Partilhar via


Conversations with data in analytic charts

Today’s post is by Jason Robertson, showing some ways to have a conversation with data using analytic charts in PerformancePoint Services for SharePoint 2010. I built a simple model using Bureau of Transportation 's Airline On-Time Performance and Causes of Flight Delays and let Jason to go hunting. He built the initial chart using Dashboard Designer then did the rest of his investigation within a SharePoint dashboard page. Jason is not a professional air traffic controller but he does know the difference between “clearance” and “Clarence.” Roger?

Flight delays are never fun and often, as a traveler, the reason behind a specific delayed flight is a mystery.

I started by creating a simple chart that I thought might have useful information. It has Flight Carrier on Series and Delay Departure times on the Bottom Axis.

Screen capture of chart showing no data initially

When I first see this I know that something must be wrong… I can't see any data and I'm sure there are some airlines with departure delay. I can see the start of a long list of carriers in the legend and all the ones that are displayed have no data. I can easily filter out all those empty series to show only those with data. I right-click on the chart, select Filter, select Filter Empty Series.

Screen capture of chart and filter options

Now that all those empty series are gone I'm able to see data that may be interesting.

Screen capture of chart showing a variety of bar lengths

My bars are a little crowded on this chart. I don't really need the legend so I'll hide it. I'll be able to see the same information by hovering over the bars. I right-click on the chart again and this time I select Format Report then Don't Show.

Screen capture of turing off legend

Now I can start to poke around to find interesting data. First I see that there's one member that's about twice the average. I can hover over it to see what member it is and what the data is.

Screen capture of tooltip in analytic chart

It turns out that it's Southwest. I've heard that Southwest makes a lot of shorter flights and I wonder if this is related to their delayed departures. I can switch my Series measure to see carriers by Count of Flights. I right-click again and select Select Measures…. In the Select measures dialog I remove the departure delay measure and add a flight count measure.

Screen capture of selecting measures

Sure enough, Southwest has over twice as many flights as all of the other airlines.

Screen capture of number of flights

A better measure would be an average of delay per flight. Luckily the cube also has average measures so I use Select Measures to switch to delay average.

Screen capture of departure early/late

Now Southwest is more in line with the other airlines with an average delay of 10 minutes. There are, however, two airlines that stand out on this new chart for having negative delay departures. That's obviously well below the industry average. The data dictionary provided with the cube tells me that they can be negative because this measure counts early departures as time credited towards delays. I hover over the two stand-outs to see that they are "Aloha Air Cargo" and "Hawaiian Airlines." Now I know that if I want my flights to be on time I need to spend more time in Hawaii.

I'm still interested in Southwest because I fly them often and I wonder how they perform when flying out of my home state of Idaho. To find out I'll need to cross drill to flight origin by state. I right-click on Southwest, select Drill Down To and select origin state.

Screen capture of drill-down-to to origin state

Screen capture of the resulting chart

The chart shows that Idaho has the lowest departure delay. I hover over it to see that the average delay departure there is only 5 minutes on Southwest. That's something I can live with.

Comments

  • Anonymous
    June 10, 2010
    A decomposition tree analysis would have worked out well in this conversation as well.  I was told that a posting would be coming out showing how a decomposition tree report could be a starting point like it currently can be in ProClarity.  Will this be posted sometime soon?  I know it has already been done by someone and I have been patiently waiting for the blog posting.  Thanks.

  • Anonymous
    June 10, 2010
    Hi Dan, sure, decomposition tree might have been useful at some points, and you can certainly launch it from any data point that was shown here by the right-click menu. I know what you mean about using decomposition tree as a starting point. Unfortunately that scenario got uglier than we'd like by the time SharePoint 2010 released. We're working on it.

  • Anonymous
    June 16, 2010
    Is there any way to use 3D bar charts in PPS2010?

  • Anonymous
    June 16, 2010
    Jesse, no, there is no 3D mode yet for the PerformancePoint Services interactive charts. You can deliver 3D charts with Reporting Services where there's also a constrained interactivity model you can apply. I definitely encourage use of 2D if there is a choice! There are some decision making activities (like comparison of values) that get more difficult or risky when viewing (current state of technology) 3D charts w/ changing data sets.

  • Anonymous
    December 02, 2010
    Hello, Wade. When I change the filter, chart returns to its original position. Is it possible to save the changes of chart?

  • Anonymous
    December 02, 2010
    Hello, Wade. When I change the filter, chart returns to its original position. Is it possible to save the changes of chart?

  • Anonymous
    July 06, 2011
    Is it possible to flip the axis, so the flight cmopanies will be on the Y axis and time on X axis?

  • Anonymous
    July 06, 2011
    Den, if a PerformancePoint dashboard filter is connected to an analytic chart or grid, when it's toggled the analytic chart or grid will reset to its original state, and then the filter is applied. We found that to be the most consistant behavior which we could improve on later. (We haven't gotten to the improvement just yet though.) Rune, yes. The "Pivot" option you'll see in some of the screenshots above flips the axes.

  • Anonymous
    August 27, 2012
    Is it possible to set axis labels in PPS