This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist. Please see the patterns & practices guidance for the most current information.

Ff650702.DesSynchronization(en-us,PandP.10).png

Version 1.0.0

GotDotNet community for collaboration on this pattern

Complete List of patterns & practices

Context

You are about to design a replication between a source and a target, as described in Master-Master Replication. Your requirements are:

The replication set is updateable at either end of the replication.

Updates need to be transmitted to the other party.

Conflicts need to be detected and resolved at defined points in time, following defined data integrity rules.

Potential conflicts in the changes are to be resolved at the row level.

Note: This pattern uses relational database terms to discuss the solution, but the solution will work in other contexts. The pattern also assumes the existence of relational database management system (RDBMS) services, such as change logging.

Problem

How do you design a replication to transmit data from the source to the target and vice versa, when the same replication set is updateable at either end of the replication and you want to resolve conflicts at the row level?

Forces

All of the forces that were described in the Master-Master Replication pattern apply in this context, and there is one additional one. The relevant forces are repeated here for convenience.

Any of the following compelling forces would justify using the solution described in this pattern:

Need for updateable copies when not connected. The application at the target has to be able to update data even if the source database is not reachable.

Optimistic concurrency control. You have chosen to allow updates to a replication set without attempting distributed data updates to the corresponding replication set to keep it consistent (for example, because the computers are not permanently connected to each other). This is called optimistic concurrency control because it assumes that conflicts will occur but that they will be few in number. This type of concurrency control requires that you use conflict detection and resolution methods.

If you cannot afford the risk of conflicts, you may choose to use the Pessimistic Concurrency Control pattern. (Both OptimisticConcurrency Control and Pessimistic Concurrency Control are patterns described in [Fowler03].)

The following enabling forces facilitate the adoption of the solution, and their absence may hinder such a move:

Tolerance of latency. The applications on both source and target can cope with the fact that changes by other applications may not be visible immediately.

Network efficiency. Network characteristics, such as reliability, bandwidth, and network latency (responsiveness) allow the participating databases to exchange replication data with sufficient speed. The expected rate of transmissions will not saturate the network connection.

Low likelihood of conflicts. If the copies of the same item are updated on both source and target within the same transmission interval, the conflict has to be resolved, which results in one update overruling the other. Performing this conflict resolution consumes processing resources. If this additional workload is likely to be a problem for the target, then to use this pattern the likelihood of such conflicts should be fairly low.

Well-defined synchronization times. There are well-defined points in time where the relevant parts of the databases can be brought into consistency. For example, whenever a laptop is connected to the corporate network, the replication process is started automatically or manually.

Solution

Create a pair of related replication links between the source and target as described in the Master-Master Replication pattern. Additionally, create a synchronization controller to manage the synchronization and connect the links. This solution describes the function of one of these replication links. The other replication link behaves the same way, but in the opposite direction. To synchronize more than two copies of the replication set, create the appropriate replication link pair for each additional copy.

Hint: When designing the replication link, it is important to know what types of conflicts can occur and how to handle them so that the integrity of replicated data remains intact. The design of conflict detection and conflict resolution is described in the Master-Master Replication pattern.

Figure 1 shows the use of the replication building block and its elements to design the solution for master-master synchronization, and the added services to manage the relationship between the pair of links.

Ff650702.Des_Synchronization_Fig01(en-us,PandP.10).gif

Figure 1: Master-Master Synchronization using two related replication links

Controller

The synchronization building block is an extension of the replication building block and consists of two replication links and a synchronization controller. The controller manages the synchronization and relates the replication link pair.

The controller uses a small repository to keep track of the transactions. This repository contains information about the replication links and the transmissions on each of them. Figure 2 shows a data model for this repository.

Ff650702.Des_Synchronization_Fig02(en-us,PandP.10).gif

Figure 2: Database design for handling synchronization data

At the start of every transmission, the controller reads the start time of the last synchronization for this replication link from the repository. It then invokes the Acquire service to get the replication set from the source. The controller waits until the Write service notifies it that it has written the replication set to the target, and then the controller invokes the Acquire service of the second replication link to get the target's replication set. This replication set now serves as the source for the second link, and the source for the first link now serves as the target for the second link. When the transmission is complete, the Write service of the second link notifies the controller. Finally, the controller writes the start time for this synchronization into the repository, which shows that the synchronization is complete.

Source/Target

To use this pattern, you must ensure that the following is true on the source and target:

Every table in the replication set has a replication key. A replication key is either the unique key that identifies the table or a combination of columns that uniquely identifies each row.

Any rows that have been updated are marked as such. To mark a row, you typically use a timestamp, which indicates the date and time of the change. If the change is a DELETE, you do not actually delete the source row yet. Instead, you add a delete flag either on the row itself, or in an additional table (see the Hint following this list) with the same keys. If you store the keys of deleted rows in an additional table, you can delete the rows from the main table and synchronize on the shadow tables. You must ensure that applications never read rows with the delete flag set.

Clocks of the participating computers are nearly synchronized. To avoid problems caused by different time zones, all timestamps should use the same time zone.

The application does not change the unique key that the synchronization uses; instead, the application deletes the row with the old value and inserts a row with new values.

Hint: Marking updates requires that you add columns to the existing tables. If you cannot add these columns, then you need to create a shadow table for every table in the replication set. These have the same primary keys as the main tables and they store the date/timestamps, and delete flags. Changes to these tables need to be synchronized too.

When the application makes changes to the rows of the source, it also writes information for the replication link to use, as Table 1shows.

