Modifica

Condividi tramite


PjField Enum

Definition

public enum class PjField
[System.Runtime.InteropServices.Guid("DD3D3A50-919A-11CF-982C-00AA00322803")]
public enum PjField
type PjField = 
Public Enum PjField
Inheritance
PjField
Attributes

Fields

Name Value Description
pjTaskWork 188743680
pjTaskBaselineWork 188743681
pjTaskActualWork 188743682
pjTaskWorkVariance 188743683
pjTaskRemainingWork 188743684
pjTaskCost 188743685
pjTaskBaselineCost 188743686
pjTaskActualCost 188743687
pjTaskFixedCost 188743688
pjTaskCostVariance 188743689
pjTaskRemainingCost 188743690
pjTaskBCWP 188743691
pjTaskBCWS 188743692
pjTaskSV 188743693
pjTaskName 188743694
pjTaskNotes 188743695
pjTaskWBS 188743696
pjTaskConstraintType 188743697
pjTaskConstraintDate 188743698
pjTaskCritical 188743699
pjTaskDelay 188743700
pjTaskLevelDelay 188743700
pjTaskFreeSlack 188743701
pjTaskTotalSlack 188743702
pjTaskID 188743703
pjTaskMilestone 188743704
pjTaskPriority 188743705
pjTaskSubproject 188743706
pjTaskBaselineDuration 188743707
pjTaskActualDuration 188743708
pjTaskDuration 188743709
pjTaskDurationVariance 188743710
pjTaskRemainingDuration 188743711
pjTaskPercentComplete 188743712
pjTaskPercentWorkComplete 188743713
pjTaskFixedDuration 188743714
pjTaskStart 188743715
pjTaskFinish 188743716
pjTaskEarlyStart 188743717
pjTaskEarlyFinish 188743718
pjTaskLateStart 188743719
pjTaskLateFinish 188743720
pjTaskActualStart 188743721
pjTaskActualFinish 188743722
pjTaskBaselineStart 188743723
pjTaskBaselineFinish 188743724
pjTaskStartVariance 188743725
pjTaskFinishVariance 188743726
pjTaskPredecessors 188743727
pjTaskSuccessors 188743728
pjTaskResourceNames 188743729
pjTaskResourceInitials 188743730
pjTaskText1 188743731
pjTaskStart1 188743732
pjTaskFinish1 188743733
pjTaskText2 188743734
pjTaskStart2 188743735
pjTaskFinish2 188743736
pjTaskText3 188743737
pjTaskStart3 188743738
pjTaskFinish3 188743739
pjTaskText4 188743740
pjTaskStart4 188743741
pjTaskFinish4 188743742
pjTaskText5 188743743
pjTaskStart5 188743744
pjTaskFinish5 188743745
pjTaskText6 188743746
pjTaskText7 188743747
pjTaskText8 188743748
pjTaskText9 188743749
pjTaskText10 188743750
pjTaskMarked 188743751
pjTaskFlag1 188743752
pjTaskFlag2 188743753
pjTaskFlag3 188743754
pjTaskFlag4 188743755
pjTaskFlag5 188743756
pjTaskFlag6 188743757
pjTaskFlag7 188743758
pjTaskFlag8 188743759
pjTaskFlag9 188743760
pjTaskFlag10 188743761
pjTaskRollup 188743762
pjTaskCV 188743763
pjTaskProject 188743764
pjTaskOutlineLevel 188743765
pjTaskUniqueID 188743766
pjTaskNumber1 188743767
pjTaskNumber2 188743768
pjTaskNumber3 188743769
pjTaskNumber4 188743770
pjTaskNumber5 188743771
pjTaskSummary 188743772
pjTaskCreated 188743773
pjTaskSheetNotes 188743774
pjTaskUniquePredecessors 188743775
pjTaskUniqueSuccessors 188743776
pjTaskObjects 188743777
pjTaskLinkedFields 188743778
pjTaskResume 188743779
pjTaskStop 188743780
pjTaskResumeNoEarlierThan 188743781
pjTaskOutlineNumber 188743782
pjTaskDuration1 188743783
pjTaskDuration2 188743784
pjTaskDuration3 188743785
pjTaskCost1 188743786
pjTaskCost2 188743787
pjTaskCost3 188743788
pjTaskHideBar 188743789
pjTaskConfirmed 188743790
pjTaskUpdateNeeded 188743791
pjTaskContact 188743792
pjTaskResourceGroup 188743793
pjTaskACWP 188743800
pjTaskType 188743808
pjTaskRecurring 188743809
pjTaskEffortDriven 188743812
pjTaskParentTask 188743815
pjTaskOvertimeWork 188743843
pjTaskActualOvertimeWork 188743844
pjTaskRemainingOvertimeWork 188743845
pjTaskRegularWork 188743846
pjTaskOvertimeCost 188743848
pjTaskActualOvertimeCost 188743849
pjTaskRemainingOvertimeCost 188743850
pjTaskFixedCostAccrual 188743880
pjTaskIndicators 188743885
188743897
pjTaskHyperlinkAddress 188743898
pjTaskHyperlinkSubAddress 188743899
pjTaskHyperlinkHref 188743900
pjTaskIsAssignment 188743904
pjTaskOverallocated 188743905
pjTaskExternalTask 188743912
pjTaskSubprojectReadOnly 188743926
pjTaskResponsePending 188743930
pjTaskTeamStatusPending 188743931
pjTaskLevelCanSplit 188743932
pjTaskLevelAssignments 188743933
pjTaskWorkContour 188743936
pjTaskCost4 188743938
pjTaskCost5 188743939
pjTaskCost6 188743940
pjTaskCost7 188743941
pjTaskCost8 188743942
pjTaskCost9 188743943
pjTaskCost10 188743944
pjTaskDate1 188743945
pjTaskDate2 188743946
pjTaskDate3 188743947
pjTaskDate4 188743948
pjTaskDate5 188743949
pjTaskDate6 188743950
pjTaskDate7 188743951
pjTaskDate8 188743952
pjTaskDate9 188743953
pjTaskDate10 188743954
pjTaskDuration4 188743955
pjTaskDuration5 188743956
pjTaskDuration6 188743957
pjTaskDuration7 188743958
pjTaskDuration8 188743959
pjTaskDuration9 188743960
pjTaskDuration10 188743961
pjTaskStart6 188743962
pjTaskFinish6 188743963
pjTaskStart7 188743964
pjTaskFinish7 188743965
pjTaskStart8 188743966
pjTaskFinish8 188743967
pjTaskStart9 188743968
pjTaskFinish9 188743969
pjTaskStart10 188743970
pjTaskFinish10 188743971
pjTaskFlag11 188743972
pjTaskFlag12 188743973
pjTaskFlag13 188743974
pjTaskFlag14 188743975
pjTaskFlag15 188743976
pjTaskFlag16 188743977
pjTaskFlag17 188743978
pjTaskFlag18 188743979
pjTaskFlag19 188743980
pjTaskFlag20 188743981
pjTaskNumber6 188743982
pjTaskNumber7 188743983
pjTaskNumber8 188743984
pjTaskNumber9 188743985
pjTaskNumber10 188743986
pjTaskNumber11 188743987
pjTaskNumber12 188743988
pjTaskNumber13 188743989
pjTaskNumber14 188743990
pjTaskNumber15 188743991
pjTaskNumber16 188743992
pjTaskNumber17 188743993
pjTaskNumber18 188743994
pjTaskNumber19 188743995
pjTaskNumber20 188743996
pjTaskText11 188743997
pjTaskText12 188743998
pjTaskText13 188743999
pjTaskText14 188744000
pjTaskText15 188744001
pjTaskText16 188744002
pjTaskText17 188744003
pjTaskText18 188744004
pjTaskText19 188744005
pjTaskText20 188744006
pjTaskText21 188744007
pjTaskText22 188744008
pjTaskText23 188744009
pjTaskText24 188744010
pjTaskText25 188744011
