PjPERTField 枚举

定义

public enum class PjPERTField
[System.Runtime.InteropServices.Guid("9B54B7B0-922A-11CF-982C-00AA00322803")]
public enum PjPERTField
type PjPERTField = 
Public Enum PjPERTField
继承
PjPERTField
属性

字段

名称 说明
pjPERTTaskWork 188743680
pjPERTTaskBaselineWork 188743681
pjPERTTaskActualWork 188743682
pjPERTTaskWorkVariance 188743683
pjPERTTaskRemainingWork 188743684
pjPERTTaskCost 188743685
pjPERTTaskBaselineCost 188743686
pjPERTTaskActualCost 188743687
pjPERTTaskFixedCost 188743688
pjPERTTaskCostVariance 188743689
pjPERTTaskRemainingCost 188743690
pjPERTTaskBCWP 188743691
pjPERTTaskBCWS 188743692
pjPERTTaskSV 188743693
pjPERTTaskName 188743694
pjPERTTaskNotes 188743695
pjPERTTaskWBS 188743696
pjPERTTaskConstraintType 188743697
pjPERTTaskConstraintDate 188743698
pjPERTTaskCritical 188743699
pjPERTTaskLevelingDelay 188743700
pjPERTTaskFreeSlack 188743701
pjPERTTaskTotalSlack 188743702
pjPERTTaskID 188743703
pjPERTTaskMilestone 188743704
pjPERTTaskPriority 188743705
pjPERTTaskSubproject 188743706
pjPERTTaskBaselineDuration 188743707
pjPERTTaskActualDuration 188743708
pjPERTTaskDuration 188743709
pjPERTTaskDurationVariance 188743710
pjPERTTaskRemainingDuration 188743711
pjPERTTaskPercentComplete 188743712
pjPERTTaskPercentWorkComplete 188743713
pjPERTTaskStart 188743715
pjPERTTaskFinish 188743716
pjPERTTaskEarlyStart 188743717
pjPERTTaskEarlyFinish 188743718
pjPERTTaskLateStart 188743719
pjPERTTaskLateFinish 188743720
pjPERTTaskActualStart 188743721
pjPERTTaskActualFinish 188743722
pjPERTTaskBaselineStart 188743723
pjPERTTaskBaselineFinish 188743724
pjPERTTaskStartVariance 188743725
pjPERTTaskFinishVariance 188743726
pjPERTTaskPredecessors 188743727
pjPERTTaskSuccessors 188743728
pjPERTTaskResourceNames 188743729
pjPERTTaskResourceInitials 188743730
pjPERTTaskText1 188743731
pjPERTTaskStart1 188743732
pjPERTTaskFinish1 188743733
pjPERTTaskText2 188743734
pjPERTTaskStart2 188743735
pjPERTTaskFinish2 188743736
pjPERTTaskText3 188743737
pjPERTTaskStart3 188743738
pjPERTTaskFinish3 188743739
pjPERTTaskText4 188743740
pjPERTTaskStart4 188743741
pjPERTTaskFinish4 188743742
pjPERTTaskText5 188743743
pjPERTTaskStart5 188743744
pjPERTTaskFinish5 188743745
pjPERTTaskText6 188743746
pjPERTTaskText7 188743747
pjPERTTaskText8 188743748
pjPERTTaskText9 188743749
pjPERTTaskText10 188743750
pjPERTTaskMarked 188743751
pjPERTTaskFlag1 188743752
pjPERTTaskFlag2 188743753
pjPERTTaskFlag3 188743754
pjPERTTaskFlag4 188743755
pjPERTTaskFlag5 188743756
pjPERTTaskFlag6 188743757
pjPERTTaskFlag7 188743758
pjPERTTaskFlag8 188743759
pjPERTTaskFlag9 188743760
pjPERTTaskFlag10 188743761
pjPERTTaskRollup 188743762
pjPERTTaskCV 188743763
pjPERTTaskProject 188743764
pjPERTTaskOutlineLevel 188743765
pjPERTTaskUniqueID 188743766
pjPERTTaskNumber1 188743767
pjPERTTaskNumber2 188743768
pjPERTTaskNumber3 188743769
pjPERTTaskNumber4 188743770
pjPERTTaskNumber5 188743771
pjPERTTaskSummary 188743772
pjPERTTaskCreated 188743773
pjPERTTaskSheetNotes 188743774
pjPERTTaskUniquePredecessors 188743775
pjPERTTaskUniqueSuccessors 188743776
pjPERTTaskObjects 188743777
pjPERTTaskLinkedFields 188743778
pjPERTTaskResume 188743779
pjPERTTaskStop 188743780
pjPERTTaskOutlineNumber 188743782
pjPERTTaskDuration1 188743783
pjPERTTaskDuration2 188743784
pjPERTTaskDuration3 188743785
pjPERTTaskCost1 188743786
pjPERTTaskCost2 188743787
pjPERTTaskCost3 188743788
pjPERTTaskHideBar 188743789
pjPERTTaskConfirmed 188743790
pjPERTTaskUpdateNeeded 188743791
pjPERTTaskContact 188743792
pjPERTTaskResourceGroup 188743793
pjPERTTaskACWP 188743800
pjPERTTaskType 188743808
pjPERTTaskRecurring 188743809
pjPERTTaskEffortDriven 188743812
pjPERTTaskOvertimeWork 188743843
pjPERTTaskActualOvertimeWork 188743844
pjPERTTaskRemainingOvertimeWork 188743845
pjPERTTaskRegularWork 188743846
pjPERTTaskOvertimeCost 188743848
pjPERTTaskActualOvertimeCost 188743849
pjPERTTaskRemainingOvertimeCost 188743850
pjPERTTaskFixedCostAccrual 188743880
188743897
pjPERTTaskHyperlinkAddress 188743898
