Application.BaseCalendarReset Method
Project Developer Reference |
Resets a base calendar.
Syntax
expression.BaseCalendarReset(Name)
expression A variable that represents an Application object.
Parameters
Name | Required/Optional | Data Type | Description |
---|---|---|---|
Name | Required | String | String. The name of the base calendar to reset. |
Return Value
Boolean
Remarks
Base calendars have the following default characteristics:
- Monday through Friday are working days with two shifts (8 A.M. to 12 P.M. and 1 P.M. to 5 P.M.).
- Saturday and Sunday are nonworking days.
Example
The following example resets the Standard base calendar to the default settings.
Visual Basic for Applications |
---|
|