Application.BaseCalendarEditDays Method
Project Developer Reference |
Changes one or more days in a base calendar.
Syntax
expression.BaseCalendarEditDays(Name, StartDate, EndDate, WeekDay, Working, From1, To1, From2, To2, From3, To3, Default, From4, To4, From5, To5)
expression A variable that represents an Application object.
Parameters
Name | Required/Optional | Data Type | Description |
---|---|---|---|
Name | Required | String | String. The name of the base calendar to change. |
StartDate | Optional | Variant | The first date to change. If StartDate is specified without EndDate, that date is the only day affected. If WeekDay is specified, StartDate is ignored. |
EndDate | Optional | Variant | The last date to change. If EndDate is specified without StartDate, that date is the only day affected. If WeekDay is specified, EndDate is ignored. |
WeekDay | Optional | Long | The weekday to change. If StartDate or EndDate is specified, WeekDay is ignored. Can be one of the PjWeekday constants. |
Working | Optional | Boolean | True if the days are working days. |
From1 | Optional | Variant | The start time of the first shift. |
To1 | Optional | Variant | The end time of the first shift. |
From2 | Optional | Variant | The start time of the second shift. |
To2 | Optional | Variant | The end time of the second shift. |
From3 | Optional | Variant | The start time of the third shift. |
To3 | Optional | Variant | The end time of the third shift. |
Default | Optional | Boolean | Resets the dates specified by StartDate and EndDate, or by WeekDay, to the default values. If Working is specified, Default is ignored. |
From4 | Optional | Variant | The start time of the fourth shift. |
To4 | Optional | Variant | The end time of the fourth shift. |
From5 | Optional | Variant | The start time of the fifth shift. |
To5 | Optional | Variant | The end time of the fifth shift. |
Return Value
Boolean
Example
The following example makes Wednesday a nonworking day in the Standard calendar.
Visual Basic for Applications |
---|
|
The following example makes the days from 2/10/97 through 2/12/97 nonworking days in the Standard calendar.
Visual Basic for Applications |
---|
|