_MSProject.ValidateGraphicalIndicators(Int32, String, Boolean) 方法

定义

public string ValidateGraphicalIndicators (int propertyID, string strGraphicalIndicators, bool Localized = false);
abstract member ValidateGraphicalIndicators : int * string * bool -> string
Public Function ValidateGraphicalIndicators (propertyID As Integer, strGraphicalIndicators As String, Optional Localized As Boolean = false) As String

参数

propertyID
Int32
strGraphicalIndicators
String
Localized
Boolean

返回

适用于