ProjectDataSet.TaskRow Members
Include Protected Members
Include Inherited Members
Defines the properties, methods, and events of one task in a TaskDataTable.
The ProjectDataSet.TaskRow type exposes the following members.
Properties
Name
Description
Adds a task after the specified task GUID.
Specifies the position in a project to add a task.
Date the task was created.
Deprecated. Use TASK_DUR_FMT to set the desired duration display format.
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
Item[DataColumn, DataRowVersion]
(Inherited from DataRow.)
(Inherited from DataRow.)
Date the task was last saved to the project.
Copy of the project name.
The number of digits displayed to the right of the decimal when currency values are displayed.
The placement of the currency symbol in relation to the currency value.
The symbol used to represent the type of currency used in the project.
The Project.ProjectType of the project to which the task belongs.
GUID of the project to which this task belongs.
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
Task actual cost is the total current actual cost incurred for this task.
Task actual duration is the span of actual working time for a task so far, based on the scheduled duration and current remaining work or percentage of work complete.
Task actual finish is the date and time that a task actually finished.
Task actual overtime cost is the costs incurred for overtime work already performed on a task by all assigned resources.
Task actual overtime work is the actual amount of overtime work already performed by all resources assigned to a task.
Task actual start is the date and time that a task actually began.
Task actual work is the amount of work that has already been done by the resources assigned to a task.
Actual cost of work performed is the costs incurred for work already done on a task, up to the project status date or today's date.
Budgeted cost of work performed is also known as earned value.
Budgeted cost for work scheduled is the cumulative timephased baseline costs up to the status date or today's date.
The total budget cost for the task.
The total budget work for the task.
GUID of a task-specific calendar.
The constrained start or finish date depending on the value of TASK_CONSTRAINT_TYPE.
A short integer of Task.ConstraintType indicating the type of scheduling constraint to use.
Name of person responsible for the task.
The current projected cost of the task.
Task cost variance is the difference between the baseline cost and total cost for a task.
Cost Performance Index CPI is the ratio of BCWP (budgeted cost of work performed) to ACWP (actual cost of work performed).
Task cost variance.
Date entered as the deadline for the task.
Duration of the task.
Task duration format indicates the desired display format of the duration value, and whether the duration is considered an estimate rather than a firm value.
Indicates whether the TASK_DUR_FMT is an estimate.
Duration variance is the difference between the planned duration and the current duration of the task.
Estimate at completion is the total scheduled or projected cost for a task based on costs already incurred, in addition to the costs planned for remaining work.
Earliest possible date on which the task can finish.
Earliest possible date the task can start.
Earned value method indicates the method to use when calculating earned value.
Unique ID of the external project represented by this task.
The date this task is scheduled to be completed.
The finish slack duration is the duration between the TASK_EARLY_FINISH and TASK_LATE_FINISH dates.
Task finish variance is the difference between task finish date and the baseline finish date.
Fixed cost of a task includes any non-resource task expense.
Fixed cost accrual indicator indicates how fixed costs are to be accrued in a task.
Task free slack duration is the amount of time that a task can be delayed without delaying any successor tasks.
True if task has OLE linked fields.
Task hyperlink address is the URI for the hyperlink associated with this task.
Display text for the hyperlink associated with this task.
Hyperlink anchor.
Task ID is an ordinal indicator of where the task is displayed in the list of tasks.
Ignores resource calendar indicates whether the resource calendar should be ignored when scheduling this task.
Task is critical returns true when no slack is associated with this task.
Task is effort driven indicates whether scheduling for a task is effort-driven.
Task is external indicates whether the task is from another project or whether it originated in the current project.
Indicates whether a task represents an inserted project that is marked as "Schedule-from-Finish" (SF).
Task is marked indicates whether the task is tagged as having special meaning to the user.
Indicates whether a task is a milestone.
Task is null is true if this task has no values set.
Indicates whether an assigned resource on a task has been assigned to more work on the task than can be done within the normal working capacity.
Task is read-only subproject is set to true if this task is a subproject and if it is set to read-only.
Task is recurring indicates whether a task is part of a series of recurring tasks.
Indicates whether a task is the parent of a series of repeating tasks.
Indicates whether information on the subtask Gantt bars is rolled up to the summary task bar.
Task is subproject indicates the task represents a subproject.
Indicates if a task is a summary task.
Contains the latest date that a task can finish without delaying the finish of the project.
Contains the latest date that a task can start without delaying the finish of the project.
Task leveling adjusts assignments indicates whether the leveling function can delay and split individual assignments (rather than the entire task) to resolve over-allocations.
Task leveling can split indicates whether the resource leveling function can cause splits on remaining work on this task.