pjTaskText26 188744012
pjTaskText27 188744013
pjTaskText28 188744014
pjTaskText29 188744015
pjTaskText30 188744016
pjTaskResourcePhonetics 188744029
pjTaskIndex 188744040
pjTaskAssignmentDelay 188744046
pjTaskAssignmentUnits 188744047
pjTaskCostRateTable 188744048
pjTaskPreleveledStart 188744049
pjTaskPreleveledFinish 188744050
pjTaskEstimated 188744076
pjTaskIgnoreResourceCalendar 188744079
pjTaskCalendar 188744082
pjTaskDuration1Estimated 188744083
pjTaskDuration2Estimated 188744084
pjTaskDuration3Estimated 188744085
pjTaskDuration4Estimated 188744086
pjTaskDuration5Estimated 188744087
pjTaskDuration6Estimated 188744088
pjTaskDuration7Estimated 188744089
pjTaskDuration8Estimated 188744090
pjTaskDuration9Estimated 188744091
pjTaskDuration10Estimated 188744092
pjTaskBaselineDurationEstimated 188744093
pjTaskOutlineCode1 188744096
pjTaskOutlineCode2 188744098
pjTaskOutlineCode3 188744100
pjTaskOutlineCode4 188744102
pjTaskOutlineCode5 188744104
pjTaskOutlineCode6 188744106
pjTaskOutlineCode7 188744108
pjTaskOutlineCode8 188744110
pjTaskOutlineCode9 188744112
pjTaskOutlineCode10 188744114
pjTaskDeadline 188744117
pjTaskStartSlack 188744118
pjTaskFinishSlack 188744119
pjTaskVAC 188744121
pjTaskGroupBySummary 188744126
pjTaskWBSPredecessors 188744129
pjTaskWBSSuccessors 188744130
pjTaskResourceType 188744131
pjTaskHyperlinkScreenTip 188744132
pjTaskBaseline1Start 188744162
pjTaskBaseline1Finish 188744163
pjTaskBaseline1Cost 188744164
pjTaskBaseline1Work 188744165
pjTaskBaseline1Duration 188744167
pjTaskBaseline2Start 188744173
pjTaskBaseline2Finish 188744174
pjTaskBaseline2Cost 188744175
pjTaskBaseline2Work 188744176
pjTaskBaseline2Duration 188744178
pjTaskBaseline3Start 188744184
pjTaskBaseline3Finish 188744185
pjTaskBaseline3Cost 188744186
pjTaskBaseline3Work 188744187
pjTaskBaseline3Duration 188744189
pjTaskBaseline4Start 188744195
pjTaskBaseline4Finish 188744196
pjTaskBaseline4Cost 188744197
pjTaskBaseline4Work 188744198
pjTaskBaseline4Duration 188744200
pjTaskBaseline5Start 188744206
pjTaskBaseline5Finish 188744207
pjTaskBaseline5Cost 188744208
pjTaskBaseline5Work 188744209
pjTaskBaseline5Duration 188744211
pjTaskCPI 188744217
pjTaskSPI 188744218
pjTaskCVPercent 188744219
pjTaskSVPercent 188744220
pjTaskEAC 188744221
pjTaskTCPI 188744222
pjTaskStatus 188744223
pjTaskBaseline6Start 188744224
pjTaskBaseline6Finish 188744225
pjTaskBaseline6Cost 188744226
pjTaskBaseline6Work 188744227
pjTaskBaseline6Duration 188744229
pjTaskBaseline7Start 188744235
pjTaskBaseline7Finish 188744236
pjTaskBaseline7Cost 188744237
pjTaskBaseline7Work 188744238
pjTaskBaseline7Duration 188744240
pjTaskBaseline8Start 188744246
pjTaskBaseline8Finish 188744247
pjTaskBaseline8Cost 188744248
pjTaskBaseline8Work 188744249
pjTaskBaseline8Duration 188744251
pjTaskBaseline9Start 188744257
pjTaskBaseline9Finish 188744258
pjTaskBaseline9Cost 188744259
pjTaskBaseline9Work 188744260
pjTaskBaseline9Duration 188744262
pjTaskBaseline10Start 188744268
pjTaskBaseline10Finish 188744269
pjTaskBaseline10Cost 188744270
pjTaskBaseline10Work 188744271
pjTaskBaseline10Duration 188744273
pjTaskEnterpriseCost1 188744279
pjTaskEnterpriseCost2 188744280
pjTaskEnterpriseCost3 188744281
pjTaskEnterpriseCost4 188744282
pjTaskEnterpriseCost5 188744283
pjTaskEnterpriseCost6 188744284
pjTaskEnterpriseCost7 188744285
pjTaskEnterpriseCost8 188744286
pjTaskEnterpriseCost9 188744287
pjTaskEnterpriseCost10 188744288
pjTaskEnterpriseDate1 188744289
pjTaskEnterpriseDate2 188744290
pjTaskEnterpriseDate3 188744291
pjTaskEnterpriseDate4 188744292
pjTaskEnterpriseDate5 188744293
pjTaskEnterpriseDate6 188744294
pjTaskEnterpriseDate7 188744295
pjTaskEnterpriseDate8 188744296
pjTaskEnterpriseDate9 188744297
pjTaskEnterpriseDate10 188744298
pjTaskEnterpriseDate11 188744299
pjTaskEnterpriseDate12 188744300
pjTaskEnterpriseDate13 188744301
pjTaskEnterpriseDate14 188744302
pjTaskEnterpriseDate15 188744303
pjTaskEnterpriseDate16 188744304
pjTaskEnterpriseDate17 188744305
pjTaskEnterpriseDate18 188744306
pjTaskEnterpriseDate19 188744307
pjTaskEnterpriseDate20 188744308
pjTaskEnterpriseDate21 188744309
pjTaskEnterpriseDate22 188744310
pjTaskEnterpriseDate23 188744311
pjTaskEnterpriseDate24 188744312
pjTaskEnterpriseDate25 188744313
pjTaskEnterpriseDate26 188744314
pjTaskEnterpriseDate27 188744315
pjTaskEnterpriseDate28 188744316
pjTaskEnterpriseDate29 188744317
pjTaskEnterpriseDate30 188744318
pjTaskEnterpriseDuration1 188744319
pjTaskEnterpriseDuration2 188744320
pjTaskEnterpriseDuration3 188744321
pjTaskEnterpriseDuration4 188744322
pjTaskEnterpriseDuration5 188744323
pjTaskEnterpriseDuration6 188744324
pjTaskEnterpriseDuration7 188744325
pjTaskEnterpriseDuration8 188744326
pjTaskEnterpriseDuration9 188744327
pjTaskEnterpriseDuration10 188744328
pjTaskEnterpriseFlag1 188744339
pjTaskEnterpriseFlag2 188744340
pjTaskEnterpriseFlag3 188744341
pjTaskEnterpriseFlag4 188744342
pjTaskEnterpriseFlag5 188744343
pjTaskEnterpriseFlag6 188744344
pjTaskEnterpriseFlag7 188744345
pjTaskEnterpriseFlag8 188744346
pjTaskEnterpriseFlag9 188744347
pjTaskEnterpriseFlag10 188744348
pjTaskEnterpriseFlag11 188744349
pjTaskEnterpriseFlag12 188744350
pjTaskEnterpriseFlag13 188744351
pjTaskEnterpriseFlag14 188744352
pjTaskEnterpriseFlag15 188744353
pjTaskEnterpriseFlag16 188744354
pjTaskEnterpriseFlag17 188744355
pjTaskEnterpriseFlag18 188744356
pjTaskEnterpriseFlag19 188744357
pjTaskEnterpriseFlag20 188744358
pjTaskEnterpriseNumber1 188744379
pjTaskEnterpriseNumber2 188744380
pjTaskEnterpriseNumber3 188744381
pjTaskEnterpriseNumber4 188744382
pjTaskEnterpriseNumber5 188744383
pjTaskEnterpriseNumber6 188744384
pjTaskEnterpriseNumber7 188744385
pjTaskEnterpriseNumber8 188744386
pjTaskEnterpriseNumber9 188744387
pjTaskEnterpriseNumber10 188744388
