FinishDate Element
The finish date of the project. Required if ScheduleFromStart is false.
<FinishDate>
DateTimeValue
</FinishDate>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
The finish date of the project. Required if ScheduleFromStart is false.
<FinishDate>
DateTimeValue
</FinishDate>
Minimum: 0 Maximum: 1 |