次の方法で共有


West Region IT Camp Follow Up for Q2 series

We are continuing to deliver IT Camps throughout the West Region (and the US). In our Q2 (October 30 – December 31), we have modified our content to include a 60 minute session on Windows 8. In addition to this, we are continuing to cover Windows Server 2012 Hyper-V (SMB, Hyper-V replica, Scalability and Shared Nothing Live Migration) and Windows Azure Virtual Machines (IaaS). I am posting the PowerPoint deck for the Windows 8 Session here. The PowerPoint deck with the other content was already posted back in September: https://blogs.technet.com/b/haroldwong/archive/2012/09/25/it-camps-in-west-region-recap-and-resources-page.aspx

FY13 Q2 IT Camp - Windows 8 Overview from Harold Wong

To download the deck, click to view on Slideshare (lower left corner).

Harold Wong