pjTaskEnterpriseNumber11 188744389
pjTaskEnterpriseNumber12 188744390
pjTaskEnterpriseNumber13 188744391
pjTaskEnterpriseNumber14 188744392
pjTaskEnterpriseNumber15 188744393
pjTaskEnterpriseNumber16 188744394
pjTaskEnterpriseNumber17 188744395
pjTaskEnterpriseNumber18 188744396
pjTaskEnterpriseNumber19 188744397
pjTaskEnterpriseNumber20 188744398
pjTaskEnterpriseNumber21 188744399
pjTaskEnterpriseNumber22 188744400
pjTaskEnterpriseNumber23 188744401
pjTaskEnterpriseNumber24 188744402
pjTaskEnterpriseNumber25 188744403
pjTaskEnterpriseNumber26 188744404
pjTaskEnterpriseNumber27 188744405
pjTaskEnterpriseNumber28 188744406
pjTaskEnterpriseNumber29 188744407
pjTaskEnterpriseNumber30 188744408
pjTaskEnterpriseNumber31 188744409
pjTaskEnterpriseNumber32 188744410
pjTaskEnterpriseNumber33 188744411
pjTaskEnterpriseNumber34 188744412
pjTaskEnterpriseNumber35 188744413
pjTaskEnterpriseNumber36 188744414
pjTaskEnterpriseNumber37 188744415
pjTaskEnterpriseNumber38 188744416
pjTaskEnterpriseNumber39 188744417
pjTaskEnterpriseNumber40 188744418
pjTaskEnterpriseOutlineCode1 188744419
pjTaskEnterpriseOutlineCode2 188744421
pjTaskEnterpriseOutlineCode3 188744423
pjTaskEnterpriseOutlineCode4 188744425
pjTaskEnterpriseOutlineCode5 188744427
pjTaskEnterpriseOutlineCode6 188744429
pjTaskEnterpriseOutlineCode7 188744431
pjTaskEnterpriseOutlineCode8 188744433
pjTaskEnterpriseOutlineCode9 188744435
pjTaskEnterpriseOutlineCode10 188744437
pjTaskEnterpriseOutlineCode11 188744439
pjTaskEnterpriseOutlineCode12 188744441
pjTaskEnterpriseOutlineCode13 188744443
pjTaskEnterpriseOutlineCode14 188744445
pjTaskEnterpriseOutlineCode15 188744447
pjTaskEnterpriseOutlineCode16 188744449
pjTaskEnterpriseOutlineCode17 188744451
pjTaskEnterpriseOutlineCode18 188744453
pjTaskEnterpriseOutlineCode19 188744455
pjTaskEnterpriseOutlineCode20 188744457
pjTaskEnterpriseOutlineCode21 188744459
pjTaskEnterpriseOutlineCode22 188744461
pjTaskEnterpriseOutlineCode23 188744463
pjTaskEnterpriseOutlineCode24 188744465
pjTaskEnterpriseOutlineCode25 188744467
pjTaskEnterpriseOutlineCode26 188744469
pjTaskEnterpriseOutlineCode27 188744471
pjTaskEnterpriseOutlineCode28 188744473
pjTaskEnterpriseOutlineCode29 188744475
pjTaskEnterpriseOutlineCode30 188744477
pjTaskEnterpriseText1 188744479
pjTaskEnterpriseText2 188744480
pjTaskEnterpriseText3 188744481
pjTaskEnterpriseText4 188744482
pjTaskEnterpriseText5 188744483
pjTaskEnterpriseText6 188744484
pjTaskEnterpriseText7 188744485
pjTaskEnterpriseText8 188744486
pjTaskEnterpriseText9 188744487
pjTaskEnterpriseText10 188744488
pjTaskEnterpriseText11 188744489
pjTaskEnterpriseText12 188744490
pjTaskEnterpriseText13 188744491
pjTaskEnterpriseText14 188744492
pjTaskEnterpriseText15 188744493
pjTaskEnterpriseText16 188744494
pjTaskEnterpriseText17 188744495
pjTaskEnterpriseText18 188744496
pjTaskEnterpriseText19 188744497
pjTaskEnterpriseText20 188744498
pjTaskEnterpriseText21 188744499
pjTaskEnterpriseText22 188744500
pjTaskEnterpriseText23 188744501
pjTaskEnterpriseText24 188744502
pjTaskEnterpriseText25 188744503
pjTaskEnterpriseText26 188744504
pjTaskEnterpriseText27 188744505
pjTaskEnterpriseText28 188744506
pjTaskEnterpriseText29 188744507
pjTaskEnterpriseText30 188744508
pjTaskEnterpriseText31 188744509
pjTaskEnterpriseText32 188744510
pjTaskEnterpriseText33 188744511
pjTaskEnterpriseText34 188744512
pjTaskEnterpriseText35 188744513
pjTaskEnterpriseText36 188744514
pjTaskEnterpriseText37 188744515
pjTaskEnterpriseText38 188744516
pjTaskEnterpriseText39 188744517
pjTaskEnterpriseText40 188744518
pjTaskBaseline1DurationEstimated 188744519
pjTaskBaseline2DurationEstimated 188744520
pjTaskBaseline3DurationEstimated 188744521
pjTaskBaseline4DurationEstimated 188744522
pjTaskBaseline5DurationEstimated 188744523
pjTaskBaseline6DurationEstimated 188744524
pjTaskBaseline7DurationEstimated 188744525
pjTaskBaseline8DurationEstimated 188744526
pjTaskBaseline9DurationEstimated 188744527
pjTaskBaseline10DurationEstimated 188744528
pjTaskEnterpriseProjectCost1 188744529
pjTaskEnterpriseProjectCost2 188744530
pjTaskEnterpriseProjectCost3 188744531
pjTaskEnterpriseProjectCost4 188744532
pjTaskEnterpriseProjectCost5 188744533
pjTaskEnterpriseProjectCost6 188744534
pjTaskEnterpriseProjectCost7 188744535
pjTaskEnterpriseProjectCost8 188744536
pjTaskEnterpriseProjectCost9 188744537
pjTaskEnterpriseProjectCost10 188744538
pjTaskEnterpriseProjectDate1 188744539
pjTaskEnterpriseProjectDate2 188744540
pjTaskEnterpriseProjectDate3 188744541
pjTaskEnterpriseProjectDate4 188744542
pjTaskEnterpriseProjectDate5 188744543
pjTaskEnterpriseProjectDate6 188744544
pjTaskEnterpriseProjectDate7 188744545
pjTaskEnterpriseProjectDate8 188744546
pjTaskEnterpriseProjectDate9 188744547
pjTaskEnterpriseProjectDate10 188744548
pjTaskEnterpriseProjectDate11 188744549
pjTaskEnterpriseProjectDate12 188744550
pjTaskEnterpriseProjectDate13 188744551
pjTaskEnterpriseProjectDate14 188744552
pjTaskEnterpriseProjectDate15 188744553
pjTaskEnterpriseProjectDate16 188744554
pjTaskEnterpriseProjectDate17 188744555
pjTaskEnterpriseProjectDate18 188744556
pjTaskEnterpriseProjectDate19 188744557
pjTaskEnterpriseProjectDate20 188744558
pjTaskEnterpriseProjectDate21 188744559
pjTaskEnterpriseProjectDate22 188744560
pjTaskEnterpriseProjectDate23 188744561
pjTaskEnterpriseProjectDate24 188744562
pjTaskEnterpriseProjectDate25 188744563
pjTaskEnterpriseProjectDate26 188744564
pjTaskEnterpriseProjectDate27 188744565
pjTaskEnterpriseProjectDate28 188744566
pjTaskEnterpriseProjectDate29 188744567
pjTaskEnterpriseProjectDate30 188744568
pjTaskEnterpriseProjectDuration1 188744569
pjTaskEnterpriseProjectDuration2 188744570
pjTaskEnterpriseProjectDuration3 188744571
pjTaskEnterpriseProjectDuration4 188744572
