다음을 통해 공유


SPIntlCal.GetWeekNumber Method

Returns the week number of the specified date in the specified calendar type.

Namespace:  Microsoft.SharePoint.Utilities
Assembly:  Microsoft.SharePoint (in Microsoft.SharePoint.dll)
Available in Sandboxed Solutions: No

Syntax

'Declaration
Public Shared Function GetWeekNumber ( _
    calType As SPCalendarType, _
    di As SimpleDate, _
    FirstDayOfWeek As Integer, _
    FirstWeekOfYear As Short _
) As Integer
'Usage
Dim calType As SPCalendarType
Dim di As SimpleDate
Dim FirstDayOfWeek As Integer
Dim FirstWeekOfYear As Short
Dim returnValue As Integer

returnValue = SPIntlCal.GetWeekNumber(calType, _
    di, FirstDayOfWeek, FirstWeekOfYear)
public static int GetWeekNumber(
    SPCalendarType calType,
    SimpleDate di,
    int FirstDayOfWeek,
    short FirstWeekOfYear
)

Parameters

  • FirstDayOfWeek
    Type: System.Int32

    A 32-bit integer that represents the first day of the week displayed in the calendar, in the range 0 through 6; where 0 indicates Sunday, 1 indicates Monday, and so on.

  • FirstWeekOfYear
    Type: System.Int16

    A Short that that represents the first week of the year displayed in the calendar: 0 (the week in which January 1 occurs), 1 (the first week that has at least four days in the new year), or 2 (the first full week of the year).

Return Value

Type: System.Int32
An integer value that represents the week number.

See Also

Reference

SPIntlCal Class

SPIntlCal Members

Microsoft.SharePoint.Utilities Namespace