Muokkaa

Jaa


GPIO buttons and indicators supplemental testing

This topic describes Windows 8.1 test scenarios for hardware buttons and indicators, to ensure an optimal user experience for various form factors.

In this section

Topic Description

Test automation tools

GPIO test automation uses the MITT platform.

Integration testing

It is important to perform integration testing to ensure an optimal end-to-end user experience

GPIO logging and investigations

This topic describes logging and investigations for GPIO testing.

Buttons under test:

  • Power button
  • Windows button
  • Volume buttons
  • Rotation lock button (optional)

Indicators under test:

  • Docking indicator
  • Laptop/slate mode indicator

GPIO tests in MITT