Compartilhar via


Design Details: Variance

Variance is defined as the difference between the actual cost and the standard cost, as described in the following formula.

actual coststandard cost = variance

If the actual cost changes, for example, because you post an item charge on a later date, then the variance is updated accordingly.

Note

Revaluation does not affect the variance calculation, because revaluation only changes the inventory value.

Example

The following example illustrates how variance is calculated for purchased items. It is based on the following scenario:

  1. The user purchases an item at LCY 90.00, but the standard cost is LCY 100.00. Accordingly, the purchase variance is LCY –10.00.

  2. LCY 10.00 is credited to the purchase variance account.

  3. The user posts an item charge of LCY 20.00. Accordingly, the actual cost is increased to LCY 110.00, and the value of the purchase variance becomes LCY 10.00.

  4. LCY 20.00 is debited to the purchase variance account. Accordingly, the net purchase variance becomes LCY 10.00.

  5. The user revalues the item from LCY 100.00 to LCY 70.00. This does not affect the variance calculation, only the inventory value.

The following table shows the resulting value entries.

Purchase variance calculation

Determining the Standard Cost

The standard cost is used when calculating variance and the amount to capitalize. Since the standard cost can be changed over time because of manual update calculation, you need a point in time when the standard cost is fixed for variance calculation. This point is when the inventory increase is invoiced. For produced or assembled items, the point when standard cost is determined is when the cost is adjusted.

The following table shows how different cost shares are calculated for produced and assembled items when you use the Calculate Standard Cost function.

Cost share Purchased item Produced/Assembled item

Standard Cost

Single-Level Material Cost + Single-Level Capacity Cost + Single-Level Subcontrd. Cost + Single-Level Cap. Ovhd. Cost + Single-Level Mfg. Ovhd. Cost

Single-Level Material Cost

Unit Cost

Equation 1

Single-Level Capacity Cost

Not applicable

Equation 2

Single-Level Subcontrd. Cost

Not applicable

Equation 3

Single-Level Cap. Ovhd Cost

Not applicable

Equation 4

Single-Level Mfg. Ovhd Cost

Not applicable

(Single-Level Material Cost + Single-Level Capacity Cost + Single-Level Subcontrd. Cost) * Indirect Cost % / 100 + Overhead Rate

Rolled-up Material Cost

Unit Cost

Equation 5

Rolled-up Capacity Cost

Not applicable

Equation 6

Rolled-up Subcontracted Cost

Not applicable

Equation 7

Rolled-up Cap. Overhead Cost

Not applicable

Equation 8

Rolled-up Mfg. Ovhd Cost

Not applicable

Equation 9

See Also

Concepts

Design Details: Costing Methods

Other Resources

Design Details: Inventory Costing