VAC Element
The variance at completion between the baseline cost and the total cost for an assignment on a task.
<VAC>
FloatValue
</VAC>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
The variance at completion between the baseline cost and the total cost for an assignment on a task.
<VAC>
FloatValue
</VAC>
Minimum: 0 Maximum: 1 |