pjPERTTaskHyperlinkSubAddress 188743899
pjPERTTaskHyperlinkHref 188743900
pjPERTTaskIsAssn 188743904
pjPERTTaskOverallocated 188743905
pjPERTTaskExternalTask 188743912
pjPERTTaskSubprojectReadOnly 188743926
pjPERTTaskResponsePending 188743930
pjPERTTaskTeamStatusPending 188743931
pjPERTTaskLevelingCanSplit 188743932
pjPERTTaskLevelAssignments 188743933
pjPERTTaskWorkContour 188743936
pjPERTTaskCost4 188743938
pjPERTTaskCost5 188743939
pjPERTTaskCost6 188743940
pjPERTTaskCost7 188743941
pjPERTTaskCost8 188743942
pjPERTTaskCost9 188743943
pjPERTTaskCost10 188743944
pjPERTTaskDate1 188743945
pjPERTTaskDate2 188743946
pjPERTTaskDate3 188743947
pjPERTTaskDate4 188743948
pjPERTTaskDate5 188743949
pjPERTTaskDate6 188743950
pjPERTTaskDate7 188743951
pjPERTTaskDate8 188743952
pjPERTTaskDate9 188743953
pjPERTTaskDate10 188743954
pjPERTTaskDuration4 188743955
pjPERTTaskDuration5 188743956
pjPERTTaskDuration6 188743957
pjPERTTaskDuration7 188743958
pjPERTTaskDuration8 188743959
pjPERTTaskDuration9 188743960
pjPERTTaskDuration10 188743961
pjPERTTaskStart6 188743962
pjPERTTaskFinish6 188743963
pjPERTTaskStart7 188743964
pjPERTTaskFinish7 188743965
pjPERTTaskStart8 188743966
pjPERTTaskFinish8 188743967
pjPERTTaskStart9 188743968
pjPERTTaskFinish9 188743969
pjPERTTaskStart10 188743970
pjPERTTaskFinish10 188743971
pjPERTTaskFlag11 188743972
pjPERTTaskFlag12 188743973
pjPERTTaskFlag13 188743974
pjPERTTaskFlag14 188743975
pjPERTTaskFlag15 188743976
pjPERTTaskFlag16 188743977
pjPERTTaskFlag17 188743978
pjPERTTaskFlag18 188743979
pjPERTTaskFlag19 188743980
pjPERTTaskFlag20 188743981
pjPERTTaskNumber6 188743982
pjPERTTaskNumber7 188743983
pjPERTTaskNumber8 188743984
pjPERTTaskNumber9 188743985
pjPERTTaskNumber10 188743986
pjPERTTaskNumber11 188743987
pjPERTTaskNumber12 188743988
pjPERTTaskNumber13 188743989
pjPERTTaskNumber14 188743990
pjPERTTaskNumber15 188743991
pjPERTTaskNumber16 188743992
pjPERTTaskNumber17 188743993
pjPERTTaskNumber18 188743994
pjPERTTaskNumber19 188743995
pjPERTTaskNumber20 188743996
pjPERTTaskText11 188743997
pjPERTTaskText12 188743998
pjPERTTaskText13 188743999
pjPERTTaskText14 188744000
pjPERTTaskText15 188744001
pjPERTTaskText16 188744002
pjPERTTaskText17 188744003
pjPERTTaskText18 188744004
pjPERTTaskText19 188744005
pjPERTTaskText20 188744006
pjPERTTaskText21 188744007
pjPERTTaskText22 188744008
pjPERTTaskText23 188744009
pjPERTTaskText24 188744010
pjPERTTaskText25 188744011
pjPERTTaskText26 188744012
pjPERTTaskText27 188744013
pjPERTTaskText28 188744014
pjPERTTaskText29 188744015
pjPERTTaskText30 188744016
pjPERTTaskResourcePhonetics 188744029
pjPERTTaskAssignmentDelay 188744046
pjPERTTaskAssignmentUnits 188744047
pjPERTTaskCostRateTable 188744048
pjPERTTaskPreLeveledStart 188744049
pjPERTTaskPreLeveledFinish 188744050
pjPERTTaskEstimated 188744076
pjPERTTaskIgnoreResourceCalendar 188744079
pjPERTTaskCalendar 188744082
pjPERTTaskOutlineCode1 188744096
pjPERTTaskOutlineCode2 188744098
pjPERTTaskOutlineCode3 188744100
pjPERTTaskOutlineCode4 188744102
pjPERTTaskOutlineCode5 188744104
pjPERTTaskOutlineCode6 188744106
pjPERTTaskOutlineCode7 188744108
pjPERTTaskOutlineCode8 188744110
pjPERTTaskOutlineCode9 188744112
pjPERTTaskOutlineCode10 188744114
pjPERTTaskDeadline 188744117
pjPERTTaskStartSlack 188744118
pjPERTTaskFinishSlack 188744119
pjPERTTaskVAC 188744121
pjPERTTaskGroupBySummary 188744126
pjPERTTaskWBSPredecessors 188744129
pjPERTTaskWBSSuccessors 188744130
pjPERTTaskResourceType 188744131
pjPERTTaskBaselineFixedCost 188744160
pjPERTTaskBaseline1Start 188744162
pjPERTTaskBaseline1Finish 188744163
pjPERTTaskBaseline1Cost 188744164
pjPERTTaskBaseline1Work 188744165
pjPERTTaskBaseline1Duration 188744167
pjPERTTaskBaseline1FixedCost 188744169
pjPERTTaskBaseline2Start 188744173
pjPERTTaskBaseline2Finish 188744174
pjPERTTaskBaseline2Cost 188744175
pjPERTTaskBaseline2Work 188744176
pjPERTTaskBaseline2Duration 188744178
pjPERTTaskBaseline2FixedCost 188744180
