Modifica

Condividi tramite


ShapeRange.IncrementTop(Single) Method

Definition

public:
 void IncrementTop(float Increment);
public void IncrementTop (float Increment);
abstract member IncrementTop : single -> unit
Public Sub IncrementTop (Increment As Single)

Parameters

Increment
Single

Applies to