다음을 통해 공유


West Region IT Camp Follow Up for Q2 series

We are continuing to deliver IT Camps throughout the West Region (and the US). In our Q2 (October 30 – December 31), we have modified our content to include a 60 minute session on Windows 8. In addition to this, we are continuing to cover Windows Server 2012 Hyper-V (SMB, Hyper-V replica, Scalability and Shared Nothing Live Migration) and Windows Azure Virtual Machines (IaaS). I am posting the PowerPoint deck for the Windows 8 Session here. The PowerPoint deck with the other content was already posted back in September: https://blogs.technet.com/b/haroldwong/archive/2012/09/25/it-camps-in-west-region-recap-and-resources-page.aspx

FY13 Q2 IT Camp - Windows 8 Overview from Harold Wong

To download the deck, click to view on Slideshare (lower left corner).

Harold Wong