Task leveling delay duration contains the amount of time that a task or assignment is to be delayed from its early start date as a result of resource leveling.
Task leveling delay format indicates the desired display format of the TASK_LEVELING_DELAY value, and whether the duration is considered only an estimate rather than a firm value.
Task lockdown by manager indicates whether a task has been locked out from changes by a manager.
Task name is the display title of the task.
Text value of user-entered notes for a task.
Task outline level is a number that indicates the level of a task (such as 1, 2, or 3) in the project outline hierarchy.
The task outline number represents a task's position (such as 1, 1.1, or 1.2.1) in the hierarchical outline structure.
Task overtime cost is the sum of TASK_ACT_OVT_COST and TASK_REM_OVT_COST.
Task overtime work is the total of all overtime work on a task.
Parent unique identifier is the unique ID of the parent summary task.
Task percent complete is percentage of elapsed duration compared with the remaining duration.
Task percent of work complete is the percentage of work actually elapsed compared with the amount of work remaining to be done.
Task physical percent of work complete can be used as an alternative for calculating the budgeted cost of work performed (TASK_BCWP).
Task pre-leveled finish date is the finish date of a task before resource leveling.
Task pre-leveled start date is the start date of a task before resource leveling.
Task priority is the level of importance given to a task, which indicates how readily a task or assignment can be delayed or split during resource leveling.
Task regular work is the total amount of non-overtime work scheduled to be performed by resources.
The cost remaining to complete the task.
Task remaining duration is the amount of time required to complete the unfinished portion of a task.
Task remaining overtime cost is the overtime cost remaining to complete this task.
Task remaining overtime work is the sum of all remaining overtime work values for all the resources assigned to the task.
Task remaining work contains the amount of time required to complete a task.
Task resume date is the date that the remaining portion of a task is scheduled to resume after you enter any progress.
Task schedule performance index is the ratio of the budgeted cost of work performed to the budgeted cost of work scheduled.
Starting date of the task.
Task Start Slack.
Task start variance is the difference between the baseline start date (TB_START ) and the actual start date (TASK_START_DATE).
Task stop date represents the end of the actual portion of a task.
Task earned value schedule variance is the cost difference between the current progress and the baseline plan of a task.
Task to complete performance index is the ratio of remaining available budget to remaining scheduled cost as of the status date.
Task total slack duration is the amount of time a task's finish date can be delayed without delaying the project's finish date.
Task type can be fixed units, fixed duration, or fixed work.
Unique identifier (GUID) of a task.
Task variance at completion is the difference between the TB_COST (Budget At Completion) or baseline cost and TASK_EAC (Estimate At Completion).
Task work breakdown structure code is a read-only alphanumeric code that can indicate the relationships between tasks.
Task work is the total amount of time scheduled on a task for all assigned resources.
Task work variance is the difference between baseline work of a task and the currently scheduled work.
Task cost variance percentage.
Task schedule variance percentage.
Baseline cost is the total planned cost for a task as of a status date.
Baseline duration is the original span of time planned to complete a task.
Baseline duration format indicates the display format of the baseline duration value, and whether the baseline duration is considered only an estimate rather than a firm value.
Baseline finish is the planned completion date for a task at the time you saved a baseline.
Baseline start is the planned beginning date for a task at the time you saved a baseline.
Baseline work is the originally planned amount of work to be performed by all resources assigned to a task.
This member is reserved for internal use and is not intended to be used directly from your code.
This member is reserved for internal use and is not intended to be used directly from your code.
This member is reserved for internal use and is not intended to be used directly from your code.
This member is reserved for internal use and is not intended to be used directly from your code.
Top
Methods
Name
Description
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from Object.)
(Inherited from Object.)
(Inherited from DataRow.)
(Inherited from DataRow.)
GetChildRows(String, DataRowVersion)
(Inherited from DataRow.)
GetChildRows(DataRelation, DataRowVersion)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from Object.)
(Inherited from DataRow.)
(Inherited from DataRow.)
GetParentRow(String, DataRowVersion)
(Inherited from DataRow.)
GetParentRow(DataRelation, DataRowVersion)
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
GetParentRows(String, DataRowVersion)
(Inherited from DataRow.)
GetParentRows(DataRelation, DataRowVersion)
(Inherited from DataRow.)
(Inherited from Object.)
(Inherited from DataRow.)
Determines whether the AddAfterTaskUID() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the AddPosition() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the CREATED_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the Duration_Type() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the MOD_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
IsNull(DataColumn, DataRowVersion)
(Inherited from DataRow.)
Determines whether the PROJ_NAME() property is set to a a null reference (Nothing in Visual Basic) value.
