_MSProject.TimeSeparator 属性

定义

public:
 property System::String ^ TimeSeparator { System::String ^ get(); void set(System::String ^ value); };
public string TimeSeparator { get; set; }
member this.TimeSeparator : string with get, set
Public Property TimeSeparator As String

属性值

适用于