Partilhar via


PPE Maintenance Window (December 17th 2013)

Please note, the HealthVault Pre-Production Environment (PPE) instances in the U.S. and U.K. will be unavailable for a 3 hour maintenance window as indicated below. 


Start Time: December 17th 2013 at 1 AM PST

End Time:  December 17th 2013 at 4 AM PST


Please use the MSDN Forum to report any issues outside this window.

*Note: when originally posted, the maintenance window was estimated to be 12/16 between 1 AM and 4 AM. This has been pushed back 1 day to 12/17.