pjPERTTaskBaseline3Start 188744184
pjPERTTaskBaseline3Finish 188744185
pjPERTTaskBaseline3Cost 188744186
pjPERTTaskBaseline3Work 188744187
pjPERTTaskBaseline3Duration 188744189
pjPERTTaskBaseline3FixedCost 188744191
pjPERTTaskBaseline4Start 188744195
pjPERTTaskBaseline4Finish 188744196
pjPERTTaskBaseline4Cost 188744197
pjPERTTaskBaseline4Work 188744198
pjPERTTaskBaseline4Duration 188744200
pjPERTTaskBaseline4FixedCost 188744202
pjPERTTaskBaseline5Start 188744206
pjPERTTaskBaseline5Finish 188744207
pjPERTTaskBaseline5Cost 188744208
pjPERTTaskBaseline5Work 188744209
pjPERTTaskBaseline5Duration 188744211
pjPERTTaskBaseline5FixedCost 188744213
pjPERTTaskCPI 188744217
pjPERTTaskSPI 188744218
pjPERTTaskCVPercent 188744219
pjPERTTaskSVPercent 188744220
pjPERTTaskEAC 188744221
pjPERTTaskTCPI 188744222
pjPERTTaskStatus 188744223
pjPERTTaskBaseline6Start 188744224
pjPERTTaskBaseline6Finish 188744225
pjPERTTaskBaseline6Cost 188744226
pjPERTTaskBaseline6Work 188744227
pjPERTTaskBaseline6Duration 188744229
pjPERTTaskBaseline6FixedCost 188744231
pjPERTTaskBaseline7Start 188744235
pjPERTTaskBaseline7Finish 188744236
pjPERTTaskBaseline7Cost 188744237
pjPERTTaskBaseline7Work 188744238
pjPERTTaskBaseline7Duration 188744240
pjPERTTaskBaseline7FixedCost 188744242
pjPERTTaskBaseline8Start 188744246
pjPERTTaskBaseline8Finish 188744247
pjPERTTaskBaseline8Cost 188744248
pjPERTTaskBaseline8Work 188744249
pjPERTTaskBaseline8Duration 188744251
pjPERTTaskBaseline8FixedCost 188744253
pjPERTTaskBaseline9Start 188744257
pjPERTTaskBaseline9Finish 188744258
pjPERTTaskBaseline9Cost 188744259
pjPERTTaskBaseline9Work 188744260
pjPERTTaskBaseline9Duration 188744262
pjPERTTaskBaseline9FixedCost 188744264
pjPERTTaskBaseline10Start 188744268
pjPERTTaskBaseline10Finish 188744269
pjPERTTaskBaseline10Cost 188744270
pjPERTTaskBaseline10Work 188744271
pjPERTTaskBaseline10Duration 188744273
pjPERTTaskBaseline10FixedCost 188744275
pjPERTTaskEnterpriseCost1 188744279
pjPERTTaskEnterpriseCost2 188744280
pjPERTTaskEnterpriseCost3 188744281
pjPERTTaskEnterpriseCost4 188744282
pjPERTTaskEnterpriseCost5 188744283
pjPERTTaskEnterpriseCost6 188744284
pjPERTTaskEnterpriseCost7 188744285
pjPERTTaskEnterpriseCost8 188744286
pjPERTTaskEnterpriseCost9 188744287
pjPERTTaskEnterpriseCost10 188744288
pjPERTTaskEnterpriseDate1 188744289
pjPERTTaskEnterpriseDate2 188744290
pjPERTTaskEnterpriseDate3 188744291
pjPERTTaskEnterpriseDate4 188744292
pjPERTTaskEnterpriseDate5 188744293
pjPERTTaskEnterpriseDate6 188744294
pjPERTTaskEnterpriseDate7 188744295
pjPERTTaskEnterpriseDate8 188744296
pjPERTTaskEnterpriseDate9 188744297
pjPERTTaskEnterpriseDate10 188744298
pjPERTTaskEnterpriseDate11 188744299
pjPERTTaskEnterpriseDate12 188744300
pjPERTTaskEnterpriseDate13 188744301
pjPERTTaskEnterpriseDate14 188744302
pjPERTTaskEnterpriseDate15 188744303
pjPERTTaskEnterpriseDate16 188744304
pjPERTTaskEnterpriseDate17 188744305
pjPERTTaskEnterpriseDate18 188744306
pjPERTTaskEnterpriseDate19 188744307
pjPERTTaskEnterpriseDate20 188744308
pjPERTTaskEnterpriseDate21 188744309
pjPERTTaskEnterpriseDate22 188744310
pjPERTTaskEnterpriseDate23 188744311
pjPERTTaskEnterpriseDate24 188744312
pjPERTTaskEnterpriseDate25 188744313
pjPERTTaskEnterpriseDate26 188744314
pjPERTTaskEnterpriseDate27 188744315
pjPERTTaskEnterpriseDate28 188744316
pjPERTTaskEnterpriseDate29 188744317
pjPERTTaskEnterpriseDate30 188744318
pjPERTTaskEnterpriseDuration1 188744319
pjPERTTaskEnterpriseDuration2 188744320
pjPERTTaskEnterpriseDuration3 188744321
pjPERTTaskEnterpriseDuration4 188744322
pjPERTTaskEnterpriseDuration5 188744323
pjPERTTaskEnterpriseDuration6 188744324
pjPERTTaskEnterpriseDuration7 188744325
pjPERTTaskEnterpriseDuration8 188744326
pjPERTTaskEnterpriseDuration9 188744327
pjPERTTaskEnterpriseDuration10 188744328
pjPERTTaskEnterpriseFlag1 188744339
pjPERTTaskEnterpriseFlag2 188744340
pjPERTTaskEnterpriseFlag3 188744341
pjPERTTaskEnterpriseFlag4 188744342
pjPERTTaskEnterpriseFlag5 188744343