pjTaskEnterpriseProjectDuration5 188744573
pjTaskEnterpriseProjectDuration6 188744574
pjTaskEnterpriseProjectDuration7 188744575
pjTaskEnterpriseProjectDuration8 188744576
pjTaskEnterpriseProjectDuration9 188744577
pjTaskEnterpriseProjectDuration10 188744578
pjTaskEnterpriseProjectOutlineCode1 188744589
pjTaskEnterpriseProjectOutlineCode2 188744590
pjTaskEnterpriseProjectOutlineCode3 188744591
pjTaskEnterpriseProjectOutlineCode4 188744592
pjTaskEnterpriseProjectOutlineCode5 188744593
pjTaskEnterpriseProjectOutlineCode6 188744594
pjTaskEnterpriseProjectOutlineCode7 188744595
pjTaskEnterpriseProjectOutlineCode8 188744596
pjTaskEnterpriseProjectOutlineCode9 188744597
pjTaskEnterpriseProjectOutlineCode10 188744598
pjTaskEnterpriseProjectOutlineCode11 188744599
pjTaskEnterpriseProjectOutlineCode12 188744600
pjTaskEnterpriseProjectOutlineCode13 188744601
pjTaskEnterpriseProjectOutlineCode14 188744602
pjTaskEnterpriseProjectOutlineCode15 188744603
pjTaskEnterpriseProjectOutlineCode16 188744604
pjTaskEnterpriseProjectOutlineCode17 188744605
pjTaskEnterpriseProjectOutlineCode18 188744606
pjTaskEnterpriseProjectOutlineCode19 188744607
pjTaskEnterpriseProjectOutlineCode20 188744608
pjTaskEnterpriseProjectOutlineCode21 188744609
pjTaskEnterpriseProjectOutlineCode22 188744610
pjTaskEnterpriseProjectOutlineCode23 188744611
pjTaskEnterpriseProjectOutlineCode24 188744612
pjTaskEnterpriseProjectOutlineCode25 188744613
pjTaskEnterpriseProjectOutlineCode26 188744614
pjTaskEnterpriseProjectOutlineCode27 188744615
pjTaskEnterpriseProjectOutlineCode28 188744616
pjTaskEnterpriseProjectOutlineCode29 188744617
pjTaskEnterpriseProjectOutlineCode30 188744618
pjTaskEnterpriseProjectFlag1 188744649
pjTaskEnterpriseProjectFlag2 188744650
pjTaskEnterpriseProjectFlag3 188744651
pjTaskEnterpriseProjectFlag4 188744652
pjTaskEnterpriseProjectFlag5 188744653
pjTaskEnterpriseProjectFlag6 188744654
pjTaskEnterpriseProjectFlag7 188744655
pjTaskEnterpriseProjectFlag8 188744656
pjTaskEnterpriseProjectFlag9 188744657
pjTaskEnterpriseProjectFlag10 188744658
pjTaskEnterpriseProjectFlag11 188744659
pjTaskEnterpriseProjectFlag12 188744660
pjTaskEnterpriseProjectFlag13 188744661
pjTaskEnterpriseProjectFlag14 188744662
pjTaskEnterpriseProjectFlag15 188744663
pjTaskEnterpriseProjectFlag16 188744664
pjTaskEnterpriseProjectFlag17 188744665
pjTaskEnterpriseProjectFlag18 188744666
pjTaskEnterpriseProjectFlag19 188744667
pjTaskEnterpriseProjectFlag20 188744668
pjTaskEnterpriseProjectNumber1 188744689
pjTaskEnterpriseProjectNumber2 188744690
pjTaskEnterpriseProjectNumber3 188744691
pjTaskEnterpriseProjectNumber4 188744692
pjTaskEnterpriseProjectNumber5 188744693
pjTaskEnterpriseProjectNumber6 188744694
pjTaskEnterpriseProjectNumber7 188744695
pjTaskEnterpriseProjectNumber8 188744696
pjTaskEnterpriseProjectNumber9 188744697
pjTaskEnterpriseProjectNumber10 188744698
pjTaskEnterpriseProjectNumber11 188744699
pjTaskEnterpriseProjectNumber12 188744700
pjTaskEnterpriseProjectNumber13 188744701
pjTaskEnterpriseProjectNumber14 188744702
pjTaskEnterpriseProjectNumber15 188744703
pjTaskEnterpriseProjectNumber16 188744704
pjTaskEnterpriseProjectNumber17 188744705
pjTaskEnterpriseProjectNumber18 188744706
pjTaskEnterpriseProjectNumber19 188744707
pjTaskEnterpriseProjectNumber20 188744708
pjTaskEnterpriseProjectNumber21 188744709
pjTaskEnterpriseProjectNumber22 188744710
pjTaskEnterpriseProjectNumber23 188744711
pjTaskEnterpriseProjectNumber24 188744712
pjTaskEnterpriseProjectNumber25 188744713
pjTaskEnterpriseProjectNumber26 188744714
pjTaskEnterpriseProjectNumber27 188744715
pjTaskEnterpriseProjectNumber28 188744716
pjTaskEnterpriseProjectNumber29 188744717
pjTaskEnterpriseProjectNumber30 188744718
pjTaskEnterpriseProjectNumber31 188744719
pjTaskEnterpriseProjectNumber32 188744720
pjTaskEnterpriseProjectNumber33 188744721
pjTaskEnterpriseProjectNumber34 188744722
pjTaskEnterpriseProjectNumber35 188744723
pjTaskEnterpriseProjectNumber36 188744724
pjTaskEnterpriseProjectNumber37 188744725
pjTaskEnterpriseProjectNumber38 188744726
pjTaskEnterpriseProjectNumber39 188744727
pjTaskEnterpriseProjectNumber40 188744728
pjTaskEnterpriseProjectText1 188744729
pjTaskEnterpriseProjectText2 188744730
pjTaskEnterpriseProjectText3 188744731
pjTaskEnterpriseProjectText4 188744732
pjTaskEnterpriseProjectText5 188744733
pjTaskEnterpriseProjectText6 188744734
pjTaskEnterpriseProjectText7 188744735
pjTaskEnterpriseProjectText8 188744736
pjTaskEnterpriseProjectText9 188744737
pjTaskEnterpriseProjectText10 188744738
pjTaskEnterpriseProjectText11 188744739
pjTaskEnterpriseProjectText12 188744740
pjTaskEnterpriseProjectText13 188744741
pjTaskEnterpriseProjectText14 188744742
pjTaskEnterpriseProjectText15 188744743
pjTaskEnterpriseProjectText16 188744744
pjTaskEnterpriseProjectText17 188744745
pjTaskEnterpriseProjectText18 188744746
pjTaskEnterpriseProjectText19 188744747
pjTaskEnterpriseProjectText20 188744748
pjTaskEnterpriseProjectText21 188744749
pjTaskEnterpriseProjectText22 188744750
pjTaskEnterpriseProjectText23 188744751
pjTaskEnterpriseProjectText24 188744752
pjTaskEnterpriseProjectText25 188744753
pjTaskEnterpriseProjectText26 188744754
pjTaskEnterpriseProjectText27 188744755
pjTaskEnterpriseProjectText28 188744756
pjTaskEnterpriseProjectText29 188744757
pjTaskEnterpriseProjectText30 188744758
pjTaskEnterpriseProjectText31 188744759
pjTaskEnterpriseProjectText32 188744760
pjTaskEnterpriseProjectText33 188744761
pjTaskEnterpriseProjectText34 188744762
pjTaskEnterpriseProjectText35 188744763
pjTaskEnterpriseProjectText36 188744764
pjTaskEnterpriseProjectText37 188744765
pjTaskEnterpriseProjectText38 188744766
pjTaskEnterpriseProjectText39 188744767
pjTaskEnterpriseProjectText40 188744768
pjTaskResourceEnterpriseOutlineCode1 188744769
