다음을 통해 공유


Test Cases for the DVR Engine Scenario Tests (Windows Embedded CE 6.0)

1/6/2010

The following table describes each test case in the DVR Engine Scenario Tests.

Test case Result

100

Tests conversion of a large temporary recording to a permanent recording.

101

Verifies the pause buffer length is accurate.

102

Verifies the end event is triggered.

103

Verifies repeated building of the playback graph bound to live..

104

Verifies orphaning (dissociation of a portion of the pause buffer which the playback graph is accessing from the main buffer due to it falling out of the pause buffer) of a permanent recording.

105

Verifies orphaning (dissociation of a portion of the pause buffer which the playback graph is accessing from the main buffer due to it falling out of the pause buffer) of a temporary recording

See Also

Other Resources

DVR Engine Scenario Tests
DVR Engine BVT Tests