IsPROJ_OPT_CURRENCY_DIGITSNull
Determines whether the PROJ_OPT_CURRENCY_DIGITS() property is set to a a null reference (Nothing in Visual Basic) value.
IsPROJ_OPT_CURRENCY_POSITIONNull
Determines whether the PROJ_OPT_CURRENCY_POSITION() property is set to a a null reference (Nothing in Visual Basic) value.
IsPROJ_OPT_CURRENCY_SYMBOLNull
Determines whether the PROJ_OPT_CURRENCY_SYMBOL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the PROJ_TYPE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_DUR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_FINISH() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_OVT_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_OVT_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_START() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACT_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ACWP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_BCWP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_BCWS() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_BUDGET_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_BUDGET_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CAL_UID() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CONSTRAINT_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CONSTRAINT_TYPE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CONTACT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_COST_VAR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CPI() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_CV() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_DEADLINE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_DUR_FMT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_DUR_IS_EST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_DUR_VAR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_DUR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the RHINO() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_EARLY_FINISH() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_EARLY_START() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_EVMETHOD() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_EXT_PROJ_UID() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FINISH_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FINISH_SLACK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FINISH_VAR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FIXED_COST_ACCRUAL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FIXED_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_FREE_SLACK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_HAS_LINKED_FIELDS() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_HYPERLINK_ADDRESS() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_HYPERLINK_FRIENDLY_NAMENull
Determines whether the TASK_HYPERLINK_FRIENDLY_NAME() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_HYPERLINK_SUB_ADDRESSNull
Determines whether the TASK_HYPERLINK_SUB_ADDRESS() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_ID() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IGNORES_RES_CAL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_CRITICAL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_EFFORT_DRIVEN() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_EXTERNAL() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_IS_FROM_FINISH_SUBPROJNull
Determines whether the TASK_IS_FROM_FINISH_SUBPROJ() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_MARKED() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_MILESTONE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_NULL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_OVERALLOCATED() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_IS_READONLY_SUBPROJNull
Determines whether the TASK_IS_READONLY_SUBPROJ() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_IS_RECURRING_SUMMARYNull
Determines whether the TASK_IS_RECURRING_SUMMARY() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_RECURRING() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_ROLLED_UP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_SUBPROJ() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_IS_SUMMARY() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_LATE_FINISH() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_LATE_START() property is set to a a null reference (Nothing in Visual Basic) value.
IsTASK_LEVELING_ADJUSTS_ASSNNull
Determines whether the TASK_LEVELING_ADJUSTS_ASSN() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_LEVELING_CAN_SPLIT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_LEVELING_DELAY_FMT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_LEVELING_DELAY() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_NAME() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_NOTES() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_OUTLINE_LEVEL() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_OUTLINE_NUM() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_OVT_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_OVT_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PARENT_UID() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PCT_COMP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PCT_WORK_COMP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASKY_PHY_PCT_COMP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PRELEVELED_FINISH() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PRELEVELED_START() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_PRIORITY() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REG_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REM_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REM_DUR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REM_OVT_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REM_OVT_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_REM_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_RESUME_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_SPI() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_START_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_START_SLACK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_START_VAR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_STOP_DATE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_SV() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_TCPI() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_TOTAL_SLACK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_TYPPPE() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_VAC() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_WBS() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_WORK_VAR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TASK_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TaskCVP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TaskSVP() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TB_COST() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the DUR_FMT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TB_DUR() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TB_FINISH() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TB_START() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the TB_WORK() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the WOBJ_DOC_REF_CNT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the WOBJ_ISSUE_REF_CNT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the WOBJ_OTHER_REF_CNT() property is set to a a null reference (Nothing in Visual Basic) value.
Determines whether the WOBJ_RISK_REF_CNT() property is set to a a null reference (Nothing in Visual Basic) value.
(Inherited from Object.)
(Inherited from DataRow.)
Sets the AddAfterTaskUID() property to a a null reference (Nothing in Visual Basic) value.
(Inherited from DataRow.)
Sets the AddPosition() property to a a null reference (Nothing in Visual Basic) value.
(Inherited from DataRow.)
SetColumnError(String, String)
(Inherited from DataRow.)
SetColumnError(DataColumn, String)
(Inherited from DataRow.)
Sets the CREATED_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the DurationType() property to a a null reference (Nothing in Visual Basic) value.
Sets the MOD_DATE() property to a a null reference (Nothing in Visual Basic) value.
(Inherited from DataRow.)
(Inherited from DataRow.)
(Inherited from DataRow.)
SetParentRow(DataRow, DataRelation)
(Inherited from DataRow.)
Sets the PROJ_NAME() property to a a null reference (Nothing in Visual Basic) value.
