次の方法で共有


Deployment of Hyper-V, SCVMM and Windows Server 2012

image

Due to popular demand, we will have a 4-days training for Deployment of Hyper-V, SCVMM and Windows Server 2012.

This session will cover Hyper-V and SCVMM comprehensively from design & planning to deployment. Included is also the ability to deploy applications through self service via AppController and protecting your virtual environment with DPM.

 

Details:

Date: 18th – 21st December 2012 (Tuesday – Thursday)

Time: 9am – 5pm

Venue: 

Iverson Associates Sdn Bhd
Suites T113-T114, 3rd Floor, Centrepoint, Lebuh Bandar Utama,
Bandar Utama, 47800 Petaling Jaya, Selangor

RSVP    :    Latest by 12 December, Email to voonie.wong@iverson.com.my OR Call 03-7726 2678

Special training fee : RM400/person

 

Course Outline:

Day 1: Overview and introduction of Windows Server 2012 & Hyper-V

· Design and planning of Hyper-V projects

· Deploying Windows Server 2012 and Hyper-V, MS Hyper-V Server 2012

· Managing with RSAT and Hyper-V Manager

· Converting physical/virtual to virtual machines (P2V/V2V)

· MAP 7

· Setting up fail-over VM cluster in WS 2012

· Live migration without SAN

· Hyper-V Replica

Day 2: Overview of System Center 2012 – Virtual Machine Manager& Understanding SCVMM

· Network virtualization

· Logical networks and VM networks

· Installing and deploying SCVMM

Video

· Network virtualization

· SR-IOV

· Dynamic optimization

· Power optimization

· PRO

Day 3: Deep dive into SCVMM

· Deploying and managing Hyper-V virtual machines, apps and service template with SCVMM

Video

· Deploying from bare metal

· Managing heterogeneous hypervisors

Day 4: Understanding AppController & Understanding DPM for backup, recovery and protecting Hyper-V

· Installing AppController

· Deploying apps with AppController

· Leveraging Azure IaaS for disaster recovery

· Installing DPM

· Protecting Hyper-V, virtual machines and SQL server with DPM