Table 1: Additional Application Actions to Identify the Replication Set

INSERT The new row is marked for transmission by the next transmission.
UPDATE The new row is marked for transmission by the next transmission.
DELETE The updated row is marked for transmission by the next transmission.

If you are using an RDBMS, you can use one of the following means to mark and log the rows without changing the application:

The logging system of the underlying RDBMS (in this case, no changes to database schemas are required)

Additional artifacts in the database, such as triggers (this requires database schema changes)

Acquire

In this pattern, the Acquire service is invoked by the controller module and is passed its context. It reads the replication set to get the rows that have been changed or marked as deleted since the last transmission.

Manipulate

There are no special considerations for the Manipulate service in a synchronization environment other than all manipulations of the data must be reversible. This is because the related replication link must perform the complementary manipulations of this service. For example, if you concatenate a bank code number and an account number in the first transmission, then you must be able to split this string on the reverse transmission.

Write

Since the solution uses optimistic concurrency control, the Write service must check for conflicts before writing to the target. Methods for conflict detection and resolution are presented in the Master-Master Replication pattern.

If a conflict has been detected, an appropriate conflict resolution method must be called, which either returns the winner or a new row to be written instead of the original one. If the conflict resolution method accepts changes from the source, or if it returns a modified row, this row is to be written to the target. However, if the conflict resolution rejects the row from the source, it must be discarded and must not be written to the target.

Hint: Use of DELETE flags leads to a need for cleanup, which means that at some point you need to physically delete these rows from all the copies that they exist in. To do this, each copy needs to know the synchronization times for all directly related replications so that it can use these times to know which rows can safely be deleted. Rows whose timestamp is older than any of the related synchronization times can be deleted.

Example

This example outlines a common implementation of the Master-Master Row-Level Synchronization pattern. The replication unit is a row. The rows in the replication set are marked with a timestamp and a delete flag. Hence, every table has two additional columns. The applications must not read any rows that are marked as deleted, and it should never read the additional columns (that is, do not use statements such as SELECT * FROM).

Figure 3 shows the algorithm for detecting and resolving conflicts when timestamps and delete flags are used. In this case, the most recent timestamp wins. If the row in the transmission has the most recent timestamp, it is written to the target. If it doesn't, the target row is left untouched and the transmission row is discarded. Overall integrity will be restored when the related replication link runs.

Ff650702.Des_Synchronization_Fig03(en-us,PandP.10).gif

Figure 3: Synchronization algorithm for most recent timestamp wins

The following list provides more information about each step in the algorithm shown in Figure 3.

Algorithm using timestamps for conflict detection

1.Get the last synchronization time from the Controller.

2.Acquire a row from the replication set.

3.Conflict detection: Check the corresponding target row to see if it has been changed since the last synchronization by comparing the target timestamp with the synchronization timestamp.

4.Potential conflict?

No: If the timestamp of the target row is older than the synchronization timestamp, the row has not changed and you can write the UPDATE; skip to step 7.

If there is no corresponding target row, then assume this is an INSERT and skip to step 7.

Yes: If the target row has changed, use conflict resolution.

5.Conflict resolution: Apply the conflict resolution rules. This example uses the "latest timestamp" rule, so compare the target row timestamp and the transmission row timestamp.

6.Source row win?

Yes: If the timestamp on the transmission row from the source is more recent, proceed to step 7.

No: Discard the transmission row and skip to step 8.

7.Write the transmission row to the target.

8.More changed rows?

Yes: If there are more changed rows, repeat the sequence beginning at step 2.

No: If there are no more changed rows, proceed to step 9.

9.Write the start time of the synchronization into the Controller metadata.

An implementation of a synchronization with row-level conflict resolution based on the services of Microsoft SQL Server is presented in Implementing Master-Master Row-Level Synchronization Using SQL Server.

Resulting Context

This pattern inherits the benefits and liabilities of the Data Replication and the Master-Master Replication patterns, which are not repeated here. It also has one additional liability.

Additional Liability

Cleanup after synchronization of DELETE operations. During synchronization you must not physically delete the rows until the information about the deletion is transmitted to targets. Eventually, after all transmissions are complete, you should physically delete the rows.

Operational Considerations

When using Master-Master Row-Level Synchronization, you must ensure that the transmissions do not interfere with normal operations. This can be achieved by one of these alternatives:

Lock the participating databases to prevent any other update activity.

Perform the whole synchronization within a database transaction, and thereby isolate it from any other activity.

Store the timestamp of when the synchronization started. This ensures that changes made by transactions that run concurrently with the synchronization are not missed. Changes made by those transactions are sent by the next synchronization.

For more information, see the following related patterns:

Patterns That May Have Led You Here

Move Copy of Data. This pattern is the root pattern of this cluster; it presents the overall architecture for maintaining copies of data.

Data Replication. This pattern presents the architecture of data replication, which is a particular way of moving copies of data.

Master-Master Replication. This pattern presents the high-level solution for a data replication where there is bidirectional data movement between source and target. This includes conflict detection and resolution to handle concurrent updates to different copies of the same data in the same transmission interval.

Patterns That You Can Use Next

Implementing Row-Level Synchronization Using SQL Server presents the pattern for implementing a row-level synchronization by using SQL Server.

Other Patterns of Interest

Master-Subordinate Snapshot Replication. This pattern presents a design for transmitting a full replication set (not just changes). This can be used to equalize the source and target sets as a starting point before establishing a synchronization relationship.

Acknowledgments

[Fowler03] Fowler, Martin. Patterns of Enterprise Application Architecture. Addison-Wesley, 2003

patterns & practices Developer Center

Retired Content

This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.