_MSProject.ListSeparator 属性

定义

public:
 property System::String ^ ListSeparator { System::String ^ get(); void set(System::String ^ value); };
public string ListSeparator { get; set; }
member this.ListSeparator : string with get, set
Public Property ListSeparator As String

属性值

适用于