pjPERTTaskEnterpriseFlag6 188744344
pjPERTTaskEnterpriseFlag7 188744345
pjPERTTaskEnterpriseFlag8 188744346
pjPERTTaskEnterpriseFlag9 188744347
pjPERTTaskEnterpriseFlag10 188744348
pjPERTTaskEnterpriseFlag11 188744349
pjPERTTaskEnterpriseFlag12 188744350
pjPERTTaskEnterpriseFlag13 188744351
pjPERTTaskEnterpriseFlag14 188744352
pjPERTTaskEnterpriseFlag15 188744353
pjPERTTaskEnterpriseFlag16 188744354
pjPERTTaskEnterpriseFlag17 188744355
pjPERTTaskEnterpriseFlag18 188744356
pjPERTTaskEnterpriseFlag19 188744357
pjPERTTaskEnterpriseFlag20 188744358
pjPERTTaskEnterpriseNumber1 188744379
pjPERTTaskEnterpriseNumber2 188744380
pjPERTTaskEnterpriseNumber3 188744381
pjPERTTaskEnterpriseNumber4 188744382
pjPERTTaskEnterpriseNumber5 188744383
pjPERTTaskEnterpriseNumber6 188744384
pjPERTTaskEnterpriseNumber7 188744385
pjPERTTaskEnterpriseNumber8 188744386
pjPERTTaskEnterpriseNumber9 188744387
pjPERTTaskEnterpriseNumber10 188744388
pjPERTTaskEnterpriseNumber11 188744389
pjPERTTaskEnterpriseNumber12 188744390
pjPERTTaskEnterpriseNumber13 188744391
pjPERTTaskEnterpriseNumber14 188744392
pjPERTTaskEnterpriseNumber15 188744393
pjPERTTaskEnterpriseNumber16 188744394
pjPERTTaskEnterpriseNumber17 188744395
pjPERTTaskEnterpriseNumber18 188744396
pjPERTTaskEnterpriseNumber19 188744397
pjPERTTaskEnterpriseNumber20 188744398
pjPERTTaskEnterpriseNumber21 188744399
pjPERTTaskEnterpriseNumber22 188744400
pjPERTTaskEnterpriseNumber23 188744401
pjPERTTaskEnterpriseNumber24 188744402
pjPERTTaskEnterpriseNumber25 188744403
pjPERTTaskEnterpriseNumber26 188744404
pjPERTTaskEnterpriseNumber27 188744405
pjPERTTaskEnterpriseNumber28 188744406
pjPERTTaskEnterpriseNumber29 188744407
pjPERTTaskEnterpriseNumber30 188744408
pjPERTTaskEnterpriseNumber31 188744409
pjPERTTaskEnterpriseNumber32 188744410
pjPERTTaskEnterpriseNumber33 188744411
pjPERTTaskEnterpriseNumber34 188744412
pjPERTTaskEnterpriseNumber35 188744413
pjPERTTaskEnterpriseNumber36 188744414
pjPERTTaskEnterpriseNumber37 188744415
pjPERTTaskEnterpriseNumber38 188744416
pjPERTTaskEnterpriseNumber39 188744417
pjPERTTaskEnterpriseNumber40 188744418
pjPERTTaskEnterpriseOutlineCode1 188744419
pjPERTTaskEnterpriseOutlineCode2 188744421
pjPERTTaskEnterpriseOutlineCode3 188744423
pjPERTTaskEnterpriseOutlineCode4 188744425
pjPERTTaskEnterpriseOutlineCode5 188744427
pjPERTTaskEnterpriseOutlineCode6 188744429
pjPERTTaskEnterpriseOutlineCode7 188744431
pjPERTTaskEnterpriseOutlineCode8 188744433
pjPERTTaskEnterpriseOutlineCode9 188744435
pjPERTTaskEnterpriseOutlineCode10 188744437
pjPERTTaskEnterpriseOutlineCode11 188744439
pjPERTTaskEnterpriseOutlineCode12 188744441
pjPERTTaskEnterpriseOutlineCode13 188744443
pjPERTTaskEnterpriseOutlineCode14 188744445
pjPERTTaskEnterpriseOutlineCode15 188744447
pjPERTTaskEnterpriseOutlineCode16 188744449
pjPERTTaskEnterpriseOutlineCode17 188744451
pjPERTTaskEnterpriseOutlineCode18 188744453
pjPERTTaskEnterpriseOutlineCode19 188744455
pjPERTTaskEnterpriseOutlineCode20 188744457
pjPERTTaskEnterpriseOutlineCode21 188744459
pjPERTTaskEnterpriseOutlineCode22 188744461
pjPERTTaskEnterpriseOutlineCode23 188744463
pjPERTTaskEnterpriseOutlineCode24 188744465
pjPERTTaskEnterpriseOutlineCode25 188744467
pjPERTTaskEnterpriseOutlineCode26 188744469
pjPERTTaskEnterpriseOutlineCode27 188744471
pjPERTTaskEnterpriseOutlineCode28 188744473
pjPERTTaskEnterpriseOutlineCode29 188744475
pjPERTTaskEnterpriseOutlineCode30 188744477
pjPERTTaskEnterpriseText1 188744479
pjPERTTaskEnterpriseText2 188744480
pjPERTTaskEnterpriseText3 188744481
pjPERTTaskEnterpriseText4 188744482
pjPERTTaskEnterpriseText5 188744483
pjPERTTaskEnterpriseText6 188744484
pjPERTTaskEnterpriseText7 188744485
pjPERTTaskEnterpriseText8 188744486
pjPERTTaskEnterpriseText9 188744487
pjPERTTaskEnterpriseText10 188744488
pjPERTTaskEnterpriseText11 188744489
pjPERTTaskEnterpriseText12 188744490
pjPERTTaskEnterpriseText13 188744491
pjPERTTaskEnterpriseText14 188744492
pjPERTTaskEnterpriseText15 188744493
pjPERTTaskEnterpriseText16 188744494
