Work Center Load (report)

The Work Center Load report shows the work load on a work center. The load on a work center is the sum of the required number of times that all the planned and actual orders are run on the work center in a specified period of time.

Use cases

Analyze the load on a work center.

Try the report

Try the report here: Work Center Load

Tip

If you hold down the CTRL key while you select the report link, the report opens on a new browser tab. In this way, you can stay on the current page while you explore the report on the other browser tab.