Compartir vía


Adjust work to fit sprint capacity

TFS 2018

Check your team's capacity after you've defined all the tasks for all the sprint backlog items. You can consider adding more items onto the sprint if your team is under capacity. If over capacity, you'll want to remove items out of the backlog.

Next, check whether any team member is under, at, or over capacity. Or, if someone hasn't even been assigned any work. Use the capacity bars to make these determinations. If you haven't yet set capacity for your team, do that now.

Over capacity

Use this article to learn how to:

  • Adjust your sprint plan if your team is over or under capacity
  • Load balance work across your team
  • Quickly reassign tasks to another team member

Prerequisites

When you create a project or a team, backlogs get created automatically. Each team has access to their own product, portfolio, and sprint backlogs.

Prerequisite Description
Project Administrator or Contributor member You must be added to a project as a member of the Contributors or Project Administrators security group.
Stakeholder access To add or modify work items, you must be granted Stakeholder access or higher.
Contributor member or Allow perms on To view or modify work items, you must have your View work items in this node and Edit work items in this node permissions set to Allow. By default, the Contributors group has this permission set to Allow. For more information, see Set permissions and access for work tracking.
Defined iterations To use the Planning pane, your team administrator must define iteration (sprint) paths and configure team iterations.

Open a Sprint backlog for a team

  1. From your web browser, open your team's product backlog. (1) Select the team from the project/team selector, choose (2) Work, (3) Backlogs, and then (4) the product backlog, which is Backlog items (for Scrum), Stories (for Agile), or Requirements (for CMMI).

    Open the Boards>Backlogs page

    To choose another team, open the project/team selector and select a different team or choose the Browse option.

    Choose another team

    The set of sprints selected for your team appears in the left pane. If you don't see any sprints listed, you can add sprints or select existing sprints for your team's use. To learn how, see Define sprints.

  2. Choose the sprint you want to plan.

    Choose another sprint

    The system lists only those sprints that have been selected for the current team focus. If you don't see the sprints you want listed, then see Define iteration (sprint) paths.

Check your team capacity

To view capacity charts, you'll want to turn Work details on for a sprint.

Turn work details on

Move items out of a sprint

Move items from the sprint backlog back to the product backlog if your team is over capacity. This action resets the Iteration Path to the default set for your team. Or, you can move the item into the next sprint your team works in. All the tasks that you've defined for that item move with the backlog items.

Here we select the last item in the sprint backlog and drag it to the product backlog.

Drag items back to product backlog

Tip

Dragging a backlog item to the backlog or another sprint reassigns all child tasks to the same iteration path. Also, you can multi-select several items and drag them to the backlog or another sprint. Users with Stakeholder access can't drag-and-drop work items.

Balance work across the team

To quickly reassign tasks, drag the task onto the new assignee's capacity bar.

Reassign tasks

Next step