Compartilhar via


Implement Standard Cost Change Batch Job

Updates the changes in the standard cost in the Item table with the ones in the Standard Cost Worksheet table. The standard cost change suggestions can be created with the Suggest Item Standard Cost and/or the Suggest Work/Mach Ctr Std Cost batch job, and they can also be modified. The contents of all the fields in the standard cost change suggestions are transferred. When you implemet suggestions of changes to standard costs, you can see them on the item card and/or on the work/machine center cards. A revaluation journal is also created for you to update the value of existing stock.

Options

Posting Date: Enter the date that the revaluation should take place.

Document No.:Enter the number of the revaluation journal lines. If there is a number series set up on the item journal batch name, the document number will follow the ledger entries made by the posting of the revaluation journal. Otherwise, you can manually enter a number.

Item Journal Template: Enter the name of the revaluation journal template.

Item Journal Batch Name: Enter the name of the actual revaluation journal

Click OK to start the batch job. If you do not want to run the batch job now, click Cancel to close the window.

Tip

For more information on how to work with batch jobs, see How to: Run Batch Jobs and How to: Set Filters. For assistance in finding specific pages, see Search.