pjTaskResourceEnterpriseOutlineCode2 188744770
pjTaskResourceEnterpriseOutlineCode3 188744771
pjTaskResourceEnterpriseOutlineCode4 188744772
pjTaskResourceEnterpriseOutlineCode5 188744773
pjTaskResourceEnterpriseOutlineCode6 188744774
pjTaskResourceEnterpriseOutlineCode7 188744775
pjTaskResourceEnterpriseOutlineCode8 188744776
pjTaskResourceEnterpriseOutlineCode9 188744777
pjTaskResourceEnterpriseOutlineCode10 188744778
pjTaskResourceEnterpriseOutlineCode11 188744779
pjTaskResourceEnterpriseOutlineCode12 188744780
pjTaskResourceEnterpriseOutlineCode13 188744781
pjTaskResourceEnterpriseOutlineCode14 188744782
pjTaskResourceEnterpriseOutlineCode15 188744783
pjTaskResourceEnterpriseOutlineCode16 188744784
pjTaskResourceEnterpriseOutlineCode17 188744785
pjTaskResourceEnterpriseOutlineCode18 188744786
pjTaskResourceEnterpriseOutlineCode19 188744787
pjTaskResourceEnterpriseOutlineCode20 188744788
pjTaskResourceEnterpriseOutlineCode21 188744789
pjTaskResourceEnterpriseOutlineCode22 188744790
pjTaskResourceEnterpriseOutlineCode23 188744791
pjTaskResourceEnterpriseOutlineCode24 188744792
pjTaskResourceEnterpriseOutlineCode25 188744793
pjTaskResourceEnterpriseOutlineCode26 188744794
pjTaskResourceEnterpriseOutlineCode27 188744795
pjTaskResourceEnterpriseOutlineCode28 188744796
pjTaskResourceEnterpriseOutlineCode29 188744797
pjTaskResourceEnterpriseRBS 188744798
pjTaskPhysicalPercentComplete 188744799
pjTaskDemandedRequested 188744800
pjTaskStatusIndicator 188744801
pjTaskEarnedValueMethod 188744802
pjTaskResourceEnterpriseMultiValueCode20 188744809
pjTaskResourceEnterpriseMultiValueCode21 188744810
pjTaskResourceEnterpriseMultiValueCode22 188744811
pjTaskResourceEnterpriseMultiValueCode23 188744812
pjTaskResourceEnterpriseMultiValueCode24 188744813
pjTaskResourceEnterpriseMultiValueCode25 188744814
pjTaskResourceEnterpriseMultiValueCode26 188744815
pjTaskResourceEnterpriseMultiValueCode27 188744816
pjTaskResourceEnterpriseMultiValueCode28 188744817
pjTaskResourceEnterpriseMultiValueCode29 188744818
pjTaskActualWorkProtected 188744819
pjTaskActualOvertimeWorkProtected 188744820
pjTaskGuid 188744823
pjTaskCalendarGuid 188744824
pjTaskDeliverableGuid 188744826
pjTaskDeliverableType 188744827
pjTaskDeliverableStart 188744832
pjTaskDeliverableFinish 188744833
pjTaskIsPublished 188744845
pjTaskStatusManagerName 188744846
pjTaskErrorMessage 188744847
pjTaskBudgetWork 188744851
pjTaskBudgetCost 188744852
pjTaskBaselineFixedCostAccrual 188744853
pjTaskBaselineDeliverableStart 188744854
pjTaskBaselineDeliverableFinish 188744855
pjTaskBaselineBudgetWork 188744856
pjTaskBaselineBudgetCost 188744857
pjTaskBaseline1FixedCostAccrual 188744860
pjTaskBaseline1DeliverableStart 188744861
pjTaskBaseline1DeliverableFinish 188744862
pjTaskBaseline1BudgetWork 188744863
pjTaskBaseline1BudgetCost 188744864
pjTaskBaseline2FixedCostAccrual 188744867
pjTaskBaseline2DeliverableStart 188744868
pjTaskBaseline2DeliverableFinish 188744869
pjTaskBaseline2BudgetWork 188744870
pjTaskBaseline2BudgetCost 188744871
pjTaskBaseline3FixedCostAccrual 188744874
pjTaskBaseline3DeliverableStart 188744875
pjTaskBaseline3DeliverableFinish 188744876
pjTaskBaseline3BudgetWork 188744877
pjTaskBaseline3BudgetCost 188744878
pjTaskBaseline4FixedCostAccrual 188744881
pjTaskBaseline4DeliverableStart 188744882
pjTaskBaseline4DeliverableFinish 188744883
pjTaskBaseline4BudgetWork 188744884
pjTaskBaseline4BudgetCost 188744885
pjTaskBaseline5FixedCostAccrual 188744888
pjTaskBaseline5DeliverableStart 188744889
pjTaskBaseline5DeliverableFinish 188744890
pjTaskBaseline5BudgetWork 188744891
pjTaskBaseline5BudgetCost 188744892
pjTaskBaseline6FixedCostAccrual 188744895
pjTaskBaseline6DeliverableStart 188744896
pjTaskBaseline6DeliverableFinish 188744897
pjTaskBaseline6BudgetWork 188744898
pjTaskBaseline6BudgetCost 188744899
pjTaskBaseline7FixedCostAccrual 188744902
pjTaskBaseline7DeliverableStart 188744903
pjTaskBaseline7DeliverableFinish 188744904
pjTaskBaseline7BudgetWork 188744905
pjTaskBaseline7BudgetCost 188744906
pjTaskBaseline8FixedCostAccrual 188744909
pjTaskBaseline8DeliverableStart 188744910
pjTaskBaseline8DeliverableFinish 188744911
pjTaskBaseline8BudgetWork 188744912
pjTaskBaseline8BudgetCost 188744913
pjTaskBaseline9FixedCostAccrual 188744916
pjTaskBaseline9DeliverableStart 188744917
pjTaskBaseline9DeliverableFinish 188744918
pjTaskBaseline9BudgetWork 188744919
pjTaskBaseline9BudgetCost 188744920
pjTaskBaseline10FixedCostAccrual 188744923
pjTaskBaseline10DeliverableStart 188744924
pjTaskBaseline10DeliverableFinish 188744925
pjTaskBaseline10BudgetWork 188744926
pjTaskBaseline10BudgetCost 188744927
pjTaskRecalcFlags 188744930
pjTaskDeliverableName 188744956
pjTaskActive 188744959
pjTaskManual 188744960
pjTaskPlaceholder 188744961
pjTaskWarning 188744962
pjTaskStartText 188744965
pjTaskFinishText 188744966
pjTaskDurationText 188744967
pjTaskIsStartValid 188744975
pjTaskIsFinishValid 188744976
pjTaskIsDurationValid 188744977
pjTaskBaselineStartText 188744979
pjTaskBaselineFinishText 188744980
pjTaskBaselineDurationText 188744981
pjTaskBaseline1StartText 188744982
pjTaskBaseline1FinishText 188744983
pjTaskBaseline1DurationText 188744984
pjTaskBaseline2StartText 188744985
pjTaskBaseline2FinishText 188744986
pjTaskBaseline2DurationText 188744987
pjTaskBaseline3StartText 188744988
pjTaskBaseline3FinishText 188744989
pjTaskBaseline3DurationText 188744990
pjTaskBaseline4StartText 188744991
pjTaskBaseline4FinishText 188744992
pjTaskBaseline4DurationText 188744993
pjTaskBaseline5StartText 188744994
pjTaskBaseline5FinishText 188744995
pjTaskBaseline5DurationText 188744996
pjTaskBaseline6StartText 188744997
pjTaskBaseline6FinishText 188744998
pjTaskBaseline6DurationText 188744999
pjTaskBaseline7StartText 188745000
