskID | Optional | Long | The identification number of the task. If Action is pjBoxCreate, TaskID is ignored. |
XPosition | Optional | Long | The horizontal position of the task, in pixels. Required if Action is pjBoxMoveAbsolute or pjBoxMoveRelative. If Action is pjBoxCreate or pjBoxMoveAbsolute, XPosition is the absolute horizontal position of the upper-left corner of the task. If Action is pjBoxMoveRelative, XPosition is the amount to move the task horizontally relative to the current position. If Action is pjBoxAddToSelection, pjBoxSelect, or pjBoxUnselect, XPosition is ignored |
YPosition | Optional | Long | The vertical position of the task, in pixels. Required if Action is pjBoxMoveAbsolute or pjBoxMoveRelative. If Action is pjBoxCreate or pjBoxMoveAbsolute, YPosition is the absolute vertical position of the upper-left corner of the task. If Action is pjBoxMoveRelative, YPosition is the amount to move the task vertically relative to the current position. If Action is pjBoxAddToSelection, pjBoxSelect, or pjBoxUnselect, YPosition is ignored. |
ProjectName | Optional | String | If the active project is a consolidated project, specifies the name of the project for the identification number specified by TaskID. If TaskID is not specified, ProjectName is ignored. The default value is the name of the active project. |
Return Value
Boolean
Remarks
If only one task box is selected, specifying pjBoxUnselect has no effect.
If automatic layout has been activated for the Network Diagram view, XPosition and YPosition have no effect.
Example
The following example adds the task with TaskID 2 to the selected tasks.
Visual Basic for Applications |
---|
|
See Also