Editar

Partilhar via


Manufacturing

Note

The features this article describes are available only if you have the Premium experience. To learn more, go to Change Which Features are Displayed.

When demand is planned for and the materials are issued according to production BOMs, production operations can start in the sequence defined by the production order routing.

An important part of production, from a system point of view, is to post production output to report progress and to update inventory with the finished items. You can post output manually, by filling in and posting journal lines after production operations. Or, it can post automatically with the use of backward flushing. In that case, material consumption is automatically posted along with output when the production order changes to finished.

As an alternative to the batch journal for output posting for multiple production orders, you can use the Production Journal page to post consumption and/or output for one production order line.

There are a few things to set up before you can start production. For example, work centers, routings, and production BOMs. To learn more, go to Setting Up Manufacturing.

The following table describes a sequence of tasks, with links to the articles that describe them.

To See
Understand how production orders work. About Production Orders
Create production orders manually. Create Production Orders
Analyze and monitor your manufacturing KPIs with the Power BI Projects apps. Power BI Manufacturing app
Outsource all or selected operations in a production order to a subcontractor. Subcontract Manufacturing
Record and post production output along with material and time consumption for a single released production order line. Post Consumption and Output for One Released Production Order Line
Batch-post the quantity of components used per operation in a journal that processes multiple planned production orders. Batch Post Consumption
Post the quantity of finished items and the time spent per operation in a journal that processes multiple released production orders. Batch Post Output and Run Times
Undo output, for example, because a data entry error occurred and the amount is incorrect. Reverse Output Posting
Post the number of items produced in each finished operation that qualify as scrap material and not finished output. Post Scrap
View the shop floor load as a result of planned and released production orders. View the Load in Work and Machine Centers
Use the Capacity Journal page to post consumed capacities that aren't assigned to a production order, such as maintenance work. Post Capacities
Calculate and adjust the cost of finished production items and consumed components for financial reconciliation. About Finished Production Order Costs

See also

Setting Up Manufacturing
Power BI Manufacturing app
Planning
Inventory
Purchasing
Work with Business Central

Start a free trial!

Find free e-learning modules for Business Central here