pjPERTTaskEnterpriseText17 188744495
pjPERTTaskEnterpriseText18 188744496
pjPERTTaskEnterpriseText19 188744497
pjPERTTaskEnterpriseText20 188744498
pjPERTTaskEnterpriseText21 188744499
pjPERTTaskEnterpriseText22 188744500
pjPERTTaskEnterpriseText23 188744501
pjPERTTaskEnterpriseText24 188744502
pjPERTTaskEnterpriseText25 188744503
pjPERTTaskEnterpriseText26 188744504
pjPERTTaskEnterpriseText27 188744505
pjPERTTaskEnterpriseText28 188744506
pjPERTTaskEnterpriseText29 188744507
pjPERTTaskEnterpriseText30 188744508
pjPERTTaskEnterpriseText31 188744509
pjPERTTaskEnterpriseText32 188744510
pjPERTTaskEnterpriseText33 188744511
pjPERTTaskEnterpriseText34 188744512
pjPERTTaskEnterpriseText35 188744513
pjPERTTaskEnterpriseText36 188744514
pjPERTTaskEnterpriseText37 188744515
pjPERTTaskEnterpriseText38 188744516
pjPERTTaskEnterpriseText39 188744517
pjPERTTaskEnterpriseText40 188744518
pjPERTTaskEnterpriseProjectCost1 188744529
pjPERTTaskEnterpriseProjectCost2 188744530
pjPERTTaskEnterpriseProjectCost3 188744531
pjPERTTaskEnterpriseProjectCost4 188744532
pjPERTTaskEnterpriseProjectCost5 188744533
pjPERTTaskEnterpriseProjectCost6 188744534
pjPERTTaskEnterpriseProjectCost7 188744535
pjPERTTaskEnterpriseProjectCost8 188744536
pjPERTTaskEnterpriseProjectCost9 188744537
pjPERTTaskEnterpriseProjectCost10 188744538
pjPERTTaskEnterpriseProjectDate1 188744539
pjPERTTaskEnterpriseProjectDate2 188744540
pjPERTTaskEnterpriseProjectDate3 188744541
pjPERTTaskEnterpriseProjectDate4 188744542
pjPERTTaskEnterpriseProjectDate5 188744543
pjPERTTaskEnterpriseProjectDate6 188744544
pjPERTTaskEnterpriseProjectDate7 188744545
pjPERTTaskEnterpriseProjectDate8 188744546
pjPERTTaskEnterpriseProjectDate9 188744547
pjPERTTaskEnterpriseProjectDate10 188744548
pjPERTTaskEnterpriseProjectDate11 188744549
pjPERTTaskEnterpriseProjectDate12 188744550
pjPERTTaskEnterpriseProjectDate13 188744551
pjPERTTaskEnterpriseProjectDate14 188744552
pjPERTTaskEnterpriseProjectDate15 188744553
pjPERTTaskEnterpriseProjectDate16 188744554
pjPERTTaskEnterpriseProjectDate17 188744555
pjPERTTaskEnterpriseProjectDate18 188744556
pjPERTTaskEnterpriseProjectDate19 188744557
pjPERTTaskEnterpriseProjectDate20 188744558
pjPERTTaskEnterpriseProjectDate21 188744559
pjPERTTaskEnterpriseProjectDate22 188744560
pjPERTTaskEnterpriseProjectDate23 188744561
pjPERTTaskEnterpriseProjectDate24 188744562
pjPERTTaskEnterpriseProjectDate25 188744563
pjPERTTaskEnterpriseProjectDate26 188744564
pjPERTTaskEnterpriseProjectDate27 188744565
pjPERTTaskEnterpriseProjectDate28 188744566
pjPERTTaskEnterpriseProjectDate29 188744567
pjPERTTaskEnterpriseProjectDate30 188744568
pjPERTTaskEnterpriseProjectDuration1 188744569
pjPERTTaskEnterpriseProjectDuration2 188744570
pjPERTTaskEnterpriseProjectDuration3 188744571
pjPERTTaskEnterpriseProjectDuration4 188744572
pjPERTTaskEnterpriseProjectDuration5 188744573
pjPERTTaskEnterpriseProjectDuration6 188744574
pjPERTTaskEnterpriseProjectDuration7 188744575
pjPERTTaskEnterpriseProjectDuration8 188744576
pjPERTTaskEnterpriseProjectDuration9 188744577
pjPERTTaskEnterpriseProjectDuration10 188744578
pjPERTTaskEnterpriseProjectOutlineCode1 188744589
pjPERTTaskEnterpriseProjectOutlineCode2 188744590
pjPERTTaskEnterpriseProjectOutlineCode3 188744591
pjPERTTaskEnterpriseProjectOutlineCode4 188744592
pjPERTTaskEnterpriseProjectOutlineCode5 188744593
pjPERTTaskEnterpriseProjectOutlineCode6 188744594
pjPERTTaskEnterpriseProjectOutlineCode7 188744595
pjPERTTaskEnterpriseProjectOutlineCode8 188744596
pjPERTTaskEnterpriseProjectOutlineCode9 188744597
pjPERTTaskEnterpriseProjectOutlineCode10 188744598
pjPERTTaskEnterpriseProjectOutlineCode11 188744599
pjPERTTaskEnterpriseProjectOutlineCode12 188744600
pjPERTTaskEnterpriseProjectOutlineCode13 188744601
pjPERTTaskEnterpriseProjectOutlineCode14 188744602
pjPERTTaskEnterpriseProjectOutlineCode15 188744603
pjPERTTaskEnterpriseProjectOutlineCode16 188744604
pjPERTTaskEnterpriseProjectOutlineCode17 188744605
