Condividi tramite


LoadGen Server Stress - Start Test for Fault Tolerant Server

This automated test measures the stress load on a fault tolerant server. This test does the following:

  1. Copies test files to the Master Client.

  2. Runs the test on the Master Client.

  3. Copies the test logs after the test finishes.

Test details

Associated requirements

System.Server.FaultTolerant.Core

See the system hardware requirements.

Platforms

Windows Server 2012 (x64) Windows Server 2008 R2 (x64) Windows Server 2012 R2

Expected run time

~1440 minutes

Categories

Certification

Type

Automated

 

Running the test

Before you run the test:

  1. Verify the test setup as described in the test requirements: System Server Testing Prerequisites and Test Server Configuration.

  2. Run LoadGen Server Stress - Run First - Set Machine Policies first, to setup the correct machine policy settings.

  3. From HCK Studio, select and run test.

Troubleshooting

For troubleshooting information, see Troubleshooting System Server Testing.

 

 

Send comments about this topic to Microsoft