SetPROJ_OPT_CURRENCY_DIGITSNull
Sets the PROJ_OPT_CURRENCY_DIGITS() property to a a null reference (Nothing in Visual Basic) value.
SetPROJ_OPT_CURRENCY_POSITIONNull
Sets the PROJ_OPT_CURRENCY_POSITION() property to a a null reference (Nothing in Visual Basic) value.
SetPROJ_OPT_CURRENCY_SYMBOLNull
Sets the PROJ_OPT_CURRENCY_SYMBOL() property to a a null reference (Nothing in Visual Basic) value.
Sets the PROJ_TYPE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_DUR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_FINISH() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_OVT_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_OVT_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_START() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACT_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ACWP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_BCWP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_BCWS() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_BUDGET_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_BUDGET_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_CAL_UID() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_CONSTRAINT_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_CONSTRAINT_TYPE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_CONTACT() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_COST_VAR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_HYPERLINK_SUB_ADDRESS() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_CV() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_DEADLINE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_DUR_FMT() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_EST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_DUR_VAR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_DUR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_EAC() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_EARLY_FINISH() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_EARLY_START() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_EVMETHOD() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_EXT_PROJ_UID() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_FINISH_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_FINISH_SLACK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_FINISH_VAR() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_FIXED_COST_ACCRUALNull
Sets the TASK_FIXED_COST_ACCRUAL() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_FIXED_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_FREE_SLACK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_HAS_LINKED_FIELDS() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_HYPERLINK_ADDRESS() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_HYPERLINK_FRIENDLY_NAMENull
Sets the TASK_HYPERLINK_FRIENDLY_NAME() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_HYPERLINK_SUB_ADDRESSNull
Sets the TASK_HYPERLINK_SUB_ADDRESS() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_ID() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IGNORES_RES_CAL() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_CRITICAL() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_EFFORT_DRIVEN() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_EXTERNAL() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_IS_FROM_FINISH_SUBPROJNull
Sets the TASK_IS_FROM_FINISH_SUBPROJ() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_MARKED() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_MILESTONE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_NULL() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_OVERALLOCATED() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_IS_READONLY_SUBPROJNull
Sets the TASK_IS_READONLY_SUBPROJ() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_IS_RECURRING_SUMMARYNull
Sets the TASK_IS_RECURRING_SUMMARY() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_RECURRING() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_ROLLED_UP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_SUBPROJ() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_IS_SUMMARY() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_LATE_FINISH() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_LATE_START() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_LEVELING_ADJUSTS_ASSNNull
Sets the TASK_LEVELING_ADJUSTS_ASSN() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_LEVELING_CAN_SPLITNull
Sets the TASK_LEVELING_CAN_SPLIT() property to a a null reference (Nothing in Visual Basic) value.
SetTASK_LEVELING_DELAY_FMTNull
Sets the TASK_LEVELING_DELAY_FMT() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_LEVELING_DELAY() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_NAME() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_NOTES() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_OUTLINE_LEVEL() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_OUTLINE_NUM() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_OVT_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_OVT_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PARENT_UID() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PCT_COMP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PCT_WORK_COMP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PHY_PCT_COMP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PRELEVELED_FINISH() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PRELEVELED_START() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_PRIORITY() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REG_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REM_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REM_DUR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REM_OVT_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REM_OVT_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_REM_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_RESUME_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_SPIN() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_START_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_START_SLACK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_START_VAR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_STOP_DATE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_SV() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_TCP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_TOTAL_SLACK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_TYPE() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_VAC() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_WBS() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_WORK_VAR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TASK_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the TaskCVP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TaskSVP() property to a a null reference (Nothing in Visual Basic) value.
Sets the TB_COST() property to a a null reference (Nothing in Visual Basic) value.
Sets the DUR_FMT() property to a a null reference (Nothing in Visual Basic) value.
Sets the TB_DUR() property to a a null reference (Nothing in Visual Basic) value.
Sets the TB_FINISH() property to a a null reference (Nothing in Visual Basic) value.
Sets the TB_START() property to a a null reference (Nothing in Visual Basic) value.
Sets the TB_WORK() property to a a null reference (Nothing in Visual Basic) value.
Sets the WOBJ_DOC_REF_CNT() property to a a null reference (Nothing in Visual Basic) value.
Sets the WOBJ_ISSUE_REF_CNT() property to a a null reference (Nothing in Visual Basic) value.
Sets the WOBJ_OTHER_REF_CNT() property to a a null reference (Nothing in Visual Basic) value.
Sets the WOBJ_RISK_REF_CNT() property to a a null reference (Nothing in Visual Basic) value.
(Inherited from Object.)
Top