pjPERTTaskEnterpriseProjectOutlineCode18 188744606
pjPERTTaskEnterpriseProjectOutlineCode19 188744607
pjPERTTaskEnterpriseProjectOutlineCode20 188744608
pjPERTTaskEnterpriseProjectOutlineCode21 188744609
pjPERTTaskEnterpriseProjectOutlineCode22 188744610
pjPERTTaskEnterpriseProjectOutlineCode23 188744611
pjPERTTaskEnterpriseProjectOutlineCode24 188744612
pjPERTTaskEnterpriseProjectOutlineCode25 188744613
pjPERTTaskEnterpriseProjectOutlineCode26 188744614
pjPERTTaskEnterpriseProjectOutlineCode27 188744615
pjPERTTaskEnterpriseProjectOutlineCode28 188744616
pjPERTTaskEnterpriseProjectOutlineCode29 188744617
pjPERTTaskEnterpriseProjectOutlineCode30 188744618
pjPERTTaskEnterpriseProjectFlag1 188744649
pjPERTTaskEnterpriseProjectFlag2 188744650
pjPERTTaskEnterpriseProjectFlag3 188744651
pjPERTTaskEnterpriseProjectFlag4 188744652
pjPERTTaskEnterpriseProjectFlag5 188744653
pjPERTTaskEnterpriseProjectFlag6 188744654
pjPERTTaskEnterpriseProjectFlag7 188744655
pjPERTTaskEnterpriseProjectFlag8 188744656
pjPERTTaskEnterpriseProjectFlag9 188744657
pjPERTTaskEnterpriseProjectFlag10 188744658
pjPERTTaskEnterpriseProjectFlag11 188744659
pjPERTTaskEnterpriseProjectFlag12 188744660
pjPERTTaskEnterpriseProjectFlag13 188744661
pjPERTTaskEnterpriseProjectFlag14 188744662
pjPERTTaskEnterpriseProjectFlag15 188744663
pjPERTTaskEnterpriseProjectFlag16 188744664
pjPERTTaskEnterpriseProjectFlag17 188744665
pjPERTTaskEnterpriseProjectFlag18 188744666
pjPERTTaskEnterpriseProjectFlag19 188744667
pjPERTTaskEnterpriseProjectFlag20 188744668
pjPERTTaskEnterpriseProjectNumber1 188744689
pjPERTTaskEnterpriseProjectNumber2 188744690
pjPERTTaskEnterpriseProjectNumber3 188744691
pjPERTTaskEnterpriseProjectNumber4 188744692
pjPERTTaskEnterpriseProjectNumber5 188744693
pjPERTTaskEnterpriseProjectNumber6 188744694
pjPERTTaskEnterpriseProjectNumber7 188744695
pjPERTTaskEnterpriseProjectNumber8 188744696
pjPERTTaskEnterpriseProjectNumber9 188744697
pjPERTTaskEnterpriseProjectNumber10 188744698
pjPERTTaskEnterpriseProjectNumber11 188744699
pjPERTTaskEnterpriseProjectNumber12 188744700
pjPERTTaskEnterpriseProjectNumber13 188744701
pjPERTTaskEnterpriseProjectNumber14 188744702
pjPERTTaskEnterpriseProjectNumber15 188744703
pjPERTTaskEnterpriseProjectNumber16 188744704
pjPERTTaskEnterpriseProjectNumber17 188744705
pjPERTTaskEnterpriseProjectNumber18 188744706
pjPERTTaskEnterpriseProjectNumber19 188744707
pjPERTTaskEnterpriseProjectNumber20 188744708
pjPERTTaskEnterpriseProjectNumber21 188744709
pjPERTTaskEnterpriseProjectNumber22 188744710
pjPERTTaskEnterpriseProjectNumber23 188744711
pjPERTTaskEnterpriseProjectNumber24 188744712
pjPERTTaskEnterpriseProjectNumber25 188744713
pjPERTTaskEnterpriseProjectNumber26 188744714
pjPERTTaskEnterpriseProjectNumber27 188744715
pjPERTTaskEnterpriseProjectNumber28 188744716
pjPERTTaskEnterpriseProjectNumber29 188744717
pjPERTTaskEnterpriseProjectNumber30 188744718
pjPERTTaskEnterpriseProjectNumber31 188744719
pjPERTTaskEnterpriseProjectNumber32 188744720
pjPERTTaskEnterpriseProjectNumber33 188744721
pjPERTTaskEnterpriseProjectNumber34 188744722
pjPERTTaskEnterpriseProjectNumber35 188744723
pjPERTTaskEnterpriseProjectNumber36 188744724
pjPERTTaskEnterpriseProjectNumber37 188744725
pjPERTTaskEnterpriseProjectNumber38 188744726
pjPERTTaskEnterpriseProjectNumber39 188744727
pjPERTTaskEnterpriseProjectNumber40 188744728
pjPERTTaskEnterpriseProjectText1 188744729
pjPERTTaskEnterpriseProjectText2 188744730
pjPERTTaskEnterpriseProjectText3 188744731
pjPERTTaskEnterpriseProjectText4 188744732
pjPERTTaskEnterpriseProjectText5 188744733
pjPERTTaskEnterpriseProjectText6 188744734
pjPERTTaskEnterpriseProjectText7 188744735
pjPERTTaskEnterpriseProjectText8 188744736
pjPERTTaskEnterpriseProjectText9 188744737
pjPERTTaskEnterpriseProjectText10 188744738
pjPERTTaskEnterpriseProjectText11 188744739
pjPERTTaskEnterpriseProjectText12 188744740
pjPERTTaskEnterpriseProjectText13 188744741
pjPERTTaskEnterpriseProjectText14 188744742
