CreateDate Element
The date and time that a task was added to a project.
<CreateDate>
DateTimeValue
</CreateDate>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
The date and time that a task was added to a project.
<CreateDate>
DateTimeValue
</CreateDate>
Minimum: 0 Maximum: 1 |