_EProjectApp2.JobCompleted(String, String, String, Int32, Int32) 方法
定义
重要
一些信息与预发行产品相关,相应产品在发行之前可能会进行重大修改。 对于此处提供的信息,Microsoft 不作任何明示或暗示的担保。
public:
void JobCompleted(System::String ^ bstrName, System::String ^ bstrprojGuid, System::String ^ bstrjobGuid, int jobType, int lResult);
public void JobCompleted (string bstrName, string bstrprojGuid, string bstrjobGuid, int jobType, int lResult);
abstract member JobCompleted : string * string * string * int * int -> unit
Public Sub JobCompleted (bstrName As String, bstrprojGuid As String, bstrjobGuid As String, jobType As Integer, lResult As Integer)
参数
- bstrName
- String
- bstrprojGuid
- String
- bstrjobGuid
- String
- jobType
- Int32
- lResult
- Int32