pjPERTTaskEnterpriseProjectText15 188744743
pjPERTTaskEnterpriseProjectText16 188744744
pjPERTTaskEnterpriseProjectText17 188744745
pjPERTTaskEnterpriseProjectText18 188744746
pjPERTTaskEnterpriseProjectText19 188744747
pjPERTTaskEnterpriseProjectText20 188744748
pjPERTTaskEnterpriseProjectText21 188744749
pjPERTTaskEnterpriseProjectText22 188744750
pjPERTTaskEnterpriseProjectText23 188744751
pjPERTTaskEnterpriseProjectText24 188744752
pjPERTTaskEnterpriseProjectText25 188744753
pjPERTTaskEnterpriseProjectText26 188744754
pjPERTTaskEnterpriseProjectText27 188744755
pjPERTTaskEnterpriseProjectText28 188744756
pjPERTTaskEnterpriseProjectText29 188744757
pjPERTTaskEnterpriseProjectText30 188744758
pjPERTTaskEnterpriseProjectText31 188744759
pjPERTTaskEnterpriseProjectText32 188744760
pjPERTTaskEnterpriseProjectText33 188744761
pjPERTTaskEnterpriseProjectText34 188744762
pjPERTTaskEnterpriseProjectText35 188744763
pjPERTTaskEnterpriseProjectText36 188744764
pjPERTTaskEnterpriseProjectText37 188744765
pjPERTTaskEnterpriseProjectText38 188744766
pjPERTTaskEnterpriseProjectText39 188744767
pjPERTTaskEnterpriseProjectText40 188744768
pjPERTTaskResourceEnterpriseOutlineCode1 188744769
pjPERTTaskResourceEnterpriseOutlineCode2 188744770
pjPERTTaskResourceEnterpriseOutlineCode3 188744771
pjPERTTaskResourceEnterpriseOutlineCode4 188744772
pjPERTTaskResourceEnterpriseOutlineCode5 188744773
pjPERTTaskResourceEnterpriseOutlineCode6 188744774
pjPERTTaskResourceEnterpriseOutlineCode7 188744775
pjPERTTaskResourceEnterpriseOutlineCode8 188744776
pjPERTTaskResourceEnterpriseOutlineCode9 188744777
pjPERTTaskResourceEnterpriseOutlineCode10 188744778
pjPERTTaskResourceEnterpriseOutlineCode11 188744779
pjPERTTaskResourceEnterpriseOutlineCode12 188744780
pjPERTTaskResourceEnterpriseOutlineCode13 188744781
pjPERTTaskResourceEnterpriseOutlineCode14 188744782
pjPERTTaskResourceEnterpriseOutlineCode15 188744783
pjPERTTaskResourceEnterpriseOutlineCode16 188744784
pjPERTTaskResourceEnterpriseOutlineCode17 188744785
pjPERTTaskResourceEnterpriseOutlineCode18 188744786
pjPERTTaskResourceEnterpriseOutlineCode19 188744787
pjPERTTaskResourceEnterpriseOutlineCode20 188744788
pjPERTTaskResourceEnterpriseOutlineCode21 188744789
pjPERTTaskResourceEnterpriseOutlineCode22 188744790
pjPERTTaskResourceEnterpriseOutlineCode23 188744791
pjPERTTaskResourceEnterpriseOutlineCode24 188744792
pjPERTTaskResourceEnterpriseOutlineCode25 188744793
pjPERTTaskResourceEnterpriseOutlineCode26 188744794
pjPERTTaskResourceEnterpriseOutlineCode27 188744795
pjPERTTaskResourceEnterpriseOutlineCode28 188744796
pjPERTTaskResourceEnterpriseOutlineCode29 188744797
pjPERTTaskResourceEnterpriseOutlineCode30 188744798
pjPERTTaskPhysicalPercentComplete 188744799
pjPERTTaskDemandedRequested 188744800
pjPERTTaskEarnedValueMethod 188744802
pjPERTTasknull_prop 188744808
pjPERTTaskResourceEnterpriseMultiValue20 188744809
pjPERTTaskResourceEnterpriseMultiValue21 188744810
pjPERTTaskResourceEnterpriseMultiValue22 188744811
pjPERTTaskResourceEnterpriseMultiValue23 188744812
pjPERTTaskResourceEnterpriseMultiValue24 188744813
pjPERTTaskResourceEnterpriseMultiValue25 188744814
pjPERTTaskResourceEnterpriseMultiValue26 188744815
pjPERTTaskResourceEnterpriseMultiValue27 188744816
pjPERTTaskResourceEnterpriseMultiValue28 188744817
pjPERTTaskResourceEnterpriseMultiValue29 188744818
pjPERTTaskActualWorkProtected 188744819
pjPERTTaskActualOvertimeWorkProtected 188744820
pjPERTTaskGuid 188744823
pjPERTTaskCalendarGuid 188744824
pjPERTTaskDeliverableGuid 188744826
pjPERTTaskDeliverableType 188744827
pjPERTTaskDeliverableStart 188744832
pjPERTTaskDeliverableFinish 188744833
pjPERTTaskIsPublished 188744845
pjPERTTaskStatusManagerName 188744846
pjPERTTaskErrorMessage 188744847
pjPERTTaskAssignment_Owner 188744850
pjPERTTaskBudgetWork 188744851
pjPERTTaskBudgetCost 188744852
pjPERTTaskBaselineFixedCostAccrual 188744853
pjPERTTaskBaselineDeliverableStart 188744854
