Поделиться через


PBM_STEPIT

A version of this page is also available for

Windows Embedded CE 6.0 R3

4/8/2010

This message advances the current position for a progress bar by the step increment and redraws the bar to reflect the new position. An application sets the step increment by sending the PBM_SETSTEP message.

Syntax

PBM_STEPIT

Parameters

  • wParam
    Not used.
  • lParam
    Not used.

Return Value

The previous position indicates success.

Remarks

When the position exceeds the maximum range value, this message resets the current position so that the progress indicator starts over again from the beginning.

Requirements

Header commctrl.h
Windows Embedded CE Windows CE 1.0 and later
Windows Mobile Windows Mobile Version 5.0 and later

See Also

Reference

PBM_SETSTEP
Progress Bar Controls Messages