OutlineCode.LinkedFieldID 属性

定义

public:
 property int LinkedFieldID { int get(); void set(int value); };
public int LinkedFieldID { get; set; }
member this.LinkedFieldID : int with get, set
Public Property LinkedFieldID As Integer

属性值

适用于