pjTaskBaseline7FinishText 188745001
pjTaskBaseline7DurationText 188745002
pjTaskBaseline8StartText 188745003
pjTaskBaseline8FinishText 188745004
pjTaskBaseline8DurationText 188745005
pjTaskBaseline9StartText 188745006
pjTaskBaseline9FinishText 188745007
pjTaskBaseline9DurationText 188745008
pjTaskBaseline10StartText 188745009
pjTaskBaseline10FinishText 188745010
pjTaskBaseline10DurationText 188745011
pjTaskIgnoreWarnings 188745012
pjTaskAssignmentPeakUnits 188745015
pjTaskScheduledStart 188745018
pjTaskScheduledFinish 188745019
pjTaskScheduledDuration 188745020
pjTaskPathDrivingPredecessor 188745061
pjTaskPathPredecessor 188745062
pjTaskPathDrivenSuccessor 188745063
pjTaskPathSuccessor 188745064
pjResourceID 205520896
pjResourceName 205520897
pjResourceInitials 205520898
pjResourceGroup 205520899
pjResourceMaxUnits 205520900
pjResourceBaseCalendar 205520901
pjResourceStandardRate 205520902
pjResourceOvertimeRate 205520903
pjResourceText1 205520904
pjResourceText2 205520905
pjResourceCode 205520906
pjResourceActualCost 205520907
pjResourceCost 205520908
pjResourceWork 205520909
pjResourceActualWork 205520910
pjResourceBaselineWork 205520911
pjResourceOvertimeWork 205520912
pjResourceBaselineCost 205520913
pjResourceCostPerUse 205520914
pjResourceAccrueAt 205520915
pjResourceNotes 205520916
pjResourceRemainingCost 205520917
pjResourceRemainingWork 205520918
pjResourceWorkVariance 205520919
pjResourceCostVariance 205520920
pjResourceOverallocated 205520921
pjResourcePeakUnits 205520922
pjResourceUniqueID 205520923
pjResourceSheetNotes 205520924
pjResourcePercentWorkComplete 205520925
pjResourceText3 205520926
pjResourceText4 205520927
pjResourceText5 205520928
pjResourceObjects 205520929
pjResourceLinkedFields 205520930
pjResourceEMailAddress 205520931
pjResourceRegularWork 205520934
pjResourceActualOvertimeWork 205520935
pjResourceRemainingOvertimeWork 205520936
pjResourceOvertimeCost 205520943
pjResourceActualOvertimeCost 205520944
pjResourceRemainingOvertimeCost 205520945
pjResourceBCWS 205520947
pjResourceBCWP 205520948
pjResourceACWP 205520949
pjResourceSV 205520950
pjResourceAvailableFrom 205520953
pjResourceAvailableTo 205520954
pjResourceIndicators 205520982
pjResourceText6 205520993
pjResourceText7 205520994
pjResourceText8 205520995
pjResourceText9 205520996
pjResourceText10 205520997
pjResourceStart1 205520998
pjResourceStart2 205520999
pjResourceStart3 205521000
pjResourceStart4 205521001
pjResourceStart5 205521002
pjResourceFinish1 205521003
pjResourceFinish2 205521004
pjResourceFinish3 205521005
pjResourceFinish4 205521006
pjResourceFinish5 205521007
pjResourceNumber1 205521008
pjResourceNumber2 205521009
pjResourceNumber3 205521010
pjResourceNumber4 205521011
pjResourceNumber5 205521012
pjResourceDuration1 205521013
pjResourceDuration2 205521014
pjResourceDuration3 205521015
pjResourceCost1 205521019
pjResourceCost2 205521020
pjResourceCost3 205521021
pjResourceFlag10 205521022
pjResourceFlag1 205521023
pjResourceFlag2 205521024
pjResourceFlag3 205521025
pjResourceFlag4 205521026
pjResourceFlag5 205521027
pjResourceFlag6 205521028
pjResourceFlag7 205521029
pjResourceFlag8 205521030
pjResourceFlag9 205521031
205521034
pjResourceHyperlinkAddress 205521035
pjResourceHyperlinkSubAddress 205521036
pjResourceHyperlinkHref 205521037
pjResourceIsAssignment 205521040
pjResourceTaskSummaryName 205521055
pjResourceCanLevel 205521059
pjResourceWorkContour 205521060
pjResourceCost4 205521062
pjResourceCost5 205521063
pjResourceCost6 205521064
pjResourceCost7 205521065
pjResourceCost8 205521066
pjResourceCost9 205521067
pjResourceCost10 205521068
pjResourceDate1 205521069
pjResourceDate2 205521070
pjResourceDate3 205521071
pjResourceDate4 205521072
pjResourceDate5 205521073
pjResourceDate6 205521074
pjResourceDate7 205521075
pjResourceDate8 205521076
pjResourceDate9 205521077
pjResourceDate10 205521078
pjResourceDuration4 205521079
pjResourceDuration5 205521080
pjResourceDuration6 205521081
pjResourceDuration7 205521082
pjResourceDuration8 205521083
pjResourceDuration9 205521084
pjResourceDuration10 205521085
pjResourceFinish6 205521086
pjResourceFinish7 205521087
pjResourceFinish8 205521088
pjResourceFinish9 205521089
pjResourceFinish10 205521090
pjResourceFlag11 205521091
pjResourceFlag12 205521092
pjResourceFlag13 205521093
pjResourceFlag14 205521094
pjResourceFlag15 205521095
pjResourceFlag16 205521096
pjResourceFlag17 205521097
pjResourceFlag18 205521098
pjResourceFlag19 205521099
pjResourceFlag20 205521100
pjResourceNumber6 205521101
pjResourceNumber7 205521102
pjResourceNumber8 205521103
pjResourceNumber9 205521104
pjResourceNumber10 205521105
pjResourceNumber11 205521106
pjResourceNumber12 205521107
pjResourceNumber13 205521108
pjResourceNumber14 205521109
pjResourceNumber15 205521110
pjResourceNumber16 205521111
pjResourceNumber17 205521112
pjResourceNumber18 205521113
pjResourceNumber19 205521114
pjResourceNumber20 205521115
pjResourceStart6 205521116
pjResourceStart7 205521117
pjResourceStart8 205521118
pjResourceStart9 205521119
pjResourceStart10 205521120
pjResourceText11 205521121
pjResourceText12 205521122
pjResourceText13 205521123
pjResourceText14 205521124
pjResourceText15 205521125
pjResourceText16 205521126
pjResourceText17 205521127
pjResourceText18 205521128
pjResourceText19 205521129
pjResourceText20 205521130
pjResourceText21 205521131
pjResourceText22 205521132
pjResourceText23 205521133
pjResourceText24 205521134
pjResourceText25 205521135
pjResourceText26 205521136
pjResourceText27 205521137
pjResourceText28 205521138
pjResourceText29 205521139
pjResourceText30 205521140
pjResourcePhonetics 205521148
pjResourceIndex 205521149
pjResourceAssignmentDelay 205521153
pjResourceAssignmentUnits 205521154
pjResourceBaselineStart 205521155
pjResourceBaselineFinish 205521156
pjResourceConfirmed 205521157
pjResourceFinish 205521158
pjResourceLevelingDelay 205521159
pjResourceResponsePending 205521160
pjResourceStart 205521161
pjResourceTeamStatusPending 205521162
pjResourceUpdateNeeded 205521163
pjResourceCV 205521164
pjResourceCostRateTable 205521165
pjResourceWorkgroup 205521168
pjResourceProject 205521169
pjResourceOutlineCode1 205521174
pjResourceOutlineCode2 205521176
pjResourceOutlineCode3 205521178
pjResourceOutlineCode4 205521180
pjResourceOutlineCode5 205521182
pjResourceOutlineCode6 205521184
pjResourceOutlineCode7 205521186
pjResourceOutlineCode8 205521188
pjResourceOutlineCode9 205521190
pjResourceOutlineCode10 205521192
pjResourceMaterialLabel 205521195
pjResourceType 205521196
pjResourceVAC 205521197
pjResourceGroupbySummary 205521202
pjResourceWindowsUserAccount 205521207
pjResourceHyperlinkScreenTip 205521208
pjResourceWBS 205521236
pjResourceBaseline1Work 205521238
pjResourceBaseline1Cost 205521239
pjResourceBaseline1Start 205521244
pjResourceBaseline1Finish 205521245
pjResourceBaseline2Work 205521248
pjResourceBaseline2Cost 205521249
pjResourceBaseline2Start 205521254
pjResourceBaseline2Finish 205521255
pjResourceBaseline3Work 205521258
pjResourceBaseline3Cost 205521259
pjResourceBaseline3Start 205521264
pjResourceBaseline3Finish 205521265
pjResourceBaseline4Work 205521268
pjResourceBaseline4Cost 205521269
pjResourceBaseline4Start 205521274
pjResourceBaseline4Finish 205521275
pjResourceBaseline5Work 205521278
pjResourceBaseline5Cost 205521279
pjResourceBaseline5Start 205521284
pjResourceBaseline5Finish 205521285
pjResourceBaseline6Work 205521288
pjResourceBaseline6Cost 205521289
pjResourceBaseline6Start 205521294
pjResourceBaseline6Finish 205521295
pjResourceBaseline7Work 205521298
pjResourceBaseline7Cost 205521299
pjResourceBaseline7Start 205521304
pjResourceBaseline7Finish 205521305
pjResourceBaseline8Work 205521308
pjResourceBaseline8Cost 205521309
pjResourceBaseline8Start 205521314
pjResourceBaseline8Finish 205521315
pjResourceBaseline9Work 205521318
pjResourceBaseline9Cost 205521319
pjResourceBaseline9Start 205521324
pjResourceBaseline9Finish 205521325
pjResourceBaseline10Work 205521328
pjResourceBaseline10Cost 205521329
pjResourceBaseline10Start 205521334
pjResourceBaseline10Finish 205521335
pjResourceEnterpriseUniqueID 205521339
pjResourceEnterpriseCost1 205521342
pjResourceEnterpriseCost2 205521343
pjResourceEnterpriseCost3 205521344
pjResourceEnterpriseCost4 205521345
pjResourceEnterpriseCost5 205521346
pjResourceEnterpriseCost6 205521347
pjResourceEnterpriseCost7 205521348
pjResourceEnterpriseCost8 205521349
pjResourceEnterpriseCost9 205521350
pjResourceEnterpriseCost10 205521351
pjResourceEnterpriseDate1 205521352
pjResourceEnterpriseDate2 205521353
pjResourceEnterpriseDate3 205521354
pjResourceEnterpriseDate4 205521355
pjResourceEnterpriseDate5 205521356
pjResourceEnterpriseDate6 205521357
pjResourceEnterpriseDate7 205521358
pjResourceEnterpriseDate8 205521359
pjResourceEnterpriseDate9 205521360
pjResourceEnterpriseDate10 205521361
pjResourceEnterpriseDate11 205521362
pjResourceEnterpriseDate12 205521363
pjResourceEnterpriseDate13 205521364
pjResourceEnterpriseDate14 205521365
pjResourceEnterpriseDate15 205521366
pjResourceEnterpriseDate16 205521367
pjResourceEnterpriseDate17 205521368
pjResourceEnterpriseDate18 205521369
pjResourceEnterpriseDate19 205521370
pjResourceEnterpriseDate20 205521371
pjResourceEnterpriseDate21 205521372
pjResourceEnterpriseDate22 205521373
pjResourceEnterpriseDate23 205521374
pjResourceEnterpriseDate24 205521375
pjResourceEnterpriseDate25 205521376
pjResourceEnterpriseDate26 205521377
pjResourceEnterpriseDate27 205521378
pjResourceEnterpriseDate28 205521379
pjResourceEnterpriseDate29 205521380
pjResourceEnterpriseDate30 205521381
pjResourceEnterpriseDuration1 205521382
pjResourceEnterpriseDuration2 205521383
pjResourceEnterpriseDuration3 205521384
pjResourceEnterpriseDuration4 205521385
pjResourceEnterpriseDuration5 205521386
pjResourceEnterpriseDuration6 205521387
pjResourceEnterpriseDuration7 205521388
pjResourceEnterpriseDuration8 205521389
pjResourceEnterpriseDuration9 205521390
pjResourceEnterpriseDuration10 205521391
pjResourceEnterpriseFlag1 205521402
pjResourceEnterpriseFlag2 205521403
pjResourceEnterpriseFlag3 205521404
pjResourceEnterpriseFlag4 205521405
pjResourceEnterpriseFlag5 205521406
pjResourceEnterpriseFlag6 205521407
pjResourceEnterpriseFlag7 205521408
pjResourceEnterpriseFlag8 205521409
pjResourceEnterpriseFlag9 205521410
pjResourceEnterpriseFlag10 205521411
pjResourceEnterpriseFlag11 205521412
pjResourceEnterpriseFlag12 205521413
pjResourceEnterpriseFlag13 205521414
pjResourceEnterpriseFlag14 205521415
pjResourceEnterpriseFlag15 205521416
pjResourceEnterpriseFlag16 205521417
pjResourceEnterpriseFlag17 205521418
pjResourceEnterpriseFlag18 205521419
pjResourceEnterpriseFlag19 205521420
pjResourceEnterpriseFlag20 205521421
pjResourceEnterpriseNumber1 205521442
pjResourceEnterpriseNumber2 205521443
pjResourceEnterpriseNumber3 205521444
pjResourceEnterpriseNumber4 205521445
pjResourceEnterpriseNumber5 205521446
pjResourceEnterpriseNumber6 205521447
pjResourceEnterpriseNumber7 205521448
pjResourceEnterpriseNumber8 205521449
pjResourceEnterpriseNumber9 205521450
pjResourceEnterpriseNumber10 205521451
pjResourceEnterpriseNumber11 205521452
pjResourceEnterpriseNumber12 205521453
pjResourceEnterpriseNumber13 205521454
pjResourceEnterpriseNumber14 205521455
pjResourceEnterpriseNumber15 205521456
pjResourceEnterpriseNumber16 205521457
pjResourceEnterpriseNumber17 205521458
pjResourceEnterpriseNumber18 205521459
pjResourceEnterpriseNumber19 205521460
pjResourceEnterpriseNumber20 205521461
pjResourceEnterpriseNumber21 205521462