pjPERTTaskBaselineDeliverableFinish 188744855
pjPERTTaskBaselineBudgetWork 188744856
pjPERTTaskBaselineBudgetCost 188744857
pjPERTTaskBaseline1FixedCostAccrual 188744860
pjPERTTaskBaseline1DeliverableStart 188744861
pjPERTTaskBaseline1DeliverableFinish 188744862
pjPERTTaskBaseline1BudgetWork 188744863
pjPERTTaskBaseline1BudgetCost 188744864
pjPERTTaskBaseline2FixedCostAccrual 188744867
pjPERTTaskBaseline2DeliverableStart 188744868
pjPERTTaskBaseline2DeliverableFinish 188744869
pjPERTTaskBaseline2BudgetWork 188744870
pjPERTTaskBaseline2BudgetCost 188744871
pjPERTTaskBaseline3FixedCostAccrual 188744874
pjPERTTaskBaseline3DeliverableStart 188744875
pjPERTTaskBaseline3DeliverableFinish 188744876
pjPERTTaskBaseline3BudgetWork 188744877
pjPERTTaskBaseline3BudgetCost 188744878
pjPERTTaskBaseline4FixedCostAccrual 188744881
pjPERTTaskBaseline4DeliverableStart 188744882
pjPERTTaskBaseline4DeliverableFinish 188744883
pjPERTTaskBaseline4BudgetWork 188744884
pjPERTTaskBaseline4BudgetCost 188744885
pjPERTTaskBaseline5FixedCostAccrual 188744888
pjPERTTaskBaseline5DeliverableStart 188744889
pjPERTTaskBaseline5DeliverableFinish 188744890
pjPERTTaskBaseline5BudgetWork 188744891
pjPERTTaskBaseline5BudgetCost 188744892
pjPERTTaskBaseline6FixedCostAccrual 188744895
pjPERTTaskBaseline6DeliverableStart 188744896
pjPERTTaskBaseline6DeliverableFinish 188744897
pjPERTTaskBaseline6BudgetWork 188744898
pjPERTTaskBaseline6BudgetCost 188744899
pjPERTTaskBaseline7FixedCostAccrual 188744902
pjPERTTaskBaseline7DeliverableStart 188744903
pjPERTTaskBaseline7DeliverableFinish 188744904
pjPERTTaskBaseline7BudgetWork 188744905
pjPERTTaskBaseline7BudgetCost 188744906
pjPERTTaskBaseline8FixedCostAccrual 188744909
pjPERTTaskBaseline8DeliverableStart 188744910
pjPERTTaskBaseline8DeliverableFinish 188744911
pjPERTTaskBaseline8BudgetWork 188744912
pjPERTTaskBaseline8BudgetCost 188744913
pjPERTTaskBaseline9FixedCostAccrual 188744916
pjPERTTaskBaseline9DeliverableStart 188744917
pjPERTTaskBaseline9DeliverableFinish 188744918
pjPERTTaskBaseline9BudgetWork 188744919
pjPERTTaskBaseline9BudgetCost 188744920
pjPERTTaskBaseline10FixedCostAccrual 188744923
pjPERTTaskBaseline10DeliverableStart 188744924
pjPERTTaskBaseline10DeliverableFinish 188744925
pjPERTTaskBaseline10BudgetWork 188744926
pjPERTTaskBaseline10BudgetCost 188744927
pjPERTTaskDeliverableName 188744956
pjPERTTaskActive 188744959
pjPERTTaskManual 188744960
pjPERTTaskPlaceholder 188744961
pjPERTTaskWarning 188744962
pjPERTTaskStartText 188744965
pjPERTTaskFinishText 188744966
pjPERTTaskDurationText 188744967
pjPERTTaskBaselineStartText 188744979
pjPERTTaskBaselineFinishText 188744980
pjPERTTaskBaselineDurationText 188744981
pjPERTTaskBaseline1StartText 188744982
pjPERTTaskBaseline1FinishText 188744983
pjPERTTaskBaseline1DurationText 188744984
pjPERTTaskBaseline2StartText 188744985
pjPERTTaskBaseline2FinishText 188744986
pjPERTTaskBaseline2DurationText 188744987
pjPERTTaskBaseline3StartText 188744988
pjPERTTaskBaseline3FinishText 188744989
pjPERTTaskBaseline3DurationText 188744990
pjPERTTaskBaseline4StartText 188744991
pjPERTTaskBaseline4FinishText 188744992
pjPERTTaskBaseline4DurationText 188744993
pjPERTTaskBaseline5StartText 188744994
pjPERTTaskBaseline5FinishText 188744995
pjPERTTaskBaseline5DurationText 188744996
pjPERTTaskBaseline6StartText 188744997
pjPERTTaskBaseline6FinishText 188744998
pjPERTTaskBaseline6DurationText 188744999
pjPERTTaskBaseline7StartText 188745000
pjPERTTaskBaseline7FinishText 188745001
pjPERTTaskBaseline7DurationText 188745002
pjPERTTaskBaseline8StartText 188745003
pjPERTTaskBaseline8FinishText 188745004
pjPERTTaskBaseline8DurationText 188745005
pjPERTTaskBaseline9StartText 188745006
pjPERTTaskBaseline9FinishText 188745007
pjPERTTaskBaseline9DurationText 188745008
pjPERTTaskBaseline10StartText 188745009
pjPERTTaskBaseline10FinishText 188745010
pjPERTTaskBaseline10DurationText 188745011
pjPERTTaskIgnoreWarnings 188745012
pjPERTTaskAssignmentPeakUnits 188745015

适用于