_MSProject.DateSeparator 属性

定义

public:
 property System::String ^ DateSeparator { System::String ^ get(); void set(System::String ^ value); };
public string DateSeparator { get; set; }
member this.DateSeparator : string with get, set
Public Property DateSeparator As String

属性值

适用于