_IProjectDoc.ServerPath 属性

定义

public:
 property System::String ^ ServerPath { System::String ^ get(); void set(System::String ^ value); };
public string ServerPath { get; set; }
member this.ServerPath : string with get, set
Public Property ServerPath As String

属性值

适用于