pjResourceEnterpriseNumber22 205521463
pjResourceEnterpriseNumber23 205521464
pjResourceEnterpriseNumber24 205521465
pjResourceEnterpriseNumber25 205521466
pjResourceEnterpriseNumber26 205521467
pjResourceEnterpriseNumber27 205521468
pjResourceEnterpriseNumber28 205521469
pjResourceEnterpriseNumber29 205521470
pjResourceEnterpriseNumber30 205521471
pjResourceEnterpriseNumber31 205521472
pjResourceEnterpriseNumber32 205521473
pjResourceEnterpriseNumber33 205521474
pjResourceEnterpriseNumber34 205521475
pjResourceEnterpriseNumber35 205521476
pjResourceEnterpriseNumber36 205521477
pjResourceEnterpriseNumber37 205521478
pjResourceEnterpriseNumber38 205521479
pjResourceEnterpriseNumber39 205521480
pjResourceEnterpriseNumber40 205521481
pjResourceEnterpriseOutlineCode1 205521482
pjResourceEnterpriseOutlineCode2 205521484
pjResourceEnterpriseOutlineCode3 205521486
pjResourceEnterpriseOutlineCode4 205521488
pjResourceEnterpriseOutlineCode5 205521490
pjResourceEnterpriseOutlineCode6 205521492
pjResourceEnterpriseOutlineCode7 205521494
pjResourceEnterpriseOutlineCode8 205521496
pjResourceEnterpriseOutlineCode9 205521498
pjResourceEnterpriseOutlineCode10 205521500
pjResourceEnterpriseOutlineCode11 205521502
pjResourceEnterpriseOutlineCode12 205521504
pjResourceEnterpriseOutlineCode13 205521506
pjResourceEnterpriseOutlineCode14 205521508
pjResourceEnterpriseOutlineCode15 205521510
pjResourceEnterpriseOutlineCode16 205521512
pjResourceEnterpriseOutlineCode17 205521514
pjResourceEnterpriseOutlineCode18 205521516
pjResourceEnterpriseOutlineCode19 205521518
pjResourceEnterpriseOutlineCode20 205521520
pjResourceEnterpriseOutlineCode21 205521522
pjResourceEnterpriseOutlineCode22 205521524
pjResourceEnterpriseOutlineCode23 205521526
pjResourceEnterpriseOutlineCode24 205521528
pjResourceEnterpriseOutlineCode25 205521530
pjResourceEnterpriseOutlineCode26 205521532
pjResourceEnterpriseOutlineCode27 205521534
pjResourceEnterpriseOutlineCode28 205521536
pjResourceEnterpriseOutlineCode29 205521538
pjResourceEnterpriseRBS 205521540
pjResourceEnterpriseText1 205521542
pjResourceEnterpriseText2 205521543
pjResourceEnterpriseText3 205521544
pjResourceEnterpriseText4 205521545
pjResourceEnterpriseText5 205521546
pjResourceEnterpriseText6 205521547
pjResourceEnterpriseText7 205521548
pjResourceEnterpriseText8 205521549
pjResourceEnterpriseText9 205521550
pjResourceEnterpriseText10 205521551
pjResourceEnterpriseText11 205521552
pjResourceEnterpriseText12 205521553
pjResourceEnterpriseText13 205521554
pjResourceEnterpriseText14 205521555
pjResourceEnterpriseText15 205521556
pjResourceEnterpriseText16 205521557
pjResourceEnterpriseText17 205521558
pjResourceEnterpriseText18 205521559
pjResourceEnterpriseText19 205521560
pjResourceEnterpriseText20 205521561
pjResourceEnterpriseText21 205521562
pjResourceEnterpriseText22 205521563
pjResourceEnterpriseText23 205521564
pjResourceEnterpriseText24 205521565
pjResourceEnterpriseText25 205521566
pjResourceEnterpriseText26 205521567
pjResourceEnterpriseText27 205521568
pjResourceEnterpriseText28 205521569
pjResourceEnterpriseText29 205521570
pjResourceEnterpriseText30 205521571
pjResourceEnterpriseText31 205521572
pjResourceEnterpriseText32 205521573
pjResourceEnterpriseText33 205521574
pjResourceEnterpriseText34 205521575
pjResourceEnterpriseText35 205521576
pjResourceEnterpriseText36 205521577
pjResourceEnterpriseText37 205521578
pjResourceEnterpriseText38 205521579
pjResourceEnterpriseText39 205521580
pjResourceEnterpriseText40 205521581
pjResourceEnterpriseGeneric 205521582
pjResourceEnterpriseBaseCalendar 205521583
pjResourceEnterpriseRequiredValues 205521584
pjResourceEnterpriseNameUsed 205521585
pjResourceDemandedRequested 205521586
pjResourceEnterprise 205521587
pjResourceEnterpriseIsCheckedOut 205521588
pjResourceEnterpriseCheckedOutBy 205521589
pjResourceEnterpriseLastModifiedDate 205521590
pjResourceEnterpriseTeamMember 205521591
pjResourceEnterpriseInactive 205521592
pjResourceBookingType 205521595
pjResourceEnterpriseMultiValue20 205521596
pjResourceEnterpriseMultiValue21 205521598
pjResourceEnterpriseMultiValue22 205521600
pjResourceEnterpriseMultiValue23 205521602
pjResourceEnterpriseMultiValue24 205521604
pjResourceEnterpriseMultiValue25 205521606
pjResourceEnterpriseMultiValue26 205521608
pjResourceEnterpriseMultiValue27 205521610
pjResourceEnterpriseMultiValue28 205521612
pjResourceEnterpriseMultiValue29 205521614
pjResourceActualWorkProtected 205521616
pjResourceActualOvertimeWorkProtected 205521617
pjResourceCreated 205521622
pjResourceGuid 205521624
pjResourceCalendarGuid 205521625
pjResourceErrorMessage 205521634
pjResourceDefaultAssignmentOwner 205521636
pjResourceBudget 205521648
pjResourceBudgetWork 205521649
pjResourceBudgetCost 205521650
pjImportResource 205521651
pjResourceBaselineBudgetWork 205521652
pjResourceBaselineBudgetCost 205521653
pjResourceBaseline1BudgetWork 205521656
pjResourceBaseline1BudgetCost 205521657
pjResourceBaseline2BudgetWork 205521660
pjResourceBaseline2BudgetCost 205521661
pjResourceBaseline3BudgetWork 205521664
pjResourceBaseline3BudgetCost 205521665
pjResourceBaseline4BudgetWork 205521668
pjResourceBaseline4BudgetCost 205521669
pjResourceBaseline5BudgetWork 205521672
pjResourceBaseline5BudgetCost 205521673
pjResourceBaseline6BudgetWork 205521676
pjResourceBaseline6BudgetCost 205521677
pjResourceBaseline7BudgetWork 205521680
pjResourceBaseline7BudgetCost 205521681
pjResourceBaseline8BudgetWork 205521684
pjResourceBaseline8BudgetCost 205521685
pjResourceBaseline9BudgetWork 205521688
pjResourceBaseline9BudgetCost 205521689
pjResourceBaseline10BudgetWork 205521692
pjResourceBaseline10BudgetCost 205521693
pjResourceIsTeam 205521696
pjResourceCostCenter 205521697

Applies to