Modifica

Condividi tramite


_MSProject.DocSize(Object, Object, Object) Method

Definition

public bool DocSize (object Width, object Height, object Points);
abstract member DocSize : obj * obj * obj -> bool
Public Function DocSize (Optional Width As Object, Optional Height As Object, Optional Points As Object) As Boolean

Parameters

Width
Object
Height
Object
